Number of Date conversion
Hi, in my answers date of report appears as 20,071,224.0, I want to convert this number to Date as MM-DD-YYYY format, this isn't a time Dimension. do we need to convert this column in RPD or can we do answers, please help me on this.OBIEE 10.1.3.4.1
Try this
SUBSTRING (CAST (20091228 AS CHARACTER (30)) FROM 1 TO 4). '-' || SUBSTRING (CAST (20091228 AS CHARACTER (30)) 5-2). '-' || SUBSTRING (CAST (20091228 AS CHARACTER (30)) 7-2)
Tags: Business Intelligence
Similar Questions
-
MacBook Pro 13 inch, early 2011
10.10.5 version
Processor 2.3 GHZ
Memory 4 GB
Storage 318,84 GB
A large number of dates on my photos in Iphoto have changed on 1 January 00.00.00. How did this happen and how to fix it? Con
What has changed since they were correct?
What version of iPhoto do you run?
Best cure is probably to restore your backup when it was correct
LN
-
Possible reasons:
Scripture cannot be performed because the number of data channels does not match number of channels in the task.
When writing, provide data for all channels in the task. You can also change the task so that it contains the same number of channels as the written data.
Number of job channels: 8
Number of data channels: 1Lama says:
The DAQmx vi writing gives me the error. If I run a single channel, isn't a problem. Multichannel gives me error.
You are funny! Why tie yourself to work VI (single channel) instead of one that gives you errors (multichannel)?
(If your car does not work, you bring car your wives to the mechanic, right!)
What is the exact text in the multichannel 'physical channels' when you do the AO control?
Lama says:
I did a sequence to ensure that each function has been run in the correct order. Wouldn't a race condition.
All you have to do is wire the 'start of task' error at the entrance of error of the DAQ assistant and then back to 'stop task' and things will run in order. Guaranteed! Think the stream! Everything else can run in parallel or the order is irrelevant.
First convert the sequence stacked to a sequence of plate, remove the flat sequence and add the mentioned son. Now, do a "cleaning pattern.
A when stacked with the inhabitants of the sequence is one of the worst construction you can possibly do. It makes the code difficult to follow, impossible to maintain, difficult to debug.
-
So the question is, which is rounded up my numbers? Or, more generally, what have I done wrong here?
The main program this sub.vi works for the needs these numbers as strings, and I think I picked the wrong number to string conversion .vi or missed a configuration somewhere, because the program takes perfectly good number like - 0.340316 and rounded to-0 (zero negative? it's zero, negative).
The zero negativity hand, the number of decimal string .vi is rounded up my whole numbers.
The function is supposed to be converted in its entirety. Just go to help > show contextual help and read the description. The desired function is called fractional number of string.
-
Function to count the total number of data channels
I know that I had stumbled on a tiara function that returns the number of data in all of my data channels. I can't seem to find the thread where I had seen it. I'm looking to replace a script a long time user with this simple function in my future coding.
Thank you!
Hi CrshTstr,
I actually still use GlobUsedChn for that. In more recent versions of DIAdem, you can use commads as GroupChnCount() or Data.Root.ChannelGroups (1). Channels.Count to return the number of channels in a particular group. But regardless of which group the channels are in the GlobUsedChn variable always returns the total number of channels currently on the data portal.
Brad Turpin
Tiara Product Support Engineer
National Instruments -
ground surface zero pole to read data (number of data 700) 1 d
I would go for the transform of real data (number of data 700) 1 d Laplace and the plot of surafce pole zero for pic showing the poles.
Can someone help me
Thank you
AK
Hello cory:
After laplace {x}, how can abs suface (laplace {X}) which will give me a pic of pole zero in 3D surafce (s palne).
Thank you
AK
-
dynamic double bit data conversion
It could be very simple, but I was confused. I have current data and average data as in code. I want to build the table using these data, save them on my hard drive and open in word with header (current and average)
Problems:
I have data from two sources in lead generation and versions table as shown entry table to write on the worksheet vi. I get the error source is dynamic and double sink is a bit. It is the most difficult part of my life to find out what range of conversion to use.
When I run the vi (lets assume the good range of conversion is connected and there is no conversion error) pops up the dialog for path that comes up constantly on dialog
Ideally I want appears on the screen when I press on would go so that I can browse location to save the file, and once the path is specified vi works continuously and the data is written to the worksheet while vi is running.
Thanks a lot for reading and help
See you soon
Welcome to the evil world of dynamic data. What you really want to use is the merging of signals feature. When you do this a dynamic data conversion will be automatically added between the signals to merge and writing on a spreadsheet file.
You can consider using writing to the file position as directly accepts dynamic data.
With respect to the path, use a shift register.
-
query to find the number of dates
Hi all
I need assistance in creating a query. Ask the details I have given below.
Table:
Create the table emp_record (emp_id number, emp_join_date date);
insert into emp_record values (1, 1 June 14 ');
insert into emp_record values (2, 26 May 14 ');
insert into emp_record values (3, 16 May 14 ');
insert into emp_record values (4, 14 May 14 ');
Suppose I ran the query with sysdate, we need to subtract the date of sysdate, then a report should be prepared in function number how many have subtracted values sysdate below 0 to 3 days, 3-6 date.
Output should be like
0 - 3 3-6 6-9 days more than 9 days
1 0 1 2
Please help to write this query. Thank you
Hello
Do not essentially repeat the same CASE expression with the same types of calculations for each column. You can do the job with a CASE expression, like this:
WITH got_group_id AS
(
SELECT THE CHECK BOX
WHEN emp_join_date< trunc="" (sysdate)="" -="" 8 ="" then ="">
WHEN emp_join_date< trunc="" (sysdate)="" -="" 5 ="" then ="">
WHEN emp_join_date< trunc="" (sysdate)="" -="" 2 ="" then ="">
0 OTHERWISE
Group_id END AS
Of emp_record
WHERE emp_join_date<= sysdate ="" --="" if="">=>
)
SELECT *.
OF got_group_id
PIVOT (COUNT (*)
FOR group_id IN (0 '0-2 days'
, 3 AS a "3-5 days.
6 as a "6-8 days"
, 9 as "9 or more days.
)
)
;
It will be much easier to maintain when needs change.
ED mentioned, using a string, 1 June 14 ' in a place where we expect a date is just a matter of trouble. 2-digit years are too.
-
What is the maximum number of data warehouses in a system of Vcenter?
What is the maximum number of data warehouses in a system of Vcenter?
I had a look at highs of configuration in http://www.VMware.com/PDF/vSphere4/R40/vsp_40_config_max.PDF , he lists100 in the section of SMI-S
SMI-S section list max number of ESX host as 100, although it is 300 in the maximum of vcenter server. Should I look for in the section of SMI-S?
Only if you plan to use SMI - if she does not go with the maximum rates for vCenter - and you are correct to look at the number of hosts since it is the ESX hosts that communicate to the SAN not vCenter-
-
HI team,
I have a problem, how we can convert number in date format?
This is the result of the query.
SQL > col START_TIME for 999999999999999999999999
SQL > select start_time in qrtz_triggers;
START_TIME
-------------------------
1364243906000
1364589406000
So, I have to change the date format niumber rto.
My date format as for example: "" Mar 25,2013 20:36:45 ""
Please suggest me...
Thank you
Chavigny
Published by: 939938 on March 14, 2013 06:39This is the number of milliseconds since January 1, 1970.
SQL> SELECT to_char(to_date('01/01/1970','mm/dd/yyyy')+1364243906000/24/60/60/1000 2 ,'Mon dd, yyyy hh:mi:ss PM') FROM dual; TO_CHAR(TO_DATE('01/01/1970',' ------------------------------ Mar 25, 2013 08:38:26 PM
So in your query instead of start_time use
TO_CHAR (to_date (' 01/01/1970 ',' mm/DD/yyyy') + start_time/24/60/60/1000,' Mon DD, YYYY HH: mi: ss PM "")Published by: kendenny on March 14, 2013 08:31
Had used mm instead of e for the minutes. -
maximum number of data files in oracle
I have the oracle10g database. I want to see the maximum number of data files in the database. One way, we can trace the control file and we can find... y at - it another way, we can see this parameter value? Please let me know.The db_files parameter controls this thing.
Aman...
-
Date conversion variable number
I could do this using javascript, but I wanted to do this through if possible liquid so I can use it in more liquid logic. I want to reach adds a number of hours at a variable 'date' and have the date calculated, if I worked in PHP I would use something like a UNIX time however I can't find an equivalent to work in British Colombia.
For example say I have today dateTime variable " 2015-10 - 01 T 13: 02:33" I want to add 1,000 hours to what is about 42 days putting us around November 11, I can't quite understand how to achieve this, if I were to do something like {{globals.site.dateNow |}} "" date: "YYYYMMDD" | {{more: days-}}, where days = {{1000 | dived_by: 24 | cleli}} this will work until we had to move from October to November, in this example I'd end up with a variable that was closest to the 43rd October which obviously isn't quite right.
I think the key is in making the date as a total number of hours, or by converting the 1000 hours in a dateTime variable valid to add to the Start date however after bother for a few hours, while going through the Developer Referencedocumentation, I can't quite work as it should. Any help would be appreciated.
Read this:
That should help
-
Conversion of number in Date in Oracle sql
I have some values in Field1 as
20110820,
20110821,
20110822
which is a data type number and
which is something like yyyymmdd.
I want to convert to date as "mm/dd/yyyy" format
I have to use in a select query, something like if (A.field1 = 0, 01/01/2000, A.field1).
How can I achieve this?Probably not the right forum but maybe
Select f1, to_Date (substr (date1, 7, 2) |) » /'|| substr (date1, 5, 2) | » /'|| substr(date1,1,4), ' dd/mm/rrrr') as date2
Of
(select 0 F1, 20110820 like double date1) -
Hi all
I'm doing an A - D conversion. Conversion table is given in attachment, as well as the file vi. I got three 8-bit during serial communication data and join them to form a 24-bit number (I mention this so there is no question why mets implement entry like that). As you can see in the table of conversion without exit number must be greater than Vref, however in this implementation, I get a flow of 2 * Vref.
Can someone please help me find the error.
Darko
The conversion formula is implemented for bipolar data while your VI U32. You cannot represent negative numbers with U32 (unsigned integer).
Lynn
-
Problems of data Conversion from 8.9 to 9.1 HRMS
We do the HRMS 8.9 to 9.1 upgrade. We met below error while doing the CONVERSION OF DATA.
After the initial analysis, we found that this column is missing in the rendered Table. Please help what steps should take this problem to overcoem.
Number 1: -.
PeopleTools 8.52.04 - engine application server
Copyright (c) 1988-2012 Oracle and/or its affiliates.
All rights reserved
PSAESRV service request has started 21.51.43 2012-03-25
Process 517495 resumed after the UPG_SC90 step. HCSCM30. Step00 (108 538)
File: error vob/peopletools/src/psappeng/aedebug.hSQL. Stmt #: 1620 error Position: back 59: 904 - ORA-00904: "HR_PTCS_SERVICEID": invalid identifier
Failure of SQL stmt:INSERT IN PS_HCM_EO_TXN (nom_de_transaction, EOAWPRCS_ID, HR_PTCS_SERVICEID, DELEGATION_INIT, DELEGATION_APPR) SELECT TRANSACTION_NAME, EOAWPRCS_ID,' ', DELEGATION_INIT, DELEGATION_APPR OF PS_EO_TRANSACTIONS
Process 517495 ABENDED to step UPG_SC90. HCSCM30. Step01 (SQL) - RC = 904 (108 524)
Process %s ABENDED to %s.%s.%s (step %s) - RC = %s
PSAESRV filled with 21.51.44 service request 2012-03-25
Question No. 2: -.
PeopleTools 8.52.04 - engine application server
Copyright (c) 1988-2012 Oracle and/or its affiliates.
All rights reserved
PSAESRV service request has started 21.51.43 2012-03-25
Process 517496 resumed after the EOUFDATACONV step. Process.Step003 (108 538)
File: error vob/peopletools/src/psappeng/aedebug.hSQL. Stmt #: 1620 error Position: 90 return: 904 - ORA-00904: "GPCH_CA_RELATION": invalid identifier
Failure of SQL stmt: SELECT 'X' FROM PS_INSTALLATION WHERE NOT EXISTS (SELECT 'X' "FROM PS_GPCH_CA_DATA2 WHERE GPCH_CA_RELATION <>'")
Process 517496 ABENDED to step UPG_GPCH90. HCGCHP50. Step010 (make when) - RC = 904 (108 524)
Process %s ABENDED to %s.%s.%s (step %s) - RC = %s
PSAESRV filled with 21.51.44 service request 2012-03-25PeopleSoft Patches and site updates, I see that required to install HRMS 9.1 (need to apply to the demo), HCM91 MP5 CUMULATIVE in required.
Search
Product range: HRMS
Product: install
Version: 9.1
Option: Required for installation.MP5 contains, as you said, to bundle 7.
Just checked on an environment that has no package 8 and this area does not reside in the folder.
Errors looks like to they required to upgrade PRJ872267 HRMS UPGRADE 9.1 BUNDLE #12.
I can see the two sql sent in this patch.Have you installed PeopelSoft HRMS 9.1 or the latest version, including the Feature Packs?
Maybe you are looking for
-
It seems to be an interest in restoring the large Lucida font as was the Mavericks and OS prior to OS el capitan, which now sports a rather hideous police, at least for imac users. There is one program out there that does it, but admits bugs. I would
-
Question about the HP 2AFB hand/card mother.
I'm looking to level/add in a graphics card in my PC for games purposes. I was wondering if a GeForce GTX 710 would be able to be added to this motherboard? Any answer would be useful!
-
nesting option missing when inserting components navbar "bootstrap".
The nesting option is missing when you insert components navbar "bootstrap". It is there, but I had to go back and do something. Now it will only insert the navigation bar after the container div, which is not what I need.
-
Open the link in a new window in 11 reports
HelloWe are currently using Oracle reports 11.1.2. We open rdf with desformat = PDF reports and currently have a link in the header of the report entitled "Export to Excel". The link works properly, however, rather than the excel report opening in th
-
How to get more than one address in the same Google Map in Muse?
Hi, how can you get several addresses in the same Google map in the Muse?