Points of beginning and end of a song seems to change at random in the Bounce dialog box

Even if I put the departure and arrival within the project, when am I going to bounce the project the bounce dialog box displays the numbers of different from what I've specified. Everyone sees what is happening? Using X 10.2.1 Pro logic.

Advertisement

The start and endpoints of a rebound are determined by:

1 cycle. If a cycle is active when you give the command Bounce , then the start and endpoints of the cycle to determine the length of rebound.

2 selection. If no cycle is active, but there are one or more area (s) selected, the early rebound and the end will be the selections start and endpoints.

3. If no region is selected and the cycle is not active, then the beginning and end of the project are defined as the bouncing range.

http://help.Apple.com/LogicPro/Mac/10.2/#/lgcp190ba9b7

Tags: Professional Applications

Similar Questions

  • Beginning and end of check date

    Hello

    I have a requirement to find a list of people that have dates that overlap.

    Each person can have several Dates of beginning and end, but only one line that has a null term, the current record. If the start and end dates are overlapping, as in the example below, the second row should have a start date of December 24, 2006 and 22 December 2006. Is it possible to list people who have dates and gaps that overlap in the dates.

    Empl_ID Start End Date
    12345 1 JANUARY 2006 DECEMBER 23, 2006
    12345, DECEMBER 22, 2006 13 JANUARY 2007
    12345 NULL JANUARY 14, 2007

    Any help is greatly appreciated.
    Thank you!

    Hi Patrick
    I like where you're coming. I hope you don't mind but I have extended your idea slightly to add in a PARTITION BY clause to make sure that we look at the records for the same person. Also, if we LAG for a previous record shouldn't we us DRAGS the end_date and compare it with the current start_date?

    LAG(END_DATE,1) OVER (ORDER BY START_DATE EMPL_ID PARTITION)

    In doing so, then the results would look like this:

    Empl_ID Start Date End Date Lag
    12345 1 JANUARY 2006 23 DECEMBER 2006 NULL
    12345 22 DECEMBER 2006 JANUARY 13, 2007 DECEMBER 23, 2006
    12345, 14 JANUARY 2007 NULL JANUARY 13, 2007

    This would give the SIGN a problem because in the first record, the OFFSET would be NULL and the last record the end_date would be NULL. So, it seems that some handling of NULL values must be as well which I will deal with later.

    SIGN ((LAG(END_DATE,1) OVER (ORDER BY START_DATE EMPL_ID PARTITION))-START_DATE)

    At all times the difference between the Start Date and the Date of Lag is positive, this means, that there is an overlap which means that we must look for any gap where the SIGN is 1.

    Using the other function, we could use the LEAD like this:

    LEAD(START_DATE,1) OVER (ORDER BY START_DATE EMPL_ID PARTITION)

    In doing so, then the results would look like this:

    Empl_ID Start Date End Date lead
    12345 1 JANUARY 2006 DECEMBER 23, 2006 DECEMBER 22, 2006
    12345 22 DECEMBER 2006 JANUARY 13, 2007 JANUARY 14, 2007
    12345 NULL NULL 14 JANUARY 2007

    When combined with the SIGN becomes: SIGN ((LEAD(START_DATE,1) OVER (PARTITION OF EMPL_ID ORDER start_date)) - end_date)

    This time you would look at the sign at-1

    Personally, I think that I would prefer the LEAD function because one) there will always be a start_date and b) we could replace all possible NULL values with the SYSDATE to get a final calculation like this:

    SIGN (NVL (LEAD(START_DATE,1) OVER (PARTITION BY ORDER OF START_DATE EMPL_ID), TRUNC (SYSDATE))-NVL (END_DATE, TRUNC (SYSDATE)))

    Based on the date is November 17, 2009, you would now get this result:

    Empl_ID Start Date End Date lead
    12345 1 JANUARY 2006 DECEMBER 23, 2006 DECEMBER 22, 2006
    12345 22 DECEMBER 2006 JANUARY 13, 2007 JANUARY 14, 2007
    12345 JANUARY 14, 2007 NOVEMBER 17, 2009 NOVEMBER 17, 2009

    Best wishes
    Michael

  • Noise at the beginning and end of the songs?

    I get a humming sound for a split second at the beginning and end of the songs which can be heard at high volume.  The sound only comes from the left atrium.  I tried a few different pairs of headphones and get the same result, then it is definitely the Clip.

    It of just a feature of the Sansa Clip or is there something wrong with my drive?

    TIA

    I tried ripping the mp3 with two different programs, and it does not solve the problem.  Mind you, these are the same files of music that I had installed on my iPod Shuffle 2nd without noise.

    Today I bought another Sansa Clip and it does the same thing only for the straight path instead of the left.

    My conclusion is that it is an inherent problem with the Sansa Clip.  The reason why some of you can't hear this 'noise', I'm talking about is because I have the ears of a bat.

  • 39L4363D - cannot set the record time of beginning and end of filling time

    Hello

    I have a problem with my 39L4363DG tv (software 7.1.90.34.01.1).

    I'm not able time of filling time of beginning and end of record setting as described in the [Manual | http://www.toshiba-om.net/LCD/PDF/English/L4363-323950-English.pdf] on page 51. The menu item "padding-start" and 'end padding time' are disabled?

    Can someone help me and give me advice on how to solve it?

    Hello

    The charging time can be set for the scheduled recording.

    There is also a priority planning
    If the regular time intervals are ensuites to each other and there is more than one minute between the time of the end of the annex i and the next scheduled start time, scheduled recording will be performed correctly.

    When + start time of filling + and + hour of end padding + are value, the start time and end time more is the time the extra minutes.

    If planning time overlap, priority will be given to the scheduled recording starts first.
    When the scheduled recording that began the first ends, recording will switch to the next regular program.
    At that time, according to how much programming time to overlap, the section from the beginning of the next regular program is not registered.

  • Mobsync.exe begins and ends several times when running directX games

    Whenever I start a current game directx mobsync.exe enforcement begins and ends. It causes a shift in the game and the cheek than the "dee-dum' sound as if I am connect and disconnect a USB device. I changed everything in the system for material. New motherboard, new RAM, different video card, changed to keyboards and mice, disconnect all USB devices and the problem still persists. Mobsync.exe will begin or wmplayer will start then end immediately and that this repeatedly until the game is closed. does anyone have any idea what this might be? Help, please! It's very frustrating.

    Intel Core 2Duo

    ATI Radeon HD3650 PCIE16

    4 GB OF DDR3 MEMORY

    Finally I thought of her. The problem was with a compatibility problem with a USB display controlled on a case of SilverStone Media Center. I found this through the process of elimination. After unplugging the screen before the problem disappeared.

  • begin and end in awr report

    Hi all

    Hope all are well. I need your help, I doubt reading the awr report.

    Summary of the report

    Cache sizes

    Start End
    Cache buffers:572 M572 MStd block size:8K
    Size of the shared pool:408 M408 MLog buffer:13 604 K

    My question is what is 'START' and 'END' in the figure above and why to cache buffer and shared pool sizes are the same for BEGIN and END.your help appreciated, thanks in advance.

    Best regards.

    size of the buffer at the start of the snapshot cache

    size of the buffer at the end of the snapshot cache

    Shared at the beginning of the snapshot pool

    Shared pool, at the end of the snapshot

    So that means: either you did not Oracle or Oracle to change these settings dynamically does not need to change.

    Always send four-digit version of your database and platform info. This forum is not keeping track of it.

    ---------------

    Sybrand Bakker

    Senior Oracle DBA

  • Breaking a year in coming weeks of beginning and end Dates (parameters) and first and last day of the month

    Hello people:

    I have currently a query that picks up all the weeks between a date range where my week starts on Thursday and ends on Wednesday. The following query works fine except that I need the week of beginning and end, from beginning and end Dates of months and the beginning and the Dates of end of the values of the settings, I'm passing. In this case, I chose January 1, 2013 to 31 December 2013.

    Any help or pointers would be great!

    Thank you!

    Problem: I am picking up days of December 2012 as the first week began on December 27, 2012. In addition, in December, I'm pretty much lost last week as well (26 December - 31 December).

    The request in hand:

    SELECT first_thursday + (7 * (LEVEL - 1))   AS week_start_date,
                     first_thursday + (7 * LEVEL) - 1    AS  week_end_date
    FROM
    (
      SELECT TRUNC(p_from_date + 4, 'IW') - 4   AS first_thursday, -- Week should start the pre ceeding THURSDAY based on the Start Date
                      TRUNC( p_to_date + 4,  'IW') - 5     AS last_wednesday
      FROM
      (
        SELECT to_date('01-JAN-2013') AS p_from_date,
                        NVL(to_date('31-DEC-2013'), SYSDATE) AS p_to_date
        FROM     dual
      ) parms
    ) end_points
    CONNECT BY LEVEL <= ( last_wednesday + 1 - first_thursday)/7;
    

    Currently, this is the result I get (I'm only including the months of January and December here).

    Week_Start_Date     Week_End_Date
    27-DEC-12                02-JAN-13
    03-JAN-13                 09-JAN-13
    10-JAN-13                 16-JAN-13
    17-JAN-13                 23-JAN-13
    24-JAN-13                 30-JAN-13
    31-JAN-13                 06-FEB-13
    

    December:

    28-NOV-13               04-DEC-13
    05-DEC-13              11-DEC-13
    12-DEC-13              18-DEC-13
    19-DEC-13              25-DEC-13
    

    What I would really like is based on start and end Dates, as well as the first and the last day of the month is similarly try nicely. I have provided and then gently break at the end of the month:

    January:

    01-JAN-13              02-JAN-13
    03-JAN-13              09-JAN-13
    10-JAN-13             16-JAN-13
    17-JAN-13             23-JAN-13
    24-JAN-13             30-JAN-13
    31-JAN-13             31-JAN-13
    

    February:

    01-FEB-13    06-FEB-13
    07-FEB-13    13-FEB-13
    14-FEB-13    20-FEB-13
    21-FEB-13    27-FEB-13
    28-FEB-13    28-FEB-13
    

    November:

    31-OCT-13    06-NOV-13
    07-NOV-13    13-NOV-13
    14-NOV-13    20-NOV-13
    21-NOV-13    27-NOV-13
    28-NOV-13    04-DEC-13
    

    December:

    01-DEC-13           04-DEC-13
    05-DEC-13           11-DEC-13
    12-DEC-13          18-DEC-13
    19-DEC-13          25-DEC-13
    26-DEC-13          31-DEC-13
    

    Hello

    Roxyrollers wrote:

    Hello people:

    I have currently a query that picks up all the weeks between a date range where my week starts on Thursday and ends on Wednesday. The following query works fine except that I need the week of beginning and end, from beginning and end Dates of months and the beginning and the Dates of end of the values of the settings, I'm passing. In this case, I chose January 1, 2013 to 31 December 2013.

    Any help or pointers would be great!

    Thank you!

    Problem: I am picking up days of December 2012 as the first week began on December 27, 2012. In addition, in December, I'm pretty much lost last week as well (26 December - 31 December).

    The request in hand:

    1. First_thursday SELECT + (7 * (LEVEL - 1)) AS week_start_date,
    2. first_thursday + (7 * LEVEL)-1 AS week_end_date
    3. Of
    4. (
    5. SELECT TRUNC (p_from_date + 4, 'IW') - 4 AS first_thursday,-week should start to perform the pre-mounted THURSDAY based on the Start Date
    6. TRUNC (p_to_date + 4, 'IW') - 5 AS last_wednesday
    7. Of
    8. (
    9. SELECT to_date('01-JAN-2013') AS p_from_date,
    10. NVL (to_date('31-Dec-2013'), SYSDATE) AS p_to_date
    11. OF the double
    12. ) parms
    13. ) end_points
    14. CONNECT BY LEVEL<= (="" last_wednesday="" +="" 1="" -="">

    Currently, this is the result I get (I'm only including the months of January and December here).

    1. Week_Start_Date Week_End_Date
    2. DECEMBER 27, 12 2 JANUARY 13
    3. JANUARY 3, 13 JANUARY 9, 13
    4. 10 JANUARY 13 JANUARY 16, 13
    5. 17 JANUARY 13 23 JANUARY 13
    6. 24 JANUARY 13 30 JANUARY 13
    7. 31 JANUARY 13 FEBRUARY 6, 13

    December:

    1. NOVEMBER 28, 13 4 DECEMBER 13
    2. 5 DECEMBER 13 DECEMBER 11, 13
    3. 12 DECEMBER 13 18 DECEMBER 13
    4. 19 DECEMBER 13 DECEMBER 25, 13

    What I would really like is based on start and end Dates, as well as the first and the last day of the month is similarly try nicely. I have provided and then gently break at the end of the month:

    January:

    1. JANUARY 1, 13 2 JANUARY 13
    2. JANUARY 3, 13 JANUARY 9, 13
    3. 10 JANUARY 13 JANUARY 16, 13
    4. 17 JANUARY 13 23 JANUARY 13
    5. 24 JANUARY 13 30 JANUARY 13
    6. 31 JANUARY 13 JANUARY 31, 13

    February:

    1. 1ST FEBRUARY 13 FEBRUARY 6, 13
    2. 7 FEBRUARY 13 FEBRUARY 13, 13
    3. 14 FEBRUARY 13 FEBRUARY 20, 13
    4. 21 FEBRUARY 13 FEBRUARY 27, 13
    5. 28 FEBRUARY 13 FEBRUARY 28, 13

    November:

    1. 31 OCTOBER 13 NOVEMBER 6, 13
    2. 7 NOVEMBER 13 NOVEMBER 13, 13
    3. 14 NOVEMBER 13 NOVEMBER 20, 13
    4. 21 NOVEMBER 13 NOVEMBER 27, 13
    5. NOVEMBER 28, 13 4 DECEMBER 13

    December:

    1. 1ST DECEMBER 13 DECEMBER 4, 13
    2. 5 DECEMBER 13 DECEMBER 11, 13
    3. 12 DECEMBER 13 18 DECEMBER 13
    4. 19 DECEMBER 13 DECEMBER 25, 13
    5. 26 DECEMBER 13 DECEMBER 31, 13

    Why the "weeks" in November, have all 7 days, while the "weeks" in the first or the last week in the other month usually have less?  (For example, February 28 is a 'week' alone.)

    The following works for the other months:

    WITH all_days AS

    (

    SELECT DATE "2013-01-01' + LEVEL - AS a_date 1

    OF the double

    CONNECT BY LEVEL<=>

    )

    SELECT DISTINCT

    More GRAND (TRUNC (a_date + 4, 'IW') - 4)

    , TRUNC (a_date, 'MONTH')

    ) AS week_begin

    , The LEAST (TRUNC (a_date + 4, 'IW') + 2

    TRUNC (LAST_DAY (a_date))

    ), Week_end

    Of all_days

    ORDER BY week_begin

    ;

    Output:

    WEEK_BEGIN WEEK_END

    ----------- -----------

    January 1, 2013 January 2, 2013

    January 3, 2013 January 9, 2013

    January 10, 2013 January 16, 2013

    January 17, 2013 January 23, 2013

    January 24, 2013 January 30, 2013

    January 31, 2013 January 31, 2013

    February 1, 2013 February 6, 2013

    February 7, 2013 February 13, 2013

    February 14, 2013 February 20, 2013

    February 21, 2013 February 27, 2013

    February 28, 2013 February 28, 2013

    ...

    November 1, 2013 November 6, 2013

    November 7, 2013 November 13, 2013

    November 14, 2013 November 20, 2013

    November 21, 2013 November 27, 2013

    November 28, 2013 November 30, 2013

    December 1, 2013 December 4, 2013

    December 5, 2013 December 11, 2013

    December 12, 2013 December 18, 2013

    December 19, 2013 December 25, 2013

    26 December 2013 31 December 2013

  • Beginning and end of the week according to YYYYWW

    Hi all

    I have a date like format

    201050
    201051
    201052
    201101

    I wanted to display their dates of beginning and end of the relevant year - week.
    SQL> with t as (
      2   select 201050 yw from dual union all
      3   select 201051 from dual union all
      4   select 201052 from dual union all
      5   select 201101 from dual union all
      6   select 201102 from dual
      7  )
      8  --
      9  --
     10  select yw, trunc (trunc (to_date (substr (yw, 1, 4), 'yyyy') + 7, 'iyyy') + 7 * (substr (yw, 5) - 1), 'iw') start_dt
     11    from t
     12  /
    
                 YW START_DT
    --------------- -----------
             201050 13/dec/2010
             201051 20/dec/2010
             201052 27/dec/2010
             201101 03/jan/2011
             201102 10/jan/2011
    
    5 rows selected.
    
    SQL>
    
  • Help open the levels dialog box and save the entered settings.

    Hey,.

    I'm trying to work out how to save the applied middle, whitepoint ect to a variable after the levels dialog box was called from javascript?

    I am writing a script that allows you to adjust the levels on a single image, and then I have to repeatedly apply these settings on a batch of images specified.

    Is this possible? I figured out how to open and apply the levels but not to save the entered settings.

    Any help would be appreciated!

    I use photoshop cs6 on a mac.

    Thank you

    Mark

    Sorry Paul, but I think that you're wrong. The 'adjustment' list should have descriptions for each channel that has been set by the user. These descriptors must have the key for the channel as a referencetype, b/w in a list entry points, exit points black and white as a list and as a double gamma. I think that if these aren't in the descriptor, it is because the user has not changed the default values.

    But what if all you want to do is reapply the same settings later that you don't really need to know what setting were. You simply store the descriptor that contains for later use.

    function newLevels() {
    var desc2 = new ActionDescriptor();
    var ref1 = new ActionReference();
    ref1.putClass( charIDToTypeID('AdjL') );
    desc2.putReference( charIDToTypeID('null'), ref1 );
    var desc3 = new ActionDescriptor();
    var desc4 = new ActionDescriptor();
    desc4.putEnumerated( stringIDToTypeID('presetKind'), stringIDToTypeID('presetKindType'), stringIDToTypeID('presetKindDefault') );
    desc3.putObject( charIDToTypeID('Type'), charIDToTypeID('Lvls'), desc4 );
    desc2.putObject( charIDToTypeID('Usng'), charIDToTypeID('AdjL'), desc3 );
    return executeAction( charIDToTypeID('Mk  '), desc2, DialogModes.ALL );
    };
    // store the descriptor holding the users values for later
    var newLevelsDesc = newLevels();
    // do something else like open another image
    // then when needed make a new adjustment layer using those settings
    executeAction( charIDToTypeID('Mk  '), newLevelsDesc, DialogModes.NO );
    
  • I can't and never been able to open a file that was previously saved on hard disk by selecting the print option to get in the print dialog box

    I can not and never been able to open a file that was previously saved on hard disk by selecting the print option to get in the print dialog box. Firefox displays gooblygook, even if the name of file is an html element, the Notepad of Windows crashes, MS Excel does not recognize the file type. MS Word also displays goobblys when the file has no file extension.

    If you use the file printing, then you will get a file that is supposed to be sent to a printer, and this file has any sort of code formatting for this printer.

    Open such a file in Firefox or a text editor can only work if you use one printer for text to print the file to, then make sure that such a printer is installed and selected.

  • HP Officejet 6700 Premium: Don't scan and the scan dialog box will not open

    Since I upgraded my computer to Windows 10, I'm unable to use my scan on my HP Officejet 6700 Premium function.  I can't even open the scan dialog box to look at the options etc.  I tried to find 'Scanner and printer' in painting, but it does not recognize.  Any suggestions?  I already deleted the printer and re-installed.  It was working fine before on Windows 8.

    Hello

    Thank you for using the HP forum.

    You can download and install the software COMPLETE features of HP printing for your operating system:

    http://support.HP.com/us-en/drivers/selfservice/HP-OfficeJet-6700-premium-e-all-in-one-printer-series-H711/4322971/model/4323605#Z7_3054ICK0K8UDA0AQC11TA930S6

    Once you have downloaded and installed the software, FULL of features, you will be able to print and scan.

    Hope that helps.

  • The cancellation of the 'file' dialog box and handle errors caused by the empty path that makes the DB connection

    Hi guys.

    I developed a VI that connects to the database reads the names of tables, columns of the selected table, etc. It works well as I want to.

    However, I have problem with identifying the UDL file with function of dialog 'file' use in a structure of the event that is triggered when the button 'Open' value is changed. It also works well, when I choose the UDL file, but the problem is when I cancel it and I get the error 43.

    I tried to deal with this problem with a "error handler" function to clear the error 43 but the next errors that are associated with the database conncetion appeared. The reason is, when file dialog is cancelled, an empty path passes by reference of connection and I can't start the while loop where are the key codes. I also used a box Structure connected to "Cancelled" with 'DB connection tool' in case of real and connection the reference connection for the while loop, but I get the same result.

    I want to apply for work as: start to push the button "Open" and select the file UDL, the loop run to establish the connections database, if not with the cancellation of the file dialog box, the application waits by pushing the button open and select the UDL file again.

    Thanks a lot for your help in advance.

    Hi lman,.

    start to push the button "Open" and select the file UDL, the loop run to establish the connections database, if not with the cancellation of the file dialog box, the application waits by pushing the button open and select the UDL file again.

    Some pseudocode, easy to implement:

    WHILE
    
      onevent(OPEN button)
        FileDialog
    
      IF file selected THEN
        open database
        do calculations
      ELSE
        do nothing
      ENDIF
    
    WEND
    

    What is your problem with the help of loops and structures of the case?

  • While to download Adobe Camera Raw 5.5 plug, the download dialog box shows completeted, and immediately the page internet explore Flash

    Original title: download problems

    I am running vista with internet explorer 7.

    While I try to download the plugin Adobe Camera Raw 5.5, the download dialog box shows completeted and immediately the internet explore page statrsts flashing. I can't do anything with the computer out to turn it off manually.

    I have Adobe flash Player version 10.3 installed and you have disabled the pop ups.

    Help.

    Nick.

    Hi Nick,

    1 download of Adobe successful or you trying to download again and again?

    2. other than this issue is IE works well?

    You can try to download any add ons mode and check.

    You can temporarily disable all add-ons and check what is happening.

    a. click the Start button, click principally made programs, accessories, click System Tools and then click Internet Explorer (No Add-ons).

    You can visit the following link to download the Adobe Camera Raw 5.5 update

    http://www.Adobe.com/support/downloads/detail.jsp?ftpID=4578

    You can also check out the following link and check:

    When you start Internet Explorer, it opens, flashes and then closes immediately

    http://support.Microsoft.com/kb/967896

    Hope this information is useful.

  • At the beginning and end of the audio Volume control

    How to set the volume at the beginning and the end of audio?  So volume up slightly at full volume in middle to lower the volume and at the end of the audio?

    The f

    Each question is important if you do not have an answer for her. So please never hesitate to ask if you need clarification on anything I wrote or need additional information.

    With regard to the location of the Audio Mixer in first elements 11 Windows 8 64-bit (as for Windows 7 64 bit)...

    Access is under the Tools Menu at the top of the workspace Expert or Tools tabs at the bottom. Please refer to the screenshot

    In addition to what has already been post, here's some additional information about your questions.

    If you have not already seen, please check the excellent document Adobe 'Premiere elements/Audio Mixer and Volume control.

    http://help.Adobe.com/en_US/premiereelements/using/WS6C96BC86-7342-44a4-8D3F-936C1D66DE0B. HTML

    I think you'll do OK with the Audio Mixer Panel. But, you can explore keyframing the volume level of the audio element 'elastic '. It is the orange line which runs horizontally through the middle of the audio clip.

    a. hold CTRL of the computer main keyboard and the left mouse click on a place where you want to place a keyframe volume. You can do it in as many places on the rubberband if necessary. Then, with the mouse cursor, move the White points (keyframes) up or down to increase or decrease the volume to a location along the clip.

    Here's a blog I wrote about the video and the Audio Track Rubberbands (with graphic how) that should help you to correctly enter this particular workflow.

    http://www.atr935.blogspot.com/2013/06/pe11-video-and-audio-track-rubberband.html

    Thank you for the opportunity to help with your workflow in Premiere Elements. Screenshots are all first elements 11 Windows.

    RTA

  • the value entry and exit points at start and end of the clip

    Hi all, I am new to first having already used Avid and FCP. One that allows you to set both and out points according to both the beginning and the end of the clip is a key that I can't locate. that is, when I want to put the whole clip in my sequence or lift a clip of my sequence help tip. I know there are other ways to do these things, but I want to stick to the way I'm used to.

    Thank you

    If I had to do... I would not put any points and just use Insert / Overlay or extract / shortcuts lift.

    They all need choosing the clip or the window anyway.

Maybe you are looking for