Planning the migration tool of LCM

We need to migrate artifacts from Dev to test and Prod using LCM. I know that we migrate entire application and objects using LCM. But
May be the only Forms data migration and business of Dev, Test, prob rule. I want to say that we have about 25 forms of data in planning Dev environment. I just need to migrate these forms of Dev to Prod, only data do not form for the entire application. Maybe do?

I also watch thiis OBE on link but question remain same
http://www.Oracle.com/technetwork/middleware/performance-management/tutorials/PLN-LCM-OBE-095602.html

I learned LCM Ranzal blog, which could help you as well: http://ranzal.wordpress.com/2010/03/24/using-oracles-hyperion%C2%AE-life-cycle-management/

Yes for partial migrations, you can certainly migrate some parts of your application, such as calc scripts, data forms, business, outlines rules, etc. You need to expand the artifacts and select only those that you want to migrate.

Here's the list: http://download.oracle.com/docs/cd/E12825_01/epm.111/epm_lifecycle_management/apfs04.htm

See you soon,.
Mehmet

Tags: Business Intelligence

Similar Questions

  • Planning the migration of BR using schema

    Hi all

    I have EMP 11.1.2.1 and I am planning to migrate global variable, projects, BR, sequence locations, clusters of SCENE to env PROD. Can you please let me know if I copy the application planning STEP Prod in RDBMS schema will it migrate all objects of my BR prod instead of using LCM or export and import from EAS.

    Appreciate your help.

    I assume you mean business EAS rules, they are stored in the repository of EAS RDBMS.

    You have the following options import/export of EAS use LCM or migrate the repository, as documented in the migration of the repository

    See you soon

    John

  • Planning the migration of BR location

    Hi all

    When I do the migration Planning Business Rule between environments, can tell me how to migrate sites and Clusters between environment? I only see (Global Variable, Macros, projects, rules and sequences) for export in LCM

    Thanks for you advise.

    If they are business EAS rules you also have the ability to export/import originating in EAS - import and export

    Just give it a go.

  • Planning the Migration of the application.

    Hello

    I'll migrate planning application using LCM to the same environment and also prod DEV.
    So if I want to migrate an application so should I create second app with the same name and same Plantype name?
    Can I use different App name and name plantype for the second application?

    Thanks in advance.

    You can migrate applications at the same time, but they are few in number:

    Page 128 prior migration planning

    Planning of Migration considerations: Page 135
    http://docs.Oracle.com/CD/E17236_01/EPM.1112/epm_lifecycle_management.PDF

    See you soon... !!!
    Rahul S.

  • Planning the migration

    Hello

    We plan to make the migration for the purposes of planning version 11.1.1.1.3. My question is how many ways we can do planning of migration, and what is the best way?

    Thanks in advance.

    LCM will migrate all objects for example web forms, lists etc, it will migrate essbase objects but not data prior to version 11.1.2
    If you use this method, you don't have to copy the relational database of planning applications.

    If you use the method of copy of database relationship as it takes all the planning through application at once, there is no side essbase.

    See you soon

    John
    http://John-Goodwin.blogspot.com/

  • related to the scheme of planning export/backup before you plan the migration of the app.

    Hello

    I need to take backup of the schema before planning the planning application migration - (from 9.3.1 to 9.3.1)

    (1) should all services of Hyperion be run? for cssexportimport and backup scheme?

    (2) means import/export schema that we linked to datasource/individual application?

    (3) if we copy the SID of the target before the restoration of the schema and then we store SID after that restoration of the scheme will be would it still managed (as I don't know I can check the owner of an application for the source server).

    (4) should stop the services prior to the restoration of the scheme?

    If both users on source and target are named admin and the owner of the application, then you don't need to worry.
    To be honest, if they are both the administrator account by default hyperion same pointless to store the SID, as it's a standard value.

    See you soon

    John
    http://John-Goodwin.blogspot.com/

  • Planning the Migration of applications - 11.1.1.3 to 11.1.2.2

    Hello gurus,

    Could you please help me with the high level steps on the applciation 11.1.1.3 to 11.1.2.2 planning migration

    1. I've done installing 11.1.2.2 in new servers, audited and everything works as expected.

    Now, I want to move planning request 11.1.1.3 to 11.1.2.2 environment through LCM. Is it possible to migrate different versions? If so, what are the high level steps?

    Thank you so much in advance!

    LCM is not generally supported between different versions.

    If you followed the install/config documentation through the method of support for upgrading to 11.1.2.2

    It is possible to upgrade the application of planning by using the upgrade wizard, you can try using LCM if you wish.
    The format of a user/group in LCM is probably similar, then you can try to use the csv export.

    See you soon

    John
    http://John-Goodwin.blogspot.com/

  • Can planning the migration of 3.5.1 for EMP 11.1.1.3, be done directly?

    Hello

    I have a question about migration planning 3.5.1 to 11.1.1.3.

    regarding the previous post
    Migrating Planning 4.1 planning 11.1.3

    We directly need it 3.5.1 a 11.1.1.3 or do we still have to take the way 3.5.1 to 9.3.x to 11.1.1.3.

    Please inform me about this migration.


    Thank you

    Published by: lakshmi on December 8, 2010 09:51

    EW says:
    NOPE

    And to be honest you probably don't want even if it existed. There are so many things under the bridge that came with the tool that you should watch full review

    Are you so sure with your reply NOPE. I've been involved in a number of migration like that. The software can be upgraded, but the demand is certainly, btw I'm not saying this is the way to go just that it is possible.

    See you soon

    John
    http://John-Goodwin.blogspot.com/

  • Planning the migration of applications

    Hi, "

    What are the possible methods/ways to migrate an application from dev to Prod environment planning.


    It include only migration rules, data load... Forms or cube... etc also


    Thnks

    Hello

    If you are on version 11, you can use LCM.
    If you use an earlier version 11, then you just need to do a search here for migration, that it has been repeated many times.

    For example:- Migration of Hyperion Planning Application

    See you soon

    John
    http://John-Goodwin.blogspot.com/

  • Planning the migration of 9.3.3 to 11.1.2.3

    We currently have a project migrating our 9.3.3 existing environments of planning/Essbase 11.1.2.3 again the test environments.  So far all works well, however, we were invited to patch 11.1. 2.3 to 11.1.2.3.500 and I was curious to know if this can cause problems if we need to copy something the 9.3.3 environment. 

    Yes, it should be the same process.

    See you soon

    John

    http://John-Goodwin.blogspot.com/

  • CopyApp vs-planning the Migration utility and objects

    Hello

    Passing of the 9.3.1. to 9.3.1.x.

    If we have similar DB on the other server and want to move the planning application from one server to another with all the objects involved (as Business rule, Calc, variable Substitution, rule file, settings, cache etc.

    What is the best choice?

    How to use the copyapp utility to move objects and a planning application.

    [http://download.oracle.com/docs/cd/E10530_01/doc/epm.931/html_hp_admin/frameset.htm?ch09s01.html]

    Published by: Kumar 1 on October 22, 2010 04:36

    In my opinion I don't like the CopyApp utility and it fell at least in version 11, some people have had success with it, that's just my opinion but you can have a good experience with it.
    You must give it a try and see if it's good for you, it isn't copy business rules

    In addition you are happy with this post? :- migrate a planning application without commissioning information migration

    See you soon

    John
    http://John-Goodwin.blogspot.com/

  • 3850 MC to planning the migration of 5760 MC

    Last summer, we have deployed 15 3850 as mobility controllers in various buildings throughout our campus. We now have additional funds for the purchase of a pair of high availability of 5760. I'm trying to plan how best to access point 3850 closet controllers stand-alone has a 5760 centralized, with interim of the 3850 mobility agents. It is the sequence that I came up with this day - 1. create a dns entry with CISCO-CAPWAP-CONTROLLER to resolve the address of the new 5760 thus access points can find new mobility controller. 2. add sufficient licenses to the 5760 to move the existing populations of AP 3850's. 3 reconfigure the 3850's mobility agents. Is there something that I am on? When I change the role of the MC's 3850 to MY, the attached AP will reboot and find the 5760? Or change the role of the 3850 will require a reboot which will the AP by restarting and discover the new 5760? We also first 2.0, is there a way this can be automated with templates? We also have a 5508 still in service with about 50 1142 that ap attached to it. We bought the 3850's as well as new 2602 and run two parallel wireless networks. Should we remove the 5508 or upgrade code and let in service as an additional mobility controller? Please ask if more information to answer.

    Hello

    A few suggestions

    1. even if you change features of MC between 3850 and 5760 CAWPAP tunnel still terminate on MY. If no point change DNS or DHCP option 43 entry as AP CAPWAP will never come back & would end to 5760 (as long as AP to connect to MY). In CA deployment MC is required for operating license, MRR, mobility, etc. (do not close CAPWAP)

    2. I would say bring 5760 online with the necessary configuration (dynamic interfaces, SSID, etc.) and configure mobility with 3850. Then take a 3850 at a time & change its role to MY & pointing to 5760 as MC. 3850 should be reloaed when changing role. If your access point will be re - register to 3850, but license hang 5760 this time. Post below can give some advice

    http://mrncciew.com/2013/12/12/getting-started-with-5760/

    http://mrncciew.com/2013/12/14/3850ma-with-5760mc/

    3. with regard to 5508, upgrade to 7.6.110.0 (only supported the version that would allow "New mobility") & select "new mobility" feature. Then configure it an a peering with 5760 mobility controller. This will give the benefit of the customer of roaming between your deployment CUWN & CA configuration.

    4. If you want to remove 5508 & move 1142 to 5760, so you must point APs to 5760 as WLC (assuming the 1142 s are not connected to 3850MAs and they are related to classical switches)

    HTH

    Rasika

    Pls note all useful responses *.

  • Planning the migration from DAS to iscsi SAN

    Hello

    We have a physical server running 6 VM ESX 3.5 (1 win SBS 2003 and linux 5) local SAS disks

    It's a 2xquad core clocked at 2.66 GHz dell

    now, let's add a second physical server (dell 2xquad core at 2.5 Ghz) and an ISCSI SAN: we would like to install ESXi on the second server and move all VMs on iscsi storage, so if the first server goes down in a few minutes we can manually set up the other to run all virtual machines (we are a small company and at present cannot afford the company/vmotion license).

    I ask for advice because we would virtualize an old physical terminal so win2003 Server (with 10-15 users, mainly working with MS office applications) using the second new physical server.

    This is the first time that we install a SAN (it's a dell MD300i with 10 disks 146 GB SAS, 5-disc SATA 1 TB for backup and snapshots) and we want to get the best performance out of it. Read the other posts, I understand that the discs are very important in a server virtualization terminal server and having good performance out of it.

    So, with this type of SAN and our workload, we should define a unique group of 5disk RAID with 9 discs and 1 hot spare, with a large ramdisk on it to create one or more data VMFS stores?

    or is it better to create 2 disk groups:

    -1 with two RAID1 disks for terminal server VM

    -1 with seven discs RAID5 for all other VM

    with a global hot spare disk?

    other general suggestions for migration, we will do?

    Thanks in advance

    Guido

    Yes, it's what I would do.

    -KjB

  • Failure of the ACS migration tool

    Hi, I am running the migration tool, the following request:

    Make sure that the database is running.

    ACS DB 4.x is unavailable, enter ACS 4.x database password (encrypted)

    :[******]

    With the password of database simple, used during the installation of the ACS, I get a fatal error at the end of the procedure like this: "Fatal Error! -Unable to connect to ACS 4.x DB! »

    Where can I find the password for the encrypted database ACS?

    After the migration log:

    07/10/2011-11:41:31 MigrationApplicationCLI.getUserInformation (MigrationApplicationCLI.java:953) ERROR - not read invoke ACS 4 password system. Error on line C:\Work\ACS5x\ccweb_views\dgash_acs5_0_lenovo\vob\nm_acs\acs\mgmt\migration\DbPassword\Password.c 1265, calle API

    07/10/2011-11:46:52 MigrationApplicationCLI.getUserInformation (MigrationApplicationCLI.java:953) ERROR - not read invoke ACS 4 password system. Error on line C:\Work\ACS5x\ccweb_views\dgash_acs5_0_lenovo\vob\nm_acs\acs\mgmt\migration\DbPassword\Password.c 1265, calle API

    07/10/2011-11:58:08 JavaUtils.isAttachmentSupported(JavaUtils.java:1308) WARN - cannot find the required classes (javax.activation.DataHandler and javax.mail.internet.MimeMultipart). Attachment support is disabled.

    07/10/2011-11:58:28 ACS4Connector.checkDBConnectivity (ACS4Connector.java:137) FATAL - Fatal Error! -Unable to connect to ACS 4.x DB!

    java.sql.SQLException: [Sybase] [ODBC driver] [Adaptive Server Anywhere] ID invalid user or password

    at ianywhere.ml.jdbcodbc.IDriver.makeODBCConnection (Native Method)

    at ianywhere.ml.jdbcodbc.IDriver.connect(IDriver.java:354)

    at java.sql.DriverManager.getConnection (unknown Source)

    at java.sql.DriverManager.getConnection (unknown Source)

    at com.cisco.nm.acs.mgmt.migration.ACS4Connector.getConnecter(ACS4Connector.java:66)

    at com.cisco.nm.acs.mgmt.migration.ACS4Connector.checkDBConnectivity(ACS4Connector.java:133)

    at com.cisco.nm.acs.mgmt.migration.MigrationApplicationCLI.runExport(MigrationApplicationCLI.java:605)

    at com.cisco.nm.acs.mgmt.migration.MigrationApplicationCLI.main(MigrationApplicationCLI.java:266)

    I use the migration on a VMware machine clone tool, from the console.

    Thanks in advance

    Creation date: November 8, 2011 14:47 created by: James, Edward C(EDWJAMES,338460) migrating the 4.x to 5.x database

  • ISE Migration tool: Unable to connect to the ACS

    Hello

    I try starting the Cisco migration tool to migrate data to ACS 5.2 to ISE 1.1.

    When I run the migration.bat file, I get:

    C:\migTool>migration.bat
    log4j: WARN no such property [encoding] in com.cisco.acs.positron.migration.utils.Log4jTextAreaAppender.
    INFO [main] MigrationApplicationDriver.main:56: applies from the main method.
    Org.springframework.context.support.ClassPathXmlApplicat updating of INFORMATION [hand][email protected] / * /: start date [Thu Jul 11 16:46:09 CEST 2013]; root of context hierarchy
    INFO [hand] loading XML bean definitions of resource path of class [conf/META-INF/beans.xml]
    INFO [hand] instancing of the singletons in org.springframework.beans.factory.s[email protected] / * /: defining beans [exportAuthorizationProfileCache, exportConditionRightOperandCache, exportDevicesCache, exportEnumAttributeIdCache, exportEnumerationCache, exportGenericAttributesCache, exportIdentityAttr
    ibuteCache, exportIdentityDictionaryCache, exportIdentitySourceCache, exportPredefinedDataCache, exportRADIUSDictionaryCache, exportServicesCache, exportManagerImpl, m
    igrationApplicationManager, migrationPhaseStatefulComponent, stateManager, migrationProcedureModel, migrationApplicationGUI, defaultImportObjectHandlerFactory, import
    AllowedProtocolCaching, importAuthZProfileCaching, importDateTimeCaching, importDevicesCaching, importEndPointCaching, importExternalIdentityStoresCache, importIdenti
    tySourcesCaching, importPolicyElementsCache, importRadiusProxyCaching, importUsersCaching, importManagerImp, org.springframework.context.annotation.internalConfigura
    tionAnnotationProcessor, org.springframework.context.annotation.internalAutowiredAnnotationProcessor, org.springframework.context.annotation.internalRequiredAnnot
    ationProcessor, org.springframework.context.annotation.internalCommonAnnotationProcessor]; root of the hierarchy of the factory
    [Main] INFO start parsing of the XML query...
    [Main] INFO start the process XML analysis...
    INFO [Thread-5] Start ACS5 IP connection
    WARN [Thread-5] could not find the required classes (javax.activation.DataHandler and javax.mail.internet.MimeMultipart). Attachment support is disabled.
    ERROR [Thread-5] error occurred during communication with ACS 5.x. (404) not found
    ERROR [Thread-5] error occurred during communication with ACS 5.x. (404) not found
    ERROR [Thread-5] failed to connect to the DCC 5 to start exporting. Make sure that:

    1 migration interface is enabled on the ACS 5 server.
    2 ACS 5 services run.
    3 ACS 5 IP and username and password are correct.
    4 ACS 5 has a compatible license installed.
    INFO [Thread-6] Start ACS5 IP connection
    ERROR [Thread-6] error occurred during communication with ACS 5.x. (404) not found
    ERROR [Thread-6] error occurred during communication with ACS 5.x. (404) not found
    ERROR [Thread-6] failed to connect to the DCC 5 to start exporting. Make sure that:

    1 migration interface is enabled on the ACS 5 server.
    2 ACS 5 services run.
    3 ACS 5 IP and username and password are correct.
    4 ACS 5 has a compatible license installed.

    Then, I click on the export of ACS, and when I put my name to the ACS server and the password, I get:

    "

    ERROR [Thread-9] failed to connect to the DCC 5 to start exporting. Please ensure that: INFO [Thread-9] Start ACS5 IP connection
    ERROR [Thread-9] error occurred during communication with ACS 5.x. (404) not found
    ERROR [Thread-9] error occurred during communication with ACS 5.x. (404) not found
    ERROR [Thread-9] failed to connect to the DCC 5 to start exporting. Make sure that:

    1 migration interface is enabled on the server ACS5

    2 ACS 5 services run

    3 ACS 5 IP and username and password are correct

    4 ACS 5 has a compatible license installed.

    Can someone help me?

    Best regards

    David

    You have activated the web interface of migration? Check that you have configured the computer source of Cisco Secure ACS 5.1/5.2 with a unique IP address. The migration tool may fail during the migration if each interface has multiple IP address aliases.

    Document taken in charge:

    http://www.Cisco.com/en/us/docs/security/ISE/1.0.4/migration_guide/ise10_mig_install.html

    ~ BR
    Jatin kone

    * Does the rate of useful messages *.

Maybe you are looking for

  • No scan option does not appear when I try to scan

    I have an officejet 4315 all in one. using windows 7. an error indicating "no scan option" message when I try to scan. the fax and copier work so I am confused. tried to download a new driver. According to hp, windows 7 will automatically download th

  • C855 satellite won't stop beeping

    Hello Can someone please? My laptop started randomly beeps, then it beeps constantly. As it has a mind of its own! The sound his mute on yet, it still sounds.Someone knows what it is please? Didn't have laptop 2 months! Thanks in advance!

  • How to move files from frostwire to msdia windows player music library

    How can I move my music library of frostwire to windows media player so I can burn it to a disc?

  • I would like to put my laptop on the side screen

    I would like to put my laptop on the side screen. I tried CTRL + Alt + arrows and on the right, click on graphical desktop Option Rotation without success. All ideas

  • arrival not to upgrade to windows 7

    Hi, so that the update made on 15 July, computer desktop packard bell, no response to any inquiry, want to spend so I can change from french to English, had wanted to use the holiday period to change system as I run a business in france and did not h