The alignment of the text to the left so that it starts exactly the same point

Hello

I'm working on a document in Illustrator where exist dispatches and then numbered chips below. Everything is aligned to the left, but when you zoom in at most closely, you can see the title and the number not all aligned left exactly in the same place. The numbered chips all left the title start as well as the numbers don't line up exactly between them, because of some characters who have parts of them that start earlier. For example, a 4 starts before a 1, because the left side of the 4 goes further to the left.


Y at - it a shortcut for setting this without me having to go kern just so that it aligns all really left?

Thank you!

Try optical margin alignment in the Type menu.

Tags: Illustrator

Similar Questions

  • Management of several layers at the same point

    Hello

    I use the API in my application and Javacript Mapviewer, more than one layer can be established at the same point. I use MVThemeBasedFOI. If you click on this point, I want to give the possibly to choose which layer you want. Now when I have several layers, only the last can be clicked. Is there a way to solve it?

    MVThemeBasedFOI.setBringToTopOnMouseOver (boolean).   I found this method, but how do I access all layers when I click on a point?

    Thanks for help.

    ESC.

    I tried really hard things to fool this behavior. At the end of the search for new features that were not in the documentation, I found this: MVMapView.enableMultiThemeClickable (boolean). They should update the documentation because there are a lot of functions implemented that do not exist.

    Just enable it and it works perfectly!

    mapview.enableMultiThemeClickable (true);

    ESC

  • How to use the same point of view as read only in the ADF and editable

    Hello

    How to use the same point of view as read only in the ADF and editable? How can we succeed in TF?

    -James

    Hello

    Steven Davelaar wrote a presentation on this 'building highly reusable Taskflows.

    From slide 14, that's where your use case comes into play

    Frank

  • First Time Machine to NAS backup freezes at the same point, Console polluted by the same mistakes.

    I just configured my LaCie 5big Network2 act as a time Machine, but it is not back up correctly. When I run it always freezes at 14.70GB/237.71GB, even after deleting the backup and starting up again. I don't know if it of related or not, but the Console is littered with the same error messages (even if Time Machine is not running):

    If I stop the backup and restart it, it will get stuck after 7KB. If I delete the backup and starting a new one, it will get stuck at 14,70 Go again. This could be the cause? The NAS is configured correctly and firmware is up to date, disks are operational and functioning perfectly.

    My system is a 2015 retina MBP 15 "16GB / 500GB.

    Time Machine is a LaCie 5big Network2.

    LaCie can support this, but isn't Apple. the NAS can have its own propreitary features or a network can introduce the software is not designed for questions.

    If you want to use a NAS for backup, you can consider Carbon Copy Cloner as alternative

    For more information on the use of a 3rd party with network drive time machine see these article

    http://pondini.org/TM/2.html

    https://www.Google.com/?client=Safari#q=time+machine+over+network+drive

  • How do I change the range on a chart, but save the same points

    Hello

    I have a chart with 501 points on the axis X and autoscale on there, and then when I generate the graph, I see the x-axis from 0 to 500.

    But now I need to change the scale for the x-axis of 50 to 100... but all points must be the same as 0 to 500.

    I think what I need is just remove 0 and 500 channels and replace them with 50 to 100 without change anythink on the chart itself.

    Is this possible on LabVIEW?

    Note that I'm not asking for a zoom on the chart... There is no zoom, only the x-axis numbers must change after I generated

    the graph

    Thank you!

    Hi JPLO,

    You can change the presentation of the scale by setting an offset of 50 and a multiplier to scale from 0, 1, or in the box properties dialog or using the property or the nodes!

  • Can I designate a column as an output to another column in the same point of view?

    Hello!

    I have a custom view which I use in the daily Business Intelligence KPI, which is something like this:

    Select (select sum (col1) from table1) out1.

    ((select sum (col1) from table1) out2)

    of the double

    I need to reproduce the same columns that DBI will not refer me a column twice. It certainly is him asking to run the same query twice.

    Is there a way in which out2 will 'just talking' to out1?

    Thank you.

    For example,.

    SQL >

    SQL > set autot on exp

    SQL > create view v1 as

    2 with col (select sum (sal) s of emp)

    3 select s out1, out2 s of the neck;

    Created view.

    SQL > select * from v1;

    OUT1 OUT2

    ---------- ----------

    29025 29025

    Execution plan

    ----------------------------------------------------------

    Hash value of plan: 1190005124

    ----------------------------------------------------------------------------

    | ID | Operation | Name | Lines | Bytes | Cost (% CPU). Time |

    ----------------------------------------------------------------------------

    |  0 | SELECT STATEMENT |      |    1.    13.    3 (0) | 00:00:01 |

    |  1.  VIEW |      |    1.    13.    3 (0) | 00:00:01 |

    |  2.  GLOBAL TRI |      |    1.    4.            |          |

    |  3.    TABLE ACCESS FULL | EMP |    14.    56.    3 (0) | 00:00:01 |

    ----------------------------------------------------------------------------

    SQL >

  • How to display the data in the same point of view when zooming happens to OBIEE?

    I want the data to be displayed in the same view, but it displays in the new view when I drill down. How can I achieve this?

    Thanks in advance.

    Dashboard edit-> Section (the section where your report)-> properties-> drill in place...

    Thank you

    AJ

  • Illustration of starting in a new Indesign doc exactly the same point as the previous

    Hello. I am trying to create work for stickers cover the front and next to a freezer.  I created the façade which consists of a block of color along the top and bottom (with the logo at the top of the page Panel), then an illustration in the middle. Now, I want the blocks of color and illustration in order to operate in full transparency on part and on the other to cover the 2 side panels (which are the same height but of different width of the Centre).  Do I have to create 3 separate documents and how can I make sure that I follow the illustration exactly in the place where it ends on each side of the central panel?  Hope this makes sense to someone.  I have not been using very long InDesign and I can't get out.  I would really appreciate if someone can help me. Thank you.

    I could do this as a discrepancy of three pages. If you disable dragging in the context menu of Pages from you can hang all three pages in a single group.

  • CHKDSK is at the same point for at least 5 hours

    I have a 4 years old Dell Studio 1558. He worked slow/no correctly. Action Center recommended running a CHKDSK. I understand from reading other messages that it takes some time. However, I started this 7 hours ago and it has not progressed in the past 5 years. I think it would be easier to be patient, if I saw progress. He is currently at step 4 of 5 with 13 percent. It seems to be stuck at 421778 of 528368 processed files. Should I do something differently?  I understand that it is risky to have an abortion.

    Hello

    If Chkdsk is blocked, he'll keep hanging. The best you can do is Cancel and try again. If it crashes again, your hard drive is faulty, pure and simple.

    If you run it with the scan only parameters, cancel it will not hurt either. However, if you ran it with scan + attempt to repair bad sectors, no promises.

    Kind regards

    Patrick

  • Always restore to the same point

    Hello

    I have a database that I booted and I is that I can always return to the initial state.

    I was going to try to use a transaction and a save point to return to this State.

    What is a reasonable way to do it? Is there a better way? Keep in mind that this transaction may if run for a long time before it gets restored about to record

    Thank you
    Alex

    activate the FLASHBACK RECOVERY

  • How can I keep the start screen saver in the same place every time?

    When you use the screensaver on Windows Vista,

    It always starts at the same point, with the same images - no other place.

    If the screen saver works long enough, you later see photos at the end.

    but it's several hours!

    It is set to randomly mix - but I think that is random within each file, and I have several files in 'photos '...

    Because it begins with the same file of photos, I never see the images in files at the end.

    Help, please!

    Thank you

    Hello Terrahterrah,

    I was looking for this thread and saw that you wanted the screensaver start on another folder or pick up where he left.

    Unfortunately, we cannot control this in Windows without constant human intervention.

    I would recommend looking for software third benefit from this feature.

    Best regards

    Matthew_Ha

  • Validation on the page point is lost when creating dynamic action button


    Nice day

    I have some page elements like empno, job etc in my application to learn the goal where I validations

    to check the length of the point/numeric field and check for null

    I have 4 buttons [create, delete, cancel, apply changes] do dml basic operation

    Initially, all validations were shot when there was not any trigger attached to the buttons

    Once a dynamic action was created for a button by button create account to make these features as the insertion in arrays that are passed as a packaged procedure

    It works in all cases (for example) even if an entry is garbage does is allow inserts into the table and all the controls as EMPNO, JOBNO validations are ignored

    How can we ensure that these validations must be taken into account first and fired before and only if it is a valid entry before you create key

    otherwise it should always display error message when you enter invalid

    Tried to use the point of application by the shared components, then set value of Validation for function returns the error text a different value for the same point of the application

    [Like global variable]

    Don't know if the method described above is correct but stuck in this

    Not too much competent in JavaScript and didn't want to try if there is any possibility

    Kindly help on this

    Thank you

    Why not use page instead of dynamic action processes, they fire after validations

    Gus

  • How to reset the button incase they click New to create the same effect?

    OK guys,

    So im at a stop of triggers on the timeline, EX: sym.stop (1000);

    Then I'm animating a click on an element div/EX function:

    SYM.$("Rectangle2Copy23"). Animate({left:'3px',height:'77'});)

    How to reset the button incase they click New to create the same effect?

    Instead the object does nothing because it is already in position.

    I would go back to its original position and recreate the same effect.

    Problem is that the timeline stops... even if I go to another point in the timeline panel

    the last position assigned by the rest effect, I want to reset it even on the same point on the timeline...

    Thank you

    First of all, you need to upgrade your board animate to 2014.1.1 to open the membership re-shared, and

    then check this out:

    Dropbox - Archive_upgraded.rar

    Note: I added jquery explicitly for use. animate(), like the last Animate edge has no dependency on jQuery.

    HTH,

    Vivekuma

  • Equium L20: PA3412U - 1 M 51 & PA3412S - 2M 51 - is the same?

    Hello

    I was advised to get the number of part PA3412U - 1 M 51
    but when I search it it comes up with the part number: PA3412S - 2M 51

    (Extended 512 MB of memory (RAM) for Equium L20)

    They are from the same point?
    Thank you very much

    I can only confirm this information.
    The modules support the same specifications. It s only different number. All that s

  • Maximum limit for the number of periods loops that can be run at the same time?

    I am developing a simulator that requires many pieces of code to execute in parallel.  As a result, we were in loops just for this purpose.  I didn't count but there are close to 100 call loops that eventually run at a given time.

    A week ago, I've reached a point where the Simulator was working fine but when I added a more timed loop, it would break LabVIEW.  When I say LabVIEW crashed, I want to say there is no warnings that popped up, and LabVIEW just stopped completely.  Worse still, LabVIEW didn't offer even to recover the work when I start it back up again.  However, removing an additional timed loop allows everyone to work normally again.

    I'm under LabVIEW 2009 Version 9.0f3 (32 bit).  I have observed this behavior even on two different systems, one that is 3.2 GHz Xeon Quad-core with 2.0 GB of RAM, running Windows XP SP3 (32 bit) and the other is a 3.0 GHz AMD Athlon 64 Dual Core with 4.0 GB of RAM, running Windows 7 Professional (64 bit).

    Because the two systems are quite different, and LabVIEW appears to hang at the same point, I wonder if someone has already noticed such behavior.  I searched online and can't seem to find any reference to such a limit on call loops.

    One last thing.  I made an attempt to replace all the loops timed with while loops, but this seems to lead to some kind of hunger because the Simulator becomes suddenly jerky, without seeming to consume all resources more than when the call loops were in place.  So, which doesn't seem to be an option.

    I think that you are limited to 128 Timed loops in a system. Could not find anything by specifying that online, I am sure that I heard him. Also, the Sources Software-Triggered clock Timing loops can only be counted between 0-127.

    However, it certainly sounds like a bug that LabVIEW would crash during the approach of this limit rather than up a significant error.

    You can do some things to help avoid the unstable behaviour of the normal use of many parallels while loops. Place one or more loops in subVIs and then distribute these subVIs enforcement systems . This will give you your application with multiple threads of execution, which will reduce the ground being. If you don't do this, your curls probably all run System Standard of performance, which, by default, cannot have 8 wires at his disposal to share between all the loops.

Maybe you are looking for