OCA certification - test sequence
The OCA Certification requires two steps:
Step 1 -This exam.
- 12 c oracle database: SQL Fundamentals 1Z0-061 or
- Oracle Database 11g: SQL Fundamentals I 1Z0 - 051 or
- Oracle Database SQL Expert 1Z0-047
Step 2 -this exam.
Can I take an exam in first step 2 ? Then take a test in step 1, or SHOULD be taken in the order of 1 step 2 step?
I already studied for "11g program with PL/SQL 1Z0-144" and would make the road before taking an exam in the first step.
Thank you for your help.
You can take the exams in any order. The Oracle certification program will provide credentials when all requirements have been met - no matter the order in which they were welcomed.
Tags: Oracle
Similar Questions
-
Hello world
I do a test configuration for my PCB.
My project is to make a sequence of Test in Labview to test, measure and perform computations for devices on PCB.
I want to do as 'HIT' start and the test sequence begins one by one. I can't afford Teststand if want to labview.
Can you suggest me a model of design for the test sequence faster?
Hi Drew,
less information, I would say: try a state machine approach!
-
Why the total time required for the test sequence is different during the test runs
Hello
-J' have different test resources to test our product which includes engines and the NOR-Box (6351).
-Number of test files in sequence that are called during the test (ca. 20)
-The problem is that when I run these test sequence files separate (say only 3 out of 20), total time by these tests are t1, t2 and t3, but when - I left all 20 tests to run without jumping all the time needed by the 3 tests above is t1 + 60 s, t2 + 80 s and t3 + 50sec. Why it is so and how can I avoid this problem.
-The tests are motors to move, take samples or box then save them on my computer after testing the limits. Since they are time critical, when I do all the running tests in a test go a lot do not PASS. I can't run them separately because it takes more time, more interference by user and also more than one report that is not desired.
-J' tried unloading after execution steps, but it did not help.
Kind regards
RB
This probably depends on that made your sequence. Have you tried shrink where extra time is being spent? You can time how long different parts of your sequence are following the steps of the expression as follows:
Locals.StartTime = Seconds()
Locals.ElapsedTime = Seconds() - Locals.starttime
You can also watch time module in your reports. There is nothing specific on TestStand that should cause some sort of slow down like this. I recommend trying to figure out where the extra time is being spent. I suspect once you do, the cause will become obvious.
-Doug
-
Original files are missing after re-installation (context.ctl test sequence)
Hello
After the passage of LV2010 to LV2013 my VIa are missing these files for eample
LabVIEW test sequence - Context.ctl
TestStand GetPropertyValue (String)
I also reinstalled Teststand.
How can I get the files back? I fdont know if they were part of Labview and Teststand-installation.
Thanks for help
TM
She's.
After a repair of Teststand installation files are back.
-
Execution time of a number of steps in a test sequence
Hello
I wonder what is the best way to time the execution of a number of steps in my test sequence, so I can report to a database.
Basically, this time will be the starting time of the UUT and may differ from room to room, so I want to capture him.
Thank you best regards &,.
Don1.
Hi Don1,
A very simple way to do this would be to use an expression before and after to capture time and compare the difference, for example.
locals.startTime = Seconds()
...
measures
...
locals.bootTime = Seconds() - locals.startTime
-
Hello
I am very new to TestStand, please see the question below and give advice.
I want to set up a simple test sequence.
I want a message to popup on the screen that asks the operator what unit of 6 units (maximum 10) to test (i.e. There is say box of 6 to 10 s to select from).
Then the sequence goes to the specific part of the sequence and performs the test on a unit that either has been selected.
What is the best way to do it?
I use pop-up message windows to do this? and if so what should I connect to the correct part of the sequence file?
Pop-up message windows allow only 6 options to select from?
Thank you
Hello
You can do this by using the method of message popup. You can ask the user what unit want to run message by inserting in the expression of the message in the message popup step parameters. Something like below
"Enter the number of execution unit.
1 Unit1
2 unit 2
.......
10 Unit 10 "
then check the 'Enable response text box"tab is different from the stage. When the user enters the unit number you can get the value entered by the user by inserting the below statement post expression of message popup step parameters
Locals.String = Step.Result.Response
Note: The string is a local variable to be set.
Convert string to number and send that output to pass the expression you can use a sequence of call step to call the sequence according to which must be performed. (I hope your each unit will file separate sequence)
I hope that this solves your problem. If you do not understand please let me know so that I can put a small example and send it to.
See you soon,.
Krishna
-
Oracle DBA will never offer 2nd chance for certification tests?
Oracle DBA will never offer 2nd chance for certification tests?
This time Oracle Sun java offers a 2nd chance for testing certification.
So if you miss the 1st try, you get another free trial.
Thank you Roger
Think about that provide you a URL so that people can read the fine print. Also certification of high-end Java identifythe which he made, and does not apply.
Like any seller Oracle can offer carrots if she feels she will lead directly or indirectly, profits increased. My guess is that they probably won't this offer on DBA tests... remember the historical lineage of exams have been through Sun Java...
-
As part of the SAR cert is "have a NW/dedicated separate between hosts ESXi (on which we GOS) mandatory for VMotion or is - OK to use IP for VMotion management in the execution of Certification tests.»
Note that the verification passed Test when you use management IP for Vmotion and without a dedicated connection to NW between ESXi hosts.
Separate dedicated network interface cards preferred. No problem with the test after this change case.
-
Certification test Support FAQ Page showing NO DATA to the United Kingdom.
Test Support FAQ Page indicating NO DATA in the United Kingdom for me at the time of this post.
Location: [http://www.oracle.com/education/certification] - Support FAQ.
A link to [http://education.oracle.com/pls/web_prod-plq-dad/db_pages.getpage?page_id=82#5Q1A]
(In fact I think its all about education support pages certification not only).Oracle Certification Testing NO_DATA | NO_DATA NO_DATA NO_DATA NO_DATA NO_DATA NO_DATA NO_DATA NO_DATA NO_DATA NO_DATA NO_DATA NO_DATA NO_DATA NO_DATA NO_DATA NO_DATA NO_DATA NO_DATA NO_DATA NO_DATA NO_DATA NO_DATA NO_DATA NO_DATA NO_DATA NO_DATA NO_DATA NO_DATA NO_DATA NO_DATA NO_DATA NO_DATA NO_DATA NO_DATA NO_DATA NO_DATA NO_DATA NO_DATA NO_DATA NO_DATA NO_DATA NO_DATA NO_DATA NO_DATA NO_DATA NO_DATA NO_DATA NO_DATA NO_DATA NO_DATA NO_DATA NO_DATA NO_DATA NO_DATA NO_DATA NO_DATA NO_DATA
Published by: bigdelboy on October 26, 2009 00:45 (I also raised {: identifier of the thread = 3854104} as it is indeed a bit more widespread... be aware that countries other than the UK may be OK).bigdelboy wrote:
Hans said on the other thread appearently there was an indication of Oracle Education Web Sites are updated until Thursday.... Tuesday
-
Past 10g OCA/OCP test - no. $ class - OK to take the test of 11g upgrade?
I passed the tests OCA and OCP 10g. We have no training $$s so I can't take the a required class to get the official status of OCP.
It will be a problem if I also take review of upgrade of OCP 11 g? I'm hoping to pass the exam of the 11g in the coming months. I hope that we have $$s and I can attend an approved course next year and then complete the appropriate forms to get the status of official OCP 10 g and 11 g OCP. This sequence of events would cause problems?
Edit: I'm talking about the reviews for 'administrator '. Thank you.
Published by: user10251150 on 7 Sep 2010 15:13user10251150 wrote:
I passed the tests OCA and OCP 10g. We have no training $$s so I can't take the a required class to get the official status of OCP.It will be a problem if I also take review of upgrade of OCP 11 g? I'm hoping to pass the exam of the 11g in the coming months. I hope that we have $$s and I can attend an approved course next year and then complete the appropriate forms to get the status of official OCP 10 g and 11 g OCP. This sequence of events would cause problems?
No problems.
Only possible disadvantages could reduce the availability of some of the shorter and cheaper g 10 course that would suit the requirement. Sometimes 11g courses may be accepted for a 10 g OCP DBA, but check first.
(It doesn't affect you, but to confirm it for other readers, the reverse is not true, 10 g training is not accepted for 11g certification OCP DBA... those with a drive of 10g will go 1z0-042/3 and then 1z0-050 (as you do)).
-
ICB does not break breaking set with the code when executing the test test sequence point
I just started using the testbed and I use it with CVI. I am running version 4.2.1 of testbed. I'm currently trying to set up my "*.c files" of project folder appropriate to compile and run under the simple testexe of test bench and also tried the normal sequence editor. Currently, I moved all the *.c files &.h taken in charge in the same directory where the testexec.c... .not sure if it's the best place to put it?... It seems to work OK. However, I saw a few problems once the program is running. Is to show signs cited in my CVI functions but it shows as not fatal execution error: "position of unknown source, library function error, Panel, bar menu, control or a table handle is invalid" before and after pop up window panels. I tried breakpoint to the line of code in a CVI file to the project title for additional information about the error, but it seems that the breaking point is not being invoked as it does NOT run in debug in CVI mode and rather an executable. Across the service installed on the project file are *.c and not *.obj. I appreciate anyones help and give me advice. Thanks in advance
DLL is the only way to interact with code C/C++ in TestStand, Yes.
-
Executable test sequence TestStand deployment
Hello
I would like to automate my test using TS environment and the BT.
My goal is to have one machine with the development of TS (Inc. LV) for construction of test software that is compiled in one .exe file to run on the tested machine that does not have TS or LV
Can I use the software for this task?
It is for the main development computer:
779601 35
NEITHER Developer Suite, English, include 3 years SSP
1
779602 35
NEITHER Developer Suite Automated Test Option, include 3 years SSP
1
It is for the machines to run the tests on:
777774-3505 NI TestStand Base Deployment Engine License 5 unit Bundle
I would like to have an option to monitor the performance of the tests on each machine and if necessary to perform debugging on the tested machine operations.
If the package above will provide this capability so where can I find the documentation to create .exe files to run on test computers?
If not, what software will provide this capability?
Thank you
His Lev
Lev,
These are the correct packages for TS development and deployment. The only thing is that you have little debugging with the deployment license features. If you want to debug, so instead of the deployment license they have licensed TestStand Debug.
http://www.NI.com/TestStand/deploy-compare/
More about licenses: http://digital.ni.com/public.nsf/allkb/B4B7C4ADB9B21B3F86256D360061891F
One thing you should realize is that TestStand creates no executables. Because TS is essentially a scripting language, you deploy the raw files. These raw files feeding the TestStand engine and execute the steps in order.
TestStand comes with 10 different (fully customizable) User Interfaces. What are executables and run above the TestStand engine. They allow you to run your sequence files (mostly scripts). You will only need to use 1 of them. The User Interface is so technically the executable for a deployment machine.
More information on automation TestStand deployment:
http://digital.NI.com/public.nsf/allkb/EE3382373D209449862570A5006572F0
Chapter 14 of the reference manual: http://www.ni.com/pdf/manuals/373435e.pdf
Interfaces user is in Chapter 1 to chapter of the major components:
http://www.NI.com/PDF/manuals/373435e.PDF
I hope this helps.
-
The indicator of the test sequence parameter default setting
Hello
is there a way to test in a subsequence if a parameter has been defined by default in the calling sequence.
Thank you
Hello
Yes it is possible,
Try using RunState.CallingStep.TS.SData.ActualArgs
Hope this helps
Jürgen
-
Several switches inside the a test sequence
Hi all
I'm doing a few stages of switching in a single Multiple digital limit test, so what I did is incorporated all the controls switch in labview. Unfortunately, I got an error when he got to the step with the switching (an error occurred when trying to access device PXI1Slot6
Another process has already logged to this switch module.).Is it possible to disconnect the teststand switch so that the labview vi can be used without interruption, or y at - it another way to do switching multimode in teststand I don't know?
Thank you for taking the time to read.
One more thing...
You can use the adapter of the sequence with a step of the multi-digital. Then create a sequence that will have several stages.
I illustrate this in the sequence file attached.
Let me know if you have any questions.
-
How to proceed after graduating from OCA certification?
Dear community,
Recently I finished preparing my OCA exams and I was hoping to get counsel on how to proceed after two of them. The problem is that there is no database of courses where i live and the only way to enter the world of DBA are having a minimum of 3-4 years of hands on experience. However, do you think I should immediately start working towards my OCP certification after GRADUATING or should I try to move and win a few hands on prior to the certificates way?
"feel free to engage in oracle certification vs real hands on experience, if I lost you there."
Would appreciate any advice or personal opinions!
Thanks in advance!
I wrote several articles on various aspects of this topic:
I just got an Oracle Certification - how can I be hired as a DBA?
Oracle Certification preparation time: I don't know anything about Oracle... but I want to be a DBA.
Oracle Certification preparation time: the way to become an Oracle DBA
Oracle Certification preparation time: Oracle Certified but unemployed Oracle
Maybe you are looking for
-
I have iTunes game and have enjoyed using iTunes Radio without advertising. Recently, when I try to use the radio I get sent automatically to a Apple music sign up page that none of my radio channels work. Is there a way to use the radio or this
-
Yoga 900 bottles loose hinge?
Is it normal for some of the hinges to be a bit loose on the 900 yoga? I wasn't sure since not all of them are loose. Also, I have one of the caps on the loose edge also although I can remove and replace (unless it falls easily). Don't know if it's w
-
Problem with the report and the system of axis 2d
Hi, I'm trying to write a script with tiara, who wrote a 2d axis system in the report but I'm having a lot of problems with it. What I'm trying to do, is make 3 or more system axis 2d in the report, each displaying a part of the data of 2 channels (x
-
Cannot save files on an external drive because of "errors of window 82.
Product name and number: HP Pavilion 6000 series BV601AA #ABA Operating system: Windows 7 Edition Home Premium 64-bit Error message: Unable to copy the file 'C:\Users\hp\Music\Master File\Johnny Hates Jazz - My Secret Garden.mp3' to "J:\Music\Music B
-
Installing old drive in the new computer
I'm about to buy a computer refurbished one on Ebay. The computer comes with a hard disk of 40 GB and installed Windows XP Pro. The hard drive from my old computer which is dead is 250 GB and also has top XP Pro. I prefer to use my old drive from my