Request for between two dates.
HelloI have a date column and I want to choose the records between two dates, the output of this column is: 19/08/2003-02:11
My query is:
SELECT THE POINT DTM
WHERE DTM BETWEEN JULY 1, 2012 "-JULY 15, 2012"
Help, please.
Thank you
>
I have a date column and I want to choose the records between two dates, the output of this column is: 19/08/2003-02:11
My query is:
SELECT THE POINT DTM
WHERE DTM BETWEEN JULY 1, 2012 "-JULY 15, 2012"
Help, please.
>
Help with what? You do not have a question or indicate if you have a problem any.
Do you need to know how to use TO_DATE instead of literals in the WHERE clause?
SELECT DTM FROM ITEM
WHERE DTM BETWEEN TO_DATE('07/01/2012', 'MM/DD/YYYY') AND TO_DATE('07/15/2012', 'MM/DD/YYYY');
Tags: Database
Similar Questions
-
Dynamic calculation of the number of days between two dates in a table
Hello
I'm working on request where I dynamically calculate the number of days between two dates in a table.
The calculation must be dynamic, i.e., when I recover the Start_date and End_date and move to the field following (call_duration) in the same row, the difference must be calculated dynamically in this area and make sure the field read-only.
APEX version: 5.0
Hi BO123,
BO123 wrote:
Hello
I'm working on request where I dynamically calculate the number of days between two dates in a table.
The calculation must be dynamic, i.e., when I recover the Start_date and End_date and move to the field following (call_duration) in the same row, the difference must be calculated dynamically in this area and make sure the field read-only.
APEX version: 5.0
one of the way to do this by calling ajax on change of end_date.
See the sample code given below to fetch the resulting duration and making the field read only after calculation
Step 1: Change your page
under CSS-> Inline, put the code below
.row_item_disabled { cursor: default; opacity: 0.5; filter: alpha(opacity=50); pointer-events: none; }
Step 2: Create on demand Ajax process I say CALC_DURATION
Please check Procces Ajax, see line 6.7 How to assign a value to the variable sent by ajax call
Declare p_start_date date; p_end_date date; p_duration number; Begin p_start_date := to_date(apex_application.g_x01); p_end_date := to_date(apex_application.g_x02); --do your calculation and assign the output to the variable p_duration select p_end_date - p_start_date into p_duration from dual; -- return calculated duration sys.htp.p(p_duration); End;
Step 3: Create the javascript function
Change your page-> the function and the declaration of the Global Variable-> put the javascript function
You must extract the rowid in the first place, for which you want to set the time, see line 2
assuming f06, f07 and f08 is the id of the start date, and end date columns respectively, and duration
See no line no 8 how set the value returned by the process of ajax at the duration column
Replace your column to the respective column identifiers in the code below
function f_calulate_duration(pThis) { var row_id = pThis.id.substr(4); var start_date = $('#f06_'+row_id).val(); apex.server.process ( "CALC_DURATION", { x01: start_date,x02: $(pThis).val() }, { success: function( pData ) { // set duration to duration column $('#f08_'+row_id).val(pData); // disable duration column $("#f08_" + row_id).attr("readonly", true).addClass('row_item_disabled'); } }); }
Step 4: choose the end date call the javascript function
Go to report attributes-> edit your Date column end-> column-> Attrbiutes element attributes-> put the code below
onchange="javascript:f_calulate_duration(this);"
hope this helps you,
Kind regards
Jitendra
-
get all the date of end of months between two dates
Hi all, I'll try to find together the date of end of months between two dates.
I have the following data in a table
WITH AS's Data1
(
SELECT To_Date('4/30/2009','mm/dd/yyyy') dt, 'TEST' lname FROM dual UNION ALL
SELECT To_Date('5/01/2009','mm/dd/yyyy') dt, "TEST2" lname FROM dual UNION all
SELECT To_Date('5/02/2009','mm/dd/yyyy') dt, "TEST3" lname FROM dual UNION all
SELECT To_Date('5/03/2009','mm/dd/yyyy') dt, "TEST4" lname FROM dual UNION all
SELECT To_Date('5/04/2009','mm/dd/yyyy') dt, "TEST5" lname FROM dual UNION all
SELECT To_Date('5/05/2009','mm/dd/yyyy') dt, "TEST6" lname FROM dual UNION ALL
SELECT To_Date('5/31/2009','mm/dd/yyyy') dt, 'TEST7' lname FROM dual UNION all
SELECT To_Date('6/01/2009','mm/dd/yyyy') dt, 'TEST' lname FROM dual
)
I would like to write an application that gives you all the end date for months between two dates
for example, if you give the date 9/1/4 and 5/6/9, the output should be
IF I give you the dates 01/04/09 AND 01/06/09, THEN output should beDT LNAME ------------------- 4/30/2009 TEST
as you can see, I want all the end dates of months between two dates by giving the output.DT LNAME ------------------- 4/30/2009 TEST 5/31/2009 TEST7
If I give you 06/05/09 and 05/06/09, and then does so no output because there is no end of month between these two dates.
Similarly, if I give you 30/04/09 and 30/04/09 then output should be 30/04/09 because it is an end of month date
anyone can help to write a query. Thank you very muchJin
Not sure if you need subquery, analytical functions for this.
According to me, which should solve your purpose.WITH data1 AS ( SELECT To_Date('4/30/2009','mm/dd/yyyy') dt, 'TEST' lname FROM dual UNION ALL SELECT To_Date('5/01/2009','mm/dd/yyyy') dt, 'TEST2' lname FROM dual UNION all SELECT To_Date('5/02/2009','mm/dd/yyyy') dt, 'TEST3' lname FROM dual UNION all SELECT To_Date('5/03/2009','mm/dd/yyyy') dt, 'TEST4' lname FROM dual UNION all SELECT To_Date('5/04/2009','mm/dd/yyyy') dt, 'TEST5' lname FROM dual UNION all SELECT To_Date('5/05/2009','mm/dd/yyyy') dt, 'TEST6' lname FROM dual UNION ALL SELECT To_Date('5/31/2009','mm/dd/yyyy') dt, 'TEST7' lname FROM dual UNION all SELECT To_Date('6/01/2009','mm/dd/yyyy') dt, 'TEST' lname FROM dual ) select distinct last_day(dt) dt,lname from data1 where dt between &start_date and &end_date and last_day(dt) <= &end_date
also, i have another request. how would i do this without using the data i provided. lets say, i tell you, give me alll the months end between two dates using dual in the from clause of a query. how would you do this in a query or pl/sql? thanks again
Can be like that
with data1 as( select &start_date+level-1 dt from dual connect by level <= &end_date-&start_date+1) select distinct last_day(dt) from data1 where dt between &start_date and &end_date and last_day(dt) <= &end_date order by last_day(dt)
See you soon!
BobinPublished by: Buga added query for updated the need
-
MaxL Script to clear the data between two dates
Hi all
I need advice to clear the data between two dates, I have three dimensions in my sketch, 'eno', 'hiredate' and the 'actualamount '.
Now I need to erase the data between the date range, up to now, I have this script,
Fix ("HireDate", "Eno")
Difficulty (@relative ("00:00:00",0),@relative("eno",0)) 2015-07-15 "))
CLEARDATA "sal."
endfix
ENDFIX
These scripts only clears on a specific day, but I tried to write the script to clear between two dates, I surfed on a few sites, but no clear answers, finaanly came here, kindly help in this regard.
Thanks in advance.
Have you not tried the format of "startdate":"enddate" for example "August":"September."
See you soon
John
-
difference between two dates in the year/month/day in Obiee
Hi gurus,
I know this question have been asked and answered several times but I have a requirement that is a little different, then the previous ones.
I want to calculate the difference between two dates in OBIEE10g in year/month/day format similar to the below SQL output
SQL > select end_date, start_date,
trunc (months_between (end_date, start_date) / 12) years.
months of mod (trunc (months_between (end_date, start_date)), 12).
End_date - add_months (start_date, trunc (months_between (end_date, start_date))) days
t
Thanks in advance
SK
Search for this
"TIMESTAMPDIFF IN THE FORM OF MTHS # YEARS."
or else
To get the current mandate of employees since the date of hiring in the form of # years # mths or # year (s) # month (s)
Concat (concat (cast (TIMESTAMPDIFF (SQL_TSI_Month, "Employee attributes". (((' ' Hiring last Date employee ", CURRENT_DATE) / 12 as char),"Year (s)"), concat (cast (MOD (TIMESTAMPDIFF (SQL_TSI_Month,"Employee attributes". (((((' ' Hiring last Date employee ", CURRENT_DATE), 12) as char), 'Month (s)'))
Concat (concat (CAST (TIMESTAMPDIFF (SQL_TSI_YEAR, "Employee attributes". (((' ' Hiring last Date employee ", CURRENT_DATE) as CHAR),"Year (s)"), concat (cast (MOD (TIMESTAMPDIFF (SQL_TSI_Month,"Employee attributes". (((((' ' Hiring last Date employee ", CURRENT_DATE), 12) as char), 'Mth (s)'))
-
Number of Saturdays between two dates
Hello
How can I get number of Saturdays between two dates, including the two dates?
for example number of Saturdays between 09/05/2014 and 10/05/2014 is five
Help, please
I use oracle 10g
SQL> with t 2 as 3 ( 4 select to_date('05/09/2014 ', 'dd/mm/yyyy') from_dt 5 , to_date('05/10/2014 ', 'dd/mm/yyyy') to_dt 6 from dual 7 ) 8 select to_char(from_dt + (level-1), 'fmDay') day_ 9 , count(*) cnt 10 from t 11 connect 12 by level <= to_dt - from_dt + 1 13 group 14 by to_char(from_dt + (level-1), 'fmDay'); DAY_ CNT --------- ---------- Saturday 5 Thursday 4 Tuesday 4 Friday 5 Wednesday 4 Monday 4 Sunday 5 7 rows selected. SQL>
-
Hello
I have two dates. start date and end date.
I want to extract months between two dates
months should be as
JAN
FEB
MAR
for example.
Start - 1-jan-2014
date of end - 31 - dec - 2014
How can I do this?
Thanks and greetings
CORINE
You should always use the function MONTHS_BETWEEN...
for example
SQL > ed
A written file afiedt.buf1 with t as (select date '' 2014-01-01 as start_date date ' 2014-12-31' as double end_date)
2 --
3 end of test data
4 --
5. Select to_char (add_months (start_date, rownum-1), 'My') by month
6 t
7 * connect by rownum<=>=>
SQL > /.LUN
---
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Ms
Oct
Nov
Dec12 selected lines.
And if you want that they display, separated by commas...
SQL > ed
A written file afiedt.buf1 with t as (select date '' 2014-01-01 as start_date date ' 2014-12-31' as double end_date)
2 --
3 end of test data
4 --
5 Select listagg (to_char (add_months (start_date, rownum-1), 'My'), ',') group by month (order by rownum)
6 t
7 * connect by rownum<=>=>
SQL > /.MONTH
-----------------------------------------------------------------------------------------------------------------
Jan, Feb, Mar, Apr, may, June, July, August, Sept, Oct, Nov, Dec -
Number of occurrences of a day between two dates
Hello
I have a requirement in my code to count the number of times per day occurs between two dates. So, for example if
start date = January 1, 2014
end date = March 31, 2014
The number of times that happens day 1 is three times. That's why I want the result to be 3. My three input parameters are the number of the day, start and end dates. I know that this can be done by parsing through the days and incrementing a counter of sorts, but can it be done without any loop etc?
Looking for options of
Thank you
Birdy
SELECT COUNT (TO_CHAR (DAYS, 'DD')) IN)
SELECT DAYS START_DATE + LEVEL 1
FROM T1
CONNECT BY LEVEL<=>=>
WHERE TO_CHAR (DAYS, 'DD') ='&01';
Post edited by: Parth272025
-
How to find days between two dates in days
Hi, I want to get the days between two dates, expressed in days, how can I do this? For example, I date i.e. 1 October 10, 2013 (Thursday) and 2 as October 13, 2013 (Sunday). How can I get a production of:
Thursday, Friday, Saturday and Sunday, which are the days between Oct. 10-13, 2013. I hope you understand my point. Thank you
You can try something like this
CURSOR LOAD_PROF is
SELECT load_prof1, v_time_profile_day
OF load_profile_test
WHERE profile_day IN (select TO_CHAR(:day1+level-1,'Day')
of the double
connect by level<>
);
Kind regards
S Pax
-
Number of weeks between two dates that are in the same or different year
Hello
How to calculate the number of weeks between two dates?
for example. "" "17-mar-2013' and June 27, 2013" or June 15, 2013 "and" 25-mar-2014
Thanks in advance.
lukx
Hello
Looks like your date range is incorrect.
Please try the below.
SQL >-front right
SQL > select D2 - D1 "days."
2 round ((D2-D1)/7.0) "weeks."
3 round (Months_between (d1, d2), 0) 'months '.
(select 4
5 TO_DATE ('20121201', 'YYYYMMDD') D1, D2 TO_DATE ('20130116', 'YYYYMMDD')
6 from two
(7) date_range;
Elapsed days weeks months
------------ --------- ---------
46 7 1
-
Calculate the (age) years between two dates
Nice day!
I have not been able to find an answer, that I was able to use in the archives or online and would be very grateful for the help. I'm working with Adobe Acrobat Pro XI (not LiveCycle) and I have very little experience with programming (for the most part, copy / paste).
I need to create a text box that calculates the number of years between two dates entered, i.e. the age when the date of birth and death are given. Also, would be nice if she was a Virgin until the two were provided. Anyone would be able to give me the code I need to put in the custom calculation script?
Once again, any help would be much appreciated! Thank you and have a wonderful day!
For the fields for Date of birth DOB and DOD for the Date of death and age in complete years both by using a'd-mmm-yyyy' date format you can use a custom calculation to the JavaScript for the field of age as:
function GetField (cName) {}
get the field with error trapping object;
oField var = this.getField (cName);
test error;
if(oField == null) app.alert ("error during the" + cName, 1, 0);
Returns the field object;
return oField;
} / / end GetField function;function {Scand (cFormat, cString)
using date string format convert object date;
convert string to date using format;
Kai var = util.scand (cFormat, cString);
the value null is an error of conversion;
if(oDate == null) app.alert ("Conversion error" cString "by using the format" + cFormat, 1, 0);
date of return;
Return to oDate;
} / / end Scand function;clear the value of the field;
Event.Value ="";
get data dob and dod;
var oDOB = GetField ("DOB");
Var o = GetField ("DOD");treat only if DOB and DOD have value and are not null;
If (oDOB! = null & o! = null & oDOB.value! = "" & oDOD.value!) = "") {}convert the DOB and DOD to date objects.
oDOB var = util.scand ("d-mmm-yyyy", oDOB.value);
O var = util.scand ("d-mmm-yyyy", oDOD.value);get the difference over the years;
var Age = oDOD.getFullYear () - oDOB.getFullYear ();adjust for month of previous DOD DOB;
If (oDOD.GetMonth)< odob.getmonth())="">adjust the DOD before DOB date in the month of birth;
If (oDOD.GetMonth () == oDOB.getMonth () & oDOD.getDate ())< odob.getdate())="">
Set the value of the field;Event.Value = Age;
} -
JavaScript anomaly on the number of days between two dates
Use ApEx 4.0, I found an anomaly in a javascript code that calculates the number of days between two dates, the current_date and the past_date. If the past and present is the or before March 10, 2013, and the current_date lies between 10 March 2013 and November 3, 2013, the number of days will be from 1 day to less than the actual number. Between November 3, 2013 and on 4 November 2013, the increments of number by 2, then the count will be accurate from this date forward.
Here are some examples:
March 10, 2013 = 69 days of December 31, 2012
March 11, 2013 = 69 days of December 31, 2012
March 12, 2013 = 70 days of December 31, 2012
November 3, 2013 = 306 days in December 31, 2012
November 4, 2013 = 308 days in December 31, 2012
11 March should be 70 and 12 March should be 71. November 3 is 307 and 4 November corrects the number of fake, which began March 11.
Change the past_date to March 10, 2013 produces the following:
March 10, 2013 = 0 days of March 10, 2013
March 11, 2013 = 0 days of March 10, 2013
March 12, 2013 = 1 days of March 10, 2013
But change the past_date to 11 March 2013, product of the correct numbers:
March 11, 2013 = 0 days of March 11, 2013
March 12, 2013 = 1 days of March 11, 2013
March 13, 2013 = 2 days of March 11, 2013
I would certainly all help to determine the cause of this anomaly. Here's the javascript code:
var w1 = ($v ("P48_PAST_DATE"));
W1 = (w1.toString ());
vmon var = (w1.substr (3.3));
vyr var = (w1.substr (7));
var r = (vyr.length);
If (r == 2)
vyr. = (parseFloat (vyr) + 2000);
vday var = (w1.substr (0.2));
var y = (vmon.concat ("", vday, ",", vyr));
y = Date.parse (y);
var w2 = ($v ("P48_CURRENT_DATE"));
var vmon2 = (w2.substr (3.3));
var vyr2 = (w2.substr (7));
var vday2 = (w2.substr (0.2));
var x = (vmon2.concat ("", vday2, ",", vyr2));
x = Date.parse (x);
var numdays = (x - y);
numdays = (Math.floor(numdays / 86400000));
$s ("P48_NUMBEROFDAYS", numdays);Did you google for something like "javascript number of days between two dates. I think you will find the explanation to this observation:
This method does not work correctly if there is an advanced economies jump between the two dates.
There are examples available to calculate the difference between two dates.
-
Need assistance with obtaining data of users modified between two dates in IOM
Hi all
I have a 11g IOM environment where I need to write a scheduled task that needs to go out the data of users that have been modified between two dates. After the search in the forums, I've had an idea and wrote the following code for the same thing. But it doesn't seem to work. Can someone help me here please?
> //initialize upper and lower attributes to two values of oracle.sql.DATE
> Criteria1 SearchCriteria is nothing, Criteria2 = null, criteria;
> criteria1 = new SearchCriteria ("update the", lower, SearchCriteria.Operator.GREATER_EQUAL);
> Criteria2 = new SearchCriteria ("update the", plus top, SearchCriteria.Operator.LESS_EQUAL);
> criteria = new SearchCriteria (Criteria1, criteria2, SearchCriteria.Operator.AND);
> //initialize the necessary parameters, obtain a User Manager object and follow these steps
> users = umgr.search (criteria, attrNames, settings);
But this doesn't seem to work. Can someone shed light on this you? The attribute "updated on" is not available for this task? If I use a unique 'User login' attribute search criteria, this thing works and gets the user data but this does not work when I use the attribute "updated on" so made me think maybe that this attribute is not available for use via the API or something. Or maybe it's with the help of the oracle.sql.DATE is a problem here. Not sure if. So kindly help me with this.
Thanks in advance,
$idI suggest that create you a real attribute in your scheduled task called something like 'Last Run Timestamp'. The reason why I say this is that you can modify your search on this basis rather than manipulate the date of beginning and end of the last run. To retrieve the value, like any other attribute use this:
>
String lastRunTimestamp = hashMap.get ("last Run Timestamp") m:System.NET.SocketAddress.ToString ();
>
Format your time you are entered like this: "YYYY-MM-DD hh: mm: zzz ' in order to retrieve and format the value like this:
>
SimpleDateFormat time = new SimpleDateFormat ("yyyy-MM-DD hh: mm: zzz");
recover start date, so it can be updated on the ground on the scheduled task
Start date = new Date();Convert timestamp last executed so far
Date stamp = new Date();
timestamp = time.parse (lastRunTimestamp);
>
You have now your last time stamp execution that you can set your time dérirez based on.And finally, to return the last value of stamp on both scheduled run time, you started this task
>
SchedulerService task = Platform.getService (SchedulerService.class);
Task = task.lookupScheduledTask taskEntry (getName ());
JobParameter = taskEntry.getParameters () .get ("last Run Timestamp") jobparam;
JobDetails job = task.getJobDetail (getName ());
HashMapattributes = job.getAttributes ();
String timestamp = (time.format (start));
jobparam.setValue (timestamp);
Attributes.put ("last Run Timestamp", jobparam);
job.setAttributes (attributes);
task.updateJob (job);
>I hope it's useful. This is how I do all my scheduled tasks that need a timestamp.
-Kevin
-
Calculate business hours between two dates in a cursor
Hello, its me again (?).
Yesterday, I got a solution to a problem here where I need to calculate the hours between two dates, excluding Sat/Sun and from 09:00 to 18:00. I'm now putting this login in a PL/SQL block, so I can calculate it for each record in a slider, all by looping.
The logic above, I'm up here:with t (start_date ,end_date ) as (select to_date('22-oct-2012 09:00:00','dd-mon-yyyy hh24:mi:ss') start_dt, to_date('23-oct-2012 09:00:00','dd-mon-yyyy hh24:mi:ss') end_dt from dual ) , hrs (dt) as (select start_date from t union all select dt +1/24/60 from hrs where hrs.dt < (select end_date-1/24/60 from t) ) select count(*)/60 from hrs where to_char(dt,'dy') not in ('sat','sun') and to_number(to_char(dt,'hh24')) not between 18 and 23 and to_number(to_char(dt,'hh24')) not between 0 and 8 /
I really don't like if the performance is horrible because it will run once a month and should spend only 40-100 records.FOR c_record IN c_1 LOOP //For each record, check if the two dates meet the criteria and then raise the counters accordingly select to_date(c_record.REPORTADA,'dd-mon-yyyy hh24:mi:ss') INTO vFch1 FROM DUAL; SELECT to_date(c_record.INICIOREAL,'dd-mon-yyyy hh24:mi:ss') INTO vFch2 FROM DUAL; IF ((vHoras > 2) AND c_record.PRIORIDAD=3) THEN vContOk :=vContOk + 0; vContBad := vContBad+1; vContOt := vContOt+1; ELSE vContOk :=vContOk +1; vContBad := vContBad+0; vContOt := vContOt+1; END IF; IF ((vHoras > 4) AND c_record.PRIORIDAD=2) THEN vContOk :=vContOk + 0; vContBad := vContBad+1; vContOt := vContOt+1; ELSE vContOk :=vContOk +1; vContBad := vContBad+0; vContOt := vContOt+1; END IF; IF ((vHoras > 16) AND c_record.PRIORIDAD=1) THEN vContOk :=vContOk + 0; vContBad := vContBad+1; vContOt := vContOt+1; ELSE vContOk :=vContOk +1; vContBad := vContBad+0; vContOt := vContOt+1; END IF; END LOOP;
However, I can't find a way to use this connection even in this case
Could you help me?
Thank you!
Greetings,
NACEURN wrote:
I need to calculate the number of minutes between two dates, only count the hours from 9 to 18hs.CREATE OR REPLACE FUNCTION get_bus_minutes_between( p_start_date DATE, p_end_date DATE ) RETURN NUMBER IS v_return NUMBER; BEGIN with t as ( select case level when 1 then greatest(p_start_date,trunc(p_start_date) + 9 / 24) else trunc(p_start_date) + level - 15 / 24 end start_dt, case connect_by_isleaf when 1 then least(p_end_date,trunc(p_end_date) + 18 / 24) else trunc(p_start_date) + level - 8 / 24 end end_dt from dual connect by level <= trunc(p_end_date) - trunc(p_start_date) + 1 ) select sum(greatest(end_dt - start_dt,0)) * 24 * 60 work_minutes into v_return from t where trunc(start_dt) - trunc(start_dt,'iw') < 5; -- exclude weekends RETURN v_return; END; /
For example:
SQL> select get_bus_minutes_between( 2 to_date('20-oct-2012 13:00:00','dd-mon-yyyy hh24:mi:ss'), 3 to_date('22-oct-2012 13:21:00','dd-mon-yyyy hh24:mi:ss') 4 ) work_minutes 5 from dual 6 / WORK_MINUTES ------------ 261 SQL>
SY.
-
Calculate the hours between two dates
Hello
I have a requirement to count the hours with 2 given timestamps, something like:
However, I wish it would be that simple. I just need to count the hours between two timestamps for the hours of work for example, 08:00 - 17:00, MONDAY to Friday (excluding weekends).SQL> select ((to_date('22-oct-2012 13:00:00','dd-mon-yyyy hh24:mi:ss') - to_date('20-oct-2012 13:00:00','dd-mon-yyyy hh24:mi:ss'))*24) B from dual ; B ---------- 48
So lets say I have to count the hours between two dates above the result should be 18 hours not 48 (4 hours on 20/oct, 9 hours on 21/oct to 5 hours 22/oct).
How can I achieve this? Any idea will be useful.
Thank youMy query generates a list of all the hours between the start and end time, filters on the hours that are outside of the hours of work and then account for the remaining lines. Change that to partial hours must just be a case of replace the two occurrences of 1/24 with 24/01/60, then - as say you - Division COUNT (*) by 60.
There may be performance issues using techniques of generation of line like this, if you put this in a query involving the joining of several lines of other tables (for example where the dates of beginning and end are derived from several employees?) or in several days. If you don't find it then count the number of whole days (taking weekends into account) between dates and work on the partial days after that it could be better. This would probably involve a lot of statements of case (which I don't have time to test it now).
Ben
Maybe you are looking for
-
Low beginning on Satellite M40-145 after changing the 160 GB HARD drive
Hello I own a Satellite M40-145 since 2005. After more than two years without any problem, two weeks ago the 80 GB hard drive to the original address has been damaged. So I had to replace it with a new, 160 GB (this replacement was made in a store be
-
messages counter shows more unread messages
him electronic meter is inaccurate because its display of messages not read more than real . How can I solve this problem?
-
HP Photosmart C4680 scanning problems with Snow Leopard
I have a HP Photosmart C4680 All in one printer/scanner Since upgrading my imac (early 2009 model) to Snow Leopard I have had problems printing and scanning My scanner has never worked since the upgrade printing has been uneven at best, but seems to
-
I can't remove an icon to a non-existent program in Control Panel.
I have Windows Vista Home Edition and completely removed all vestiges of any Apple software on my computer, but I still have a generic now left "MobileMe" Apple icon in my control panel! When I click on 'Open', I get a pop up window that says "Applic
-
NETGEAR Ondaaah 1000 M Wireless-N5 install help!
Work at home and my company computer died. They sent me a new one (Windows 7 Dell intell) and I had to take my Netgear adapter and put it on my new computer. It does not appear on my computer where I can see, but I'm not too tech savvy and Netgear s