Adobe Elements 9, incorrect date in the calendar project

After selecting a start date of January 2011, my project shows January 2010 - December 2010.

I printed a calendar page just in case it was an example of the view of the project but in January 2010 print calendar.

My system for computer date indicates the correct date.

Can someone help me?     I can't find anything in the preferences to change the date in the title of the editor or organizer.   Maybe

I missed it.    Also, it would be nice if I can change the date the project information, so I can't do it again.

Thank you

Select 2012 and get 2011.

Tags: Photoshop

Similar Questions

  • Redirect to a specific date in the calendar

    Hello


    I have a page with a calendar area.
    In this calendar A one day I insert
    an icon if a condition is met. (someone has taken a holiday that day).

    When I click on this icon, I get redirected to the page where
    another calendar B shows holidayperiods of my colleagues.

    It works very well. What I would like to have is a redirect from the day A calendar
    When the icon is inserted at the precise date in Schedule B.

    I got this piece of code schedule has, select sql source area.

    SELECT...,
    DECODE (COUNT (DECODE (x.userid,: F12_USERID, y.userid, null, 1)), 0, NULL, ' <>)
    (< img src = "#WORKSPACE_IMAGES #icon.png" >
    ') days

    Of...

    How can I change my < a href > for that specific day?

    double <> <> is, because otherwise the href part is not shown here.

    TNX

    Hello

    Page 8 is the one you link, you should have an element of hidden P8_CALENDAR_DATE page. This is the date on the calendar in the YYYYMMDD format. You can update with your link:

    'f?p=&APP_ID.:8:&SESSION.::NO::P8_CALENDAR_DATE:' || TO_CHAR(THEDATE,'YYYYMMDD')
    

    Andy

  • I've updated to Sierra, na not use iCloud, now I see all of my dates in the calendar are gone!

    I've updated to Sierra, na not use iCloud, now I see all of my dates in the calendar are gone!

    If it was in iCloud, turn, if they were not, tell us where they have been

  • PhotoSmart e-all-in-one B210a: Incorrect Date for the installation of ink

    I installed new ink cartridges, then print a diagnostic report. The report said that I had installed the cartridges on 15/04/2016, but the date was actually 21/04/2016.  Well, my printer is five days late, but I do not see where to change the date on the calendar on the printer. I logged into the IP address of the printer, but there is nowhere to change the date, either. Clock and calendar on the computer are correct.

    Hi Caesar1948,

    You are welcome!

    It seems not be an option in the settings to change the date and time. However, we can try a semi full reset, which will restore the printer to its factory settings, if you wish. I sent you instructions in a private message. If you are unfamiliar with the operation of the function of private messages of the Forum, this post has instructions.

    If this, or one of the posts on this thread, helped you to solve the problem, please click on accept as Solution on the message. To show you 'like', or that they are grateful for my post, please click the thumbs upwards below. If there is anything else I can do to help, please don't forget to let me know!

    I hope it's useful!

  • I can't click on the icons at runtime - displayed at the bottom of the screen - and I can't click on the date or the calendar

    bottom right of my computor screen - I can't click on the date or the calendar (where the time is displayed) - I also can't click on any icons at runtime - as... volume or virus protection icons, etc.

    Hello

    1. what security software is installed on your computer?

    2 have you made changes on the computer before this problem?

    3. do you get any error code or error message while starting?

    I would suggest trying the following methods and check if it helps.

    Method 1:

    Start in safe mode and check if the problem persists, if the problem does not persist then the issue may be due to any third-party application. To determine what third-party application is causing this question the computer place in the State of clean boot in safe mode and then restart the computer in normal mode...

    Step 1: Start Windows Vista in safe mode:

    http://Windows.Microsoft.com/en-us/Windows-Vista/start-your-computer-in-safe-mode

    Step 2: How to troubleshoot a problem by performing a boot in Windows Vista or in Windows Vista:

    http://support.Microsoft.com/kb/929135

    Note: once you have completed troubleshooting, try the procedure described in step 7 to reset the computer to start as usual.

    Method 2:

    Run the scan tool (SFC) System File Checker and check if it helps.

    How to use the tool File Checker system to troubleshoot missing or corrupted on Windows Vista system files: http://support.microsoft.com/kb/929833

    Also use Microsoft Safety Scanner and check if there is no threat of viruses.

    Microsoft safety scanner: http://www.microsoft.com/security/scanner/en-us/default.aspx

    Note: The Microsoft Safety Scanner ends 10 days after being downloaded. During these 10 days, it will remove all the files infected by the virus and records. I suggest you create a backup of your data, and then install Microsoft Safety Scanner.

    Hope the information is useful.

  • Quick date using the calendar view

    Hello

    My requirement is to filter the data for a column using command prompt. I want to show the guest as a calendar for the column. The data type for that column is "Timestamp" in the physical layer and I changed it to 'Date' data type in the MDB layer.

    I created a prompt and after selecting a date in the calendar, he throwed the following error
    ("' A date value was expected (received" 2010-09-01 00:00:00 "). »

    For a test, I used following an instruction box in the quick column:
    When case 1 = 0 then «Date of booking calendar» "" Calendar Date "of another TIMESTAMP ' 2009-01-01 00:00:00 ' END
    His "01/01/2009 12:00:00 AM" after if you select this prompt modification date, but the data that I have in the date column is "01/01/2009".»

    I tried several ways so that I can see results, but I am not able to convey the correct value to the State of the command prompt.

    Can you please tell me how to fix this?

    Thank you
    Phani.

    Hey Brad,

    Here are the steps

    My report

    (1) http://img52.imageshack.us/img52/482/pic103.png

    Guest

    (2) http://img52.imageshack.us/img52/8783/pic104.png

    Your question

    http://img52.imageshack.us/img52/4571/pic105.PNG 3)

    Work around

    http://img52.imageshack.us/img52/3828/pic106.PNG 4.1)
    http://img52.imageshack.us/img52/7311/pic107.PNG 4.2)

    no final report no error:

    (5) http://img52.imageshack.us/img52/446/pic108.png

    Thank you
    Saichand.v

  • Incorrect date in the field Explorer update

    I bought a new flash drive to use for backups. I created a new folder, backup files and copied and saved to My Documents. later I noticed the flash player was two files, backup files, I had created, and the other call. ReadyDLNA. The update indicated to explore for. ReadyDLNA was 12/31/1999, as well as the date on my newly created backup files was 02/01/2000. What caused the update to be incorrect? I've been bitten by the bug? Everyone knows about this problem? What sets the date for the update in the Explorer? Is it possible to fix dates? Thank you.

    I was really hoping to be able to change the date, but I guess that you're telling me that there is no way to do. Right?

    No, unless you always want to use a 3rd party utility.

    With the tools you suggested, it would be possible to partition the flash player without destroying my backup file and then format the new partition to NTFS, or I just need to reformat the entire flash drive and lose my backup?

    If your flash drive is big enough you just "Shrink" / resize the existing partition, create a new partition and format it.

    Why do you have NTFS? - More robust than FAT32

    J W Stuart: http://www.pagestart.com

  • Incorrect date on the screen of TP phone sessions

    Hello

    As you know, the sessions of TP phone screen shows forthcoming meetings. the clock shows properly at the top left, as 18:19 07/17/11, but in the second line, the date of scheduled meeting is not today, as 23/05/06

    Any help will be much approciated

    Fix... While the phone may have the right date because he can pick up the date / actual time of the SIP messages it receives, the planned meeting information gets fed to the screen of the phone of the codec. So, if there is no set of NTP server, the codec may have an incorrect date and it will show the meetings for that day, even if the phone clock shows the correct date.

  • How to restore dates to the calendar on the windows screen tiles 8

    I stopped inadvertently tiles from calendar in windows 8, the indication of the date.  Now I could not restore the back.  Please tell us how to restore dates on the tile.

    Hi valerie,

    If you are referring to the display of the date on the start screen, then you can simply turn on live tile in a right click on the calendar app and selecting enable Live tile on. Then you should be able to see the date on the start screen of the tile appearance.

    You are always welcome in our community for all queries related to Windows. We would be happy to help you.

  • How can I replace a source element without having to redo the iMovie project?

    When exporting an iMovie project, I detected that a source element had bad images and export could not comlete (error 10008). I fixed the file and replaced it within the overall project. But after that iMovie refuses to play this clip during the opening of the new project - it shows an exclamation point in the chronology and the message "the clip has changed."

    Is there a way to replace an element in the project?

    A few facts:

    • The clips are AVI containers
    • I used Yodot AVI repair to remove the bad images
    • The repaired file use the same as the original codecs
    • version of iMovie: 10.1.1

    Yes.  With the Finder, drag the clip fixed everywhere where it is saved until it is placed on the old item in project.  When a green plus sign appears next to the cursor let go of the mouse button and you will get a menu.  Click "replace".  The duration and all connected titles, glitches or audio should not be affected.

    Geoff.

  • After you install Internet Explorer 9 (Beta) desktop computer does not display a date on the calendar

    Original title: after the installation of the Board explorer9 will not display calendar date

    tried to re install calendar but still no date display

    Hey flatcoat4247,

    O are you talking about the gadget?

    O also, do you mean to say the version of Internet Explorer 9 (Beta)?

    This behavior is most often observed if the XML registration is missing in the system. To resolve this issue, follow these steps:

    a. close Windows Sidebar. To do this, right-click on the Sidebar icon in the Notification area, and then click exit.

    b. open an elevated command prompt window.

    To do:

    i. click on Start > all programs.

    II. click Accessories.

    III. right click on invite and then click run as administrator.

    c. in the command prompt window, type the following command and press ENTER:

    regsvr32 msxml3.dll

    Similarly, run these commands:

    regsvr32 scrrun.dll

    regsvr32 jscript.dll

    If the registration was successful, you will see the message DllRegisterServer in succeeded to for each executed command.

    d. open Windows Sidebar (sidebar.exe) and check if the problem is resolved.

    See if it works.

    Kind regards

    Shinmila H - Microsoft Support

    Visit our Microsoft answers feedback Forum and let us know what you think.

  • Is there an API to get the date on the calendar open based on production schedule

    Hello

    I have a need to determine if promised PO date is open in Oracle manufacturing calendar. Is there a public API, or private, can I use for this? We are on Oracle EBS R12.

    Thanks for your help.

    AB

    I found the name of the program. It's mrp_calendar.next_work_day.

    Thank you.

    AB

  • 11 Adobe elements can make changes to the photos on CMYK specifications?

    11 elements Adobe can make changes in pictures on the following photo specifications??

    Minimum size - the largest dimension, with the culture tight, for min. 3 in @ 200 dpi
    Default - size the largest dimension, with the culture tight, to be of at least 5 inches at 300 dpi
    CMYK color mode
    Gray balanced, clean and bright
    Catchlights - 0%
    Highlight - 2-3%
    White - (C-M-Y - K - 0% 1% 1% 2%)
    Shadow - 85%-90%
    Black - (C - 70%, M - 50%, Y - 50%, K - 90%)
    Ink limit - 260%
    Saved Clipping path provided with a flatness of 1-5
    Not less than 10 with quality compression setting JPEG file format *.

    Title of the message was edited by: Brett N

    Photoshop Elements can not exit edit CMYK or CMYK.

  • Incorrect date in the registration of the guarantee

    Salvation;

    I bought a laptop whose model: PSAL6E-07P00LTE about a week ago. I registered the toshiba website standart warranty. But I decided the wrong date of purchase. How can I fix this or can solve this problem?

    Please can someone help me with this situation?

    Thank you...

    Hello

    I agree with the user above. On the Toshiba site I founded the same e-mail address and it seems that s the first contact for problems on the records of the guarantee.

    Don t forget to add all the important information that your problem could be solved as soon as possible! :)

  • I want to transfer the dates on my calendar for Windows (Vista) in my Samsung's Android phone calendar.

    I have installed Samsung Kies on my PC, but cannot work out how to transfer through synchronization.  My phone is a Galaxy Ace GT-S5830i.

    Hello

    Thanks for posting your question on the Forums of community of Microsoft.

    According to the description, I see you want to transfer the date of Windows calendar to your Samsung android phone.

    To better assist you, please answer these questions:

    1. in what program the dates on the calendar are stored?

    2. you are trying to transfer from outlook?

    Kindly get back to us with information so that we can better help you:

Maybe you are looking for

  • BAD PS/PDF print-out in case of special/on paper size/size measure

    Dear Apple developers Pages We hardly found any new SW Version Apple Pages (after Version 4 / 09) EQ. Version 5.6 (2553) turn its PS/PDF-print output in the WRONG way. Attention: This SW-error occurs ONLY in the case of paper special/custom size/form

  • Thinkpad R60 ram slot problem

    Hello I have 2 x 1 GB (same type) and 1x512mo (another manufacturer) ram sticks. With all the seperatelly put into the lower slot laptop works very well. If I put in 2x1gb I get 4 beeps and no boot, if I put 1 gb + 512 mb, I get a black screen with n

  • Why won't my HP Officejet 4620 see my HTC Thunderbolt as my router?

    I use my phone as my router at home.  I use a Chromebook and want to print clouds.  My printer has wifi, and yet it does not recognize my hotspot on sight as my router.

  • Cannot access the recovery command prompt Vista computer network

    I have Vista machine over the network to a Windows 7 computer and used wbadmin to perform a backup of the Vista machine on a shared folder on the Windows 7 machine. Now I want to access it from the Vista recovery command prompt (after the start of th

  • Gaget stock misssing for Win 7

    What happened to the stock of Vista gaget? From Microsoft?  Someone at - it a link to download?