Turers and phony Life Cycle Manager

Hi guys. I am just in the middle of download the virtual appliance for LCM and then its coming down I thought I would post just to see if I could check a number of things.

I saw some demos showing some of the cool features in the LMC and how it contributes to they control the deployment of virtual machines in an environment and has nice features rear load, although is it for existing virtual machines can I want to audit an existing with narrations of hundreds, yes hundreds of VMS environment?

Any information would be appreciated.

Thank you.

Yes, you can import existing virtual machines.  Look in the Administration section.  You can import virtual machines as well as all the virtual machines in a folder or a pool of resources.  You can designate an owner, associate values of criteria, set a retirement date and capture the historical cost of installation and ongoing monthly maintenance costs.

Enjoy.

Tags: VMware

Similar Questions

  • Revisting the UiEngine and screen life cycle, just to be sure I understand why I'm short-term memory

    For arguments sake, let's say I have a UiApplication from where I have a class named MyScreen that extends the screen. MyScreen, I background of work and every time I push a new screen the setTitle is called with a different value.

    With this configuration, I push the following screens on the display stack using a menu that looks like:

    • Press 3
    • Press 2
    • Press 1

    And I create my screens as follows, depending on which menu item has its run method invoked.

    For screen 1 and so on...

    MyScreen newScreen = new MyScreen();
    newScreen.setTitle("Screen 1");
    
    MyScreen newScreen = new MyScreen();
    newScreen.setTitle("Screen 2");
    
    MyScreen newScreen = new MyScreen();
    newScreen.setTitle("Screen 3");
    

    But what happens if I select the item of menu 3 push again, then push 2 once again, my display stack looks like:

    • Screen 2
    • Screen 3
    • Screen 3
    • Screen 2
    • Screen 1

    That's why I have five instances of my object type newScreen MyScreen, correct?

    Each of these five instances of my newScreen object must go through the life cycle standard screen?

    The only method of onUiEngineAttached race twice whenever my newScreen object is pushed and pulled. attached to the true value when the battery display and attached is false when it is taken from the stack display?

    As a result, the screen stack above, onUiEngineAttached is called a total of ten times?

    protected void onUiEngineAttached(boolean attached)
    

    Todd,

    Your description fits what I understand to occur.  RexDoug is concerned that you do not create a new instance of your screen, but I think that you are, you have 5 instances of your screen, some with identical titles.

  • Issue life cycle management tutorial

    I'm a newb with planning and Essbase. Asked me to help a project. I read the tutorial of LCM since I wanted to migrate our PRD to DEV. This seems to be a fairly common problem. We have no calculation of the Manager or EMP architect installed since we're on Solaris. We have done everything with classic. The tutorial reference EPM as necessary to migrate the application planning and dimensions and Bishop Calc for Bishop of computing artifacts. We have a windows server running Planning Server reports. Should I install EMP and Calc Manager on that server, because it needs Windows or y at - it another way to migrate to our DEV environment. If I should install EMP and Calc Mgr I just place the files with other zippers download V*.zip and run the installer? Thanks for any help you can provide.

    You need not have EPMA and/or Calc for LCM Manager.

    Just follow the steps in this link http://www.oracle.com/technetwork/middleware/performance-management/tutorials/pln-lcm-obe-095602.html

    See you soon,.
    Abhishek

    P.S. Looking at your message again, I believe that you got confused between EMP and EPMA :)

    Published by: Abhishek Sep 20, 2011 11:34

  • Impossible to set up the Infrastructure life cycle Manager

    I got config the Orchestra and the initial configuration of LCM. so I want to config of the infrastructure, but I can't select the pool of resources, the data store, the VM folder. the user that I connect to LCM is a member of administrators and COMPUTER administrators. I create the file and the resource group in the CR, but in the LCM, I do not see them.

    in the joint, you can see nothing to select.

    Greetings,

    This behavior is more commonly known when the Service of setting up VMware Orchestrator has not been restarted after you import the SSL certificate for the VirtualCenter server that you have configured. We also found this problem when using LCM 1.0 with VC 2.5 (before update 2). In the latter case, LCM 1.0.1 with VC 2.5 Update 2 or higher solved the problem of not showing the Infrastructure.

    If you use current versions of the software, start by restarting the service Configuration. Then, try to restart your server LCM. This, of course, assumes that you have imported the SSL certificate already for your CV. Please let us know if this post solves your problem.

    -Burke

  • Send partial, immediate and life-cycle problem JSF

    Hello
    I have a form with a text entry field and a "submit" button. The attribute value of the input box (* private String name *)
    is a property of support bean and it is bound to a property RichInputText *(private RichInputText nameField;) *.
    in the same bean support. The Send button has an action listener that calls a method in my backing bean * (displayText (ActionEvent ae *))
    ). Button send the part delivery set to 'true' and immediate attribute set to 'true '. With the value 'true' my understanding is that life cycle jsf defines "apply request values" and then passes the validation, update of the model goes directly to invoke application phase. With this assumption, in call, setNameField (RichInputText name) will be called (apply request values) and I should be able to get the value using the method getLocalValue() on the RichInputText
    class. But when I try to display in my managed bean, it is null.

    How can I access the entry in my bean support value when both the partial shipment and immediate attruibtes are set to true on my "submit" button?

    Here is my support bean class:
    public class SampleBean {}
    name of the RichInputText private field;

    public SampleBean() {}
    }



    private String name;

    public void setName (String name) {}
    myIdName = name;
    }

    public String getName() {}
    return the name.
    }

    {} public void setNameField (RichInputText name field)
    this.nameField = field name;
    }

    public RichInputText getNameField() {}
    return name field;
    }



    {} public void displayText (ActionEvent ae)
    System.out.println (nameField.getLocalValue ());
    System.out.println (Name);
    }
    }



    JSF page:
    & lt;? XML version = "1.0" encoding = "windows-1252'?" " & gt;
    & lt; JSP:root xmlns:jsp = "http://java.sun.com/JSP/Page" version = "2.1".
    xmlns:f = "http://java.sun.com/jsf/core".
    xmlns:h = "http://java.sun.com/jsf/html".
    xmlns:af = "http://xmlns.oracle.com/adf/faces/rich" & gt;
    & lt; jsp:directive.page contentType = "text/html; charset = windows-1252 "/ & gt;
    & lt; f: view & gt;
    & lt; AF:document & gt;
    & lt; AF:form & gt;
    & lt; AF:inputText label = "Label 1" value = "#{sampleBean.name}".
    Binding = "#{sampleBean.nameField}" / & gt;
    & lt; AF:CommandButton text = "Submit" id = "submit" partialSubmit = "true".
    immediate = "true".
    actionListener = "#{sampleBean.displayText}" / & gt;
    & lt; AF:outputText value = "#{sampleBean.name}" partialTriggers = "submit" / & gt; "
    & lt; / af:form & gt;
    & lt; / af:document & gt;
    & lt; / f: view & gt;
    & lt; / jsp:root & gt;

    Hello

    Well oops on my side. Yes, it the field isn't immediate value getSubmitted would not return a null value, but would be getLocalValue. There is an alternative if you do not use the trigger by calling processDecode (context) and processValidations (context) on the occurrence of input text before calling getLocalValue.

    Kind regards

    ~ Simon

  • In an attempt to sign and date a w-9, I get the following message.  "This form is editable in Adobe Acrobat DC.  Please use Adobe life cycle Designer. "How can I get this document dated and signed without having to buy the life cycle Designer?

    Please provide ideas to the next question. In an attempt to sign and date a w-9, I get the following message.  "This form is editable in Adobe Acrobat DC.  Please use Adobe life cycle Designer. "How can I get this document dated and signed without having to buy the life cycle Designer?

    Thank you

    Rick

    Assuming that you are dealing with a PDF file provided by the IRS, you will not be able to e-sign. but you can fill the fields using Adobe Reader or Acrobat. The version of form W-9 that I have does not include a date field, but you can use the feedback tool add text to add a date. You can also digitally sign or use the annotation of pencil tool to draw a signature.

  • I have adobe pro 11 and life cycle seems to not be available more

    Why does the Life Cycle not automatically load Adobe Pro 11 longer?

    Unbundling of the Adobe LiveCycle Designer of Acrobat Pro since version 11 (XI), which came out something like 3 years ago and has been replaced by the DC version recently, so you're a little late to start using XI now... In any case, you will need to buy LCD separately now if you want to use.

  • CC Adobe XI pro and life cycle

    I'm trying to get life cycle acquisition support.  I understand that CC membership activated before 15 October 2012 were eligible to download for free from the cycle of life.  My susbscription began Sept. 26.  Any help appreciated.

    See http://helpx.adobe.com/x-productkb/policy-pricing/upgrade-livecycle-designer-acrobat-xi.ht ml

  • Life cycle of GC and Notifications

    Hello

    Is a call for a MBean WLS to a listener of MemoryNotification included in the life cycle of GC, or is it run completely asynchronous? For example, if my partner had to sleep for 10 seconds, it would increase amount sum of the GC pause time of the same?

    Thank you!

    Sébastien

    No, its completely asynchronous. You are sum of breaks GC will not suffer if your listener to sleep for 10 sec.

    Best regards
    Tuva

    JRockit PM

  • Provide Notifications in all of the life cycle App?

    Hi, I implement of notifications of type push in a Cordova/WebWorks app, and I would like to know what are the options for notifications I can give my app users during the different stages of the life cycle of app.

    When the application is in the foreground , I can post a warning - that's fine. When the application is in the background, I could put the app in the foreground and the attention of the user, although I'd rather see them there is a message to be consumed and let the user decide when to access? The same case applies for push notifications that are received after the app has been closed/killed.

     


    If I understand correctly, using webworks I have not access to notifications bar (reference) to my interactive notifications. Although I can use the API of the application to see the/remove an icon + number on the banner/title bar, for example

    I can also use a reactivation page to display notifications received while the application was in the background or State of killed. Is that what I missed, and is what the above correct? Any suggestions on how to better manage push messages during history and killed States are welcome. Thank you

    Thanks for the quick response.

    Yes, when the application is closed, a push message starts the application, but in the background (it is visible in the task Chooser). Without a notification, the user would not necessarily be aware that a new message has arrived, without getting into the app - I don't want to not push messages to open the app in the foreground without consent/intent of the user. I understand that push, notification messages are separate entities, but I'm interested in how they can work together (the use of notifications to give control to the user regarding if/when consuming incoming messages when the application is not already in the foreground - I should maybe reviewing my post otherwise).

    I think my strategy will be to check if the application is in the background when a push message, if so, save message push of local storage blob/string, increment the number of banner and then users the ability to use/read the message when they re-enter the app.

  • The limit of the device must be less than or equal to the limit of life cycle license in first cisco 2.2

    Hi all

    I have seen under error in the tool main 2.2 Cisco infrastructure

    The limit of the device must be less or equal to the limit of license of life cycle and also secondary device ISE inaccessible since premium.

    Could you please suggest how we can solve your problem.

    Thanks in advance...

    Kind regards

    Sachin

    Yes. Life cycle license are by smart device managed. See this page for a good overview:

    http://www.Cisco.com/c/en/us/support/docs/cloud-systems-management/Prime...

    .. as well as this page:

    http://www.Cisco.com/c/en/us/products/collateral/cloud-systems-Managemen...

    .. who States:

    Life cycle license: allows access to all the features of the life cycle, which includes the configuration of the devices, image management software, basic health and performance monitoring, fault management, troubleshooting and customer visibility on the network. The license of the life cycle is based on the number of managed devices. Life cycle of the licenses are available in sizes from package of 25, 50, 100, 500, 1000, 2500, 5000, 10,000 and 15 000 devices and can be combined as needed to reach a total number of device under license.

    A device is uniquely identified through the assigned IP address and system object ID (SysOid). Routers, switches, light/unified access points and network first Cisco (NAMs) analysis Modules are charged on the number of licenses. If a switch stack is managed via a single IP address, it counts as a single device. A single frame will, however, be counted as multiple devices if the chassis is configured with several IP addresses. For example, a switch with several service cards, such as a firewall and so forth, or a stackable switch with an IP address assigned to each switch who is involved in the stack is considered multiple devices within the first Cisco Infrastructure. Cisco Wireless LAN controllers (WLCs), autonomous and peripheral access points third are not counted against the number of licenses.

    When you have more devices that licenses, you will receive the error see you and prevented from adding additional devices to your inventory.

    We see it more often when it is light (i.e. not independent) APs are added to a wireless controller. PI will not prevent the new APs to be added, they are managed under their association with the WLC. However, if you try to add a new switch it would prevent you to do until the deficit of licenses has been sent.

  • Life cycle of an Application of automatic start

    Y at - it a document on the life cycle of an application to auto-start.  Huge things, I managed to understand are:

    1 even if I have a trademark application like auto start, I should give the user a way to exist, enforcement, if I phone/disable the power demand will not restart... it should run when occurs the powerdown.

    2. when a request for AutoStart runs during shutdown is not really out, it's just dormant and picks up right where it left off on the power.

    3. the application if it has a TimerTask (say every minute) even operation when power off of these tasks keep piling up, when I turn on, once again, I get a bunch of tasks that occurred during power off (granted I can stop stains on poweroff, but how these tasks stack if the application is not running?)

    compromise soft power (and automatic disconnection) leaves some things up and running in the appliance. It is, for example, how the awakening is able to wake you up in the morning.
    for reoccuring timertasks, this means that you must cancel and reset their start

  • You have to have a license of the life cycle, but also licensed insurance with premium

    I first 2.1 and I'm trying to see what I need to use licenses.  When you enable Netflow on a device, I see where he uses an insurance license.  My question is, should I also use a license of the life cycle?

    Thanks in advance.

    Hi joseph,

    You must purchase licenses of access to the features of the first Infrastructure and insurance licenses to access the features of insurance in the first Infrastructure lifecycle. Each license also controls the number of devices, you can manage using these features.

    If you have installed the first Infrastructure for the first time, you can access the features of the cycle of life and insurance management using the built-in evaluation license. The default trial license is valid for 60 days and a maximum of 100 units. Send a request to [email protected] / * / if:

    You need to extend the evaluation period.
    You need increase the device-County line.
    Already, you have a special license and must assess other feature licenses.

    Hope this answer your question.

  • Satellite S50-B-12Z: battery life cycle Option does not appear in the eco utility

    Hello everyone.

    I am facing a strange problem. The eco utility allows to work ok with win 10 on my S50-B-12Z satellite and I used the eco charging battery I've run mainly my laptop plugged in.

    At some point, I need to do a system restore. I have re-installed the 10 victory and also the latest version of the eco utility downloaded from the Toshiba site. The problem is that when I open the utility eco, the choice of "battery life cycle", where you can select the eco reload or not, seems no more! So I find myself with the battery to 80% connected but does not support.

    I already tried to uninstall and reinstall the utility or install an earlier version of it.

    Is there something I could do in order the choice of "battery life cycle" to reappear or to cancel the State of charge of eco and leave my battery to charge again 100%?

    Thank you

    I have the same problem with my P50 - A satellite. Battery-life cycle does not appear in the new eco Win 10 utility installed. Version is: 3.0.0.0006. Older versions do not work, I tried also.

    More than 80% of maximum load, not 100% .

    I hope someone has a suggestion. To 80% battery life is too short

  • Life cycle of RDP

    There are so many different versions of RDP.

    I m looking for a list of life cycle of the 'Remote Desktop Client"and"Remote Desktop Protocol.

    Which versions are still supported by MS?

    What rdp client is able to connect to what version of rdp Terminalserver? compatible version of RDS - CAL etc.

    Hello

    My apologies for the delay in response.

    For more information on this issue, you can post your question here in the TechNet forums.

Maybe you are looking for

  • Extended warranty

    How can I extend the warranty of my HP laptop.

  • Error uploading photos

    Since a few days the photo on my iMac app does not download new photos. It does not show the white space with the gray cloud, and even the news of the photo are available. So, it looks like this: When I open a picture it remains white and the little

  • The simultaneous use of two input DVB - T & S - Video on Qosmio G30

    Is it possible, Qosmio player or media library, to have the G30 established to receive a signal from two the built in DVB - T tuner & an external source, such as Sky Digital, connected to the S-video input or Composite? The setting in the library see

  • HPENVY 5530: connection of my 5530 HPENVY printer to my laptop HP

    My printer prints of some of the programs so I know it works, but it does not connect to my laptop to print anything from there.  It will print very well but it is not any longer.  How to reconnect my printer to my laptop?  Thanks in advance for your

  • Lenovo X 1 carbon don't disable...

    I recently bought a carbon Lenovo X 1, the strange thing is that the computer functions properly when the power cord is plugged in, but when the power cord is unplugged the computer DOES NOT turn off no matter what you do. It restarts all the time. I