Between the problem of dates

Hello world

We try to get a SQL sentence for our data model, and we have 2 parameters of date as "MM-dd-yyyy".

When we put them inside our SQL query, we saw that it needed the date as "MM-dd-yyyy HH24:mi:ss", and the HH24 Gets the value of a ' 11:00 ", so if I have a record in 11:10, or one in 10:50, it is filtered differently for the same day, depending on whether we use it in the parameter 'Start Date' or in the parameter 'End Date'.". "

The filter in our query is like:

'TIME' BETWEEN (: STARTDATE) AND (: ENDDATE)

Can someone explain to me how this works exactly? because I need to get all day in the filter and is not only the half hours.

Thank you.

Simple thing is cast to date and use, simply go by date without taking account of the time.

Tags: Business Intelligence

Similar Questions

  • Use the data from a DataSet as a source for another (the join between the sets of data)

    Hello. I come with a problem, very simple, but which I think is not implemented in the beer Pub.

    In the DataModel, I create a DataSet, providing some data (for example, a string from a web service), and after this, I create another set of data that uses this string as a parameter for a database query. Is this possible? The only link I found between the sets of data is only this concatenation of the main data set.

    Is there a way that I can do? Thank you!

    * [url http://www.java-forums.org/blogs/advanced-java/collection/] Java collection *.

    In Publisher 10 g and sooner you can use a data model to the join and the structure of data from different sources SQL.

    In Publisher, 11g, you can join data sets for which Publisher can 'know' on the data fields. For example. In addition to SQL data sets, you can reach Excel, LDAP, MDX and answers. Web Services, like XML file are data sets that editor does not know the data fields, so unfortunately, no way to join them... I know.

    Also, true that LOVs can either be SQL or data fixed (i.e. the entered values).

    Allowing the Web Service as a source of LOV or a way to define data fields, it's something for us to consider for a future version.

    Mike

  • Help with the problem of data type...

    Hi friends,

    I have a requirement. I have a warrant 2 guests (from and to). The data contained in the guests are like "Fall 2006", "spring 2006", "full of 2006", "Academic 2006"for a given year. " I have data from the year 2000 to 2008. The data type of the column duration in varchar. I have a report corresponding to this prompt. This report works well if it is not linked with the guests. If I have this tie with guests, its giving me results because in the report I gave filter as term is greater than or equal to ' fisrt_pv "(où first_pv est la variable de présentation j'ai utilisé pour mon d'invite de terme... comme second_pv sage est pour à terme rapide) and the term is less than or equal to"second_pv"."» So, if I put my guest (and) fall 2007 and (spring 2008 to) and run the report, its sends a fall 2007, Full 2000... Full2008, spring 2000... Spring 2008. It is because it is comparing the term based on letter of departure with all the other term. We know that the fall 2007 and spring 2008 are next to next semesters, is expected to see just a 2-column output. How do oracle know that?

    I have a term_number associated with this table numbered 1 to the spring of 2000, 2 Full, 3 for autumn 2000 2000, 4 for academic 2000... all the way up to academic 2008. I used this area to the command prompt to order because I want the guest to show as the spring of 2000, Full 2000, fall 2000 etc. instead of 2000 academic, University 2001... hope this field will be useful for you to analyze... I need your help to do this... If you need other info let me know... Thanks for your time n help...

    Kind regards...

    Yes. The problem is that your guests are CHAR, so the calculation "superior to" is done alphabetically rather than numerically. This digital keys.

    Create two columns to contain the term_number that match the values selected in your guests. Then the BETWEEN operator do not filter on numeric values. You can still view the CHAR values in your report, but now they will be in the range that you would expect.

  • delay between the trigger and data acquisition

    Hi, I use NI SMU-6368 as a tool for data acquisition. In my experience, I use an external digital trigger to start taking measures of a thermistor.

    However, before the experience, I want to know the time that elapses between the detection of the trigger signal and data acquisition start time.

    Is there a way to do this?

    Here's the kind of thing I configure to get an accurate measure of time of t = 0 trigger signal to the

    the actual first A/D conversion.   It may be too much for a measurement of the temperature, but you should get

    the right track.

    -Kevin P

  • Calendar and the problems of data collection with the DAQ Assistant

    Hello NOR Developer area,

    I am a Novice of LabVIEW and have seen how helpful you all can be, and if I come to ask for your help.

    I'm having some trouble with a VI I built that specifies an input voltage, a SCB - 100 connected to a PCI-6031E and converts this tension in a temperature displayed on a waveform table. The goal is to give a constant reading of the temperature and display it in a chart for as long that the VI is running (and to reset the chart the next time the tracks of VI).

    The problems I've encountered currently are:

    -After a few minutes of the VI running, I get an error message 200279: tried to read samples that are no longer available. The requested sample was already available, but has since been replaced. (to the DAQ Assistant express VI).

    -I don't know how to change my chart so that the minimum value X is both during which the VI was launched and have the maximum X value increases with each iteration of the loop. Currently, I have the VI get the time system and contributing to the property node X scale. This worked for the graph of the voltage, but not for the temperature chart

    I appreciate those of you who took the time to read my post.

    Thank you all for your help.

    Sincerely,

    Ethan A. Klein

    SB candidate in Chemistry & Physics

    Massachusetts Institute of Technology

    Class of 2015

    PS I enclose my VI to give you a better understanding of my current situation.

    E A Klein wrote:

    Thanks for writing.

    What property node is talking?
    I do not understand that many different data types. How can I go on the treatment of all the data?

    (Did you mean I should wire 'blue' data for mathematical functions rather than using the node property tension?)

    Sincerely,

    In fact, one of the nodes property.  I mean specifically the tension property node.  But in reviewing, I noticed the other nodes in property for the chart.  Just set auto-scaling to the X scale and that should take care of two of the nodes property (right click on the graph, X scale-> AutoScale X Scale).  I also recommend placing your mathematical functions in a Subvi to make things easier to read.  Attached, that's what I think you're after.

    I hope that these small tweaks will speed things up enough to avoid your error.  If this isn't the case, then we should begin to look at the design of producer/consumer model or take readings at the same time.  It might also be worth looking away the DAQ Assistant and DAQmx real screws.  But one step at a time.

  • The scale and the relationship between the problem of points

    I had a few problems with setting the scale of the objects and their appearance before and after the scaling.

    The relationship between the points change when I change things, and it's a little embarrassing.

    Before that I put across that circle with an arrow, it looked like this:

    before.jpg

    Then after that I put across it, the lines on the arrow were not in place:

    after.jpg

    It happens very often when I am scaling of paths in illustrator. Is there something I can do to prevent it? Often I make things evolve upwards or downwards and it is a little painful when I know I'm going to screw up the path.

    before-2.jpg

    after-2.jpg

    Go to the drop down at the top right of the Panel processing and disable "Align new objects to the pixel grid."

    Edit: If you select 'Web' in the new Document dialog box, "Align new objects of pixel grid" is enabled by default, at the bottom of the box. You can choose to disable it there before OK-ing the creation of the document.

  • Drag between the problem of trees

    I've set up two trees based on xml and I was able to put in place by dragging the nodes between the trees. I have automatically expanded to all nodes in the tree on creationComplete and prevents the user to close a node (by automatically further on itemClose).

    I kept all the expanded nodes because it is easier for the user to understand configuration by dragging in files (as there seems to be a limitation of flex that you can't move to a folder, except if it is developed).

    In any case, that is the problem - when an element is moved from one tree to the other, he enters the new tree as a closed node. It's ridiculous, but I can't work on how to open it! I need an event that occurs after the node between the new tree. the dragDrop event seems to occur before the node is added to the tree.

    can someone point me in the right direction?

    Try to use callLater() to delay the execution of the expand node code.

    Tracy

  • See link and navigate between the problem of pages...

    Hello world! Hope someone can help with my problem. DB, I have a table with information on employees and employment. This one table I did an OS where I did 2 VO - EmployeeVO and JobsVO. I connect these two VO with ViewLink - EmpJobVL (realtionship 1 to 1).

    Then I created 2 .jspx pages. In a page I droped EmployeeVO but on the second page I droped JobsVO. I put the button with which I can navigate between these two pages in the page template.

    The problem is when I start my employee page and navigate to the correct folder with the 'next' button and then try to navigate to the jobs page and then in the jobs page I can't see correct record. I still see everything first save. Why this is so and what can do?

    Hope that someone help me,

    Best regards, Debuger!

    Hi Debuger,

    No probs, you can keep your Jspx so u just have to clean your PageDefs... More fight urself its such an easy task...
    Remove all entries def of your page and then have a copy of your jspx coding in a notebook that also remove...
    Drag your def jspx and page a new re-make your your and paste your new jspx encodings
    your your get binded automatically... :)

    Kind regards
    Suganth.G

  • Between the two, and dates

    Hi all

    Given the following data:
      A  |     START_DATE        |         END_DATE
    --------------------------------------------------------------
      1  |  01/01/1970  00:00:00 | NULL
      2  |  01/01/1970  00:00:00 | NULL
      3  |  01/01/2004  00:00:00 | NULL
      4  |  01/01/2004  00:00:00 | 01/01/2007 00:00:00
    If I run the following query,
    SELECT
      *
    FROM
      (
        SELECT
          NVL(trim(TO_CHAR(A)),'-') AS "Code",
          NVL(trim(TO_CHAR(start_date)),'-') AS "Start",
          NVL(trim(TO_CHAR(end_date)),'-') AS "End"
        FROM
          my_table
        ORDER BY
           A
      )
    WHERE
      (
        '01/01/2004' BETWEEN to_date("Start",'DD/MM/YYYY') AND to_date(
          case "End"
            WHEN '-'
            then '31/12/9999'
            else '01/01/2007'
          END,'DD/MM/YYYY')
      )
    I have only the first three rows. Why the fourth line is excluded?

    Stephan

    ----------------------------
    10.2.0.1.0 Oracle
    Linux 32 bit

    Yes, you're right it does not and, after working on it for more than an hour, I'm pretty sure it's a bug in the CASE statement.

    Look at this:

    Alter session set nls_date_format='YYYYMMDDHH24MISS';
    
    SQL> SELECT
      2  Endd,
      3  case WHEN endd='*' then '-' else endd END,
      4  to_date(case WHEN endd='*' then '-' else endd END,'DD/MM/YYYY'),
      5  to_char(to_date(case WHEN endd='*' then '-' else endd END
      6  ,'DD/MM/YYYY'),'yyyymmddhh24miss')
      7  FROM (SELECT '01/01/2007' endd FROM DUAL);
    
    ENDD       CASEWHENEN TO_DATE(CASEWH TO_CHAR(TO_DAT
    ---------- ---------- -------------- --------------
    01/01/2007 01/01/2007 20070101000000 00000000000000
    

    As you can see the Endd column is set to 01/01/2007 and this is the value of the CASE and the TO_DATE too. But when you convert it to a string using TO_CHAR you get 00000000000000.

    This only happens if you use the CASE and compared, in the CASE WHEN clause, ENDD to something.
    For example, this works:

    SQL> SELECT
      2  Endd,
      3  case WHEN 1=2 then '-' else endd END,
      4  to_date(case WHEN 1=2 then '-' else endd END,'DD/MM/YYYY'),
      5  to_char(to_date(case WHEN 1=2 then '-' else endd END,'DD/MM/YYYY'),'yyyymmddhh24miss')
      6  FROM (SELECT '01/01/2007' endd FROM DUAL);
    
    ENDD       CASEWHEN1= TO_DATE(CASEWH TO_CHAR(TO_DAT
    ---------- ---------- -------------- --------------
    01/01/2007 01/01/2007 20070101000000 20070101000000
    

    It is identical to the previous one except the CASE WHEN clause.
    I did more than 20 different tests and whenever I put Endd in the CASE WHEN clause, the CASE seems to work fine, fact the TO_DATE but not the outermost TO_CHAR referring 00000000000000...

    As a workaraudo, you can use DECODE place od the CASE:

    SQL> SELECT
      2    *
      3  FROM
      4    (
      5      SELECT
      6        NVL(trim(TO_CHAR(A)),'-') AS "Code",
      7        NVL(trim(TO_CHAR(start_date)),'-') AS "Start",
      8        NVL(trim(TO_CHAR(end_date)),'-') AS "End"
      9      FROM
     10        my_table
     11      ORDER BY
     12         A
     13    )
     14  WHERE
     15    (
     16      '01/01/2004' BETWEEN to_date("Start",'DD/MM/YYYY') AND
     17                           to_date(DECODE("End",'-','31/12/9999',"End"),'DD/MM/YYYY')
     18    )
     19  /
    
    Code                                     Start      End
    ---------------------------------------- ---------- ----------
    4                                        01/01/2004 01/01/2007
    

    but I suggest you change the entire query to simplify it, like:

    select a code, start_date "Start", end_date "End"
    from my_table
    where to_date('01/01/2004','dd/mm/yyyy') BETWEEN start_date
          and nvl(end_date,to_date('31/12/4712','DD/MM/YYYY'));
    

    Published by: Massimo Ruocchio, December 19, 2009 15:52
    All of the above queries were run on 10.2.0.1 the same version used by the Po.
    I tested all applications above on 9.2.0.4, 10.2.0.4 11.1.0.6 and everything works fine.
    Now, I'm sure it's a bug of the 10.2.0.1 version.

    Max
    [My Italian Blog Oracle | http://oracleitalia.wordpress.com/2009/12/19/totali-parziali-con-group-by-rollup/]

  • What is the difference between the "Received" column & "Date"?

    The entries in the columns of "Receipt" and "Date" of the re CT should be the same; When they differ, it is no more than a few minutes. I wonder, that these columns show exactly? Why do these two categories? It obviously has something to do with the header lines, but I could not find it.

    one is the date of the sending of the message, the other the arrival time. Usually it is only a minute or two different these days, hours were not uncommon in the past and even now, Google, will try and deliver a week. If your server down lovers and it takes 5 days to fix or the submarine cable is blown, you will get the google mail which takes days in the date but also fresh column like today in the received.

    I have only the date. By clicking on the right-hand column headings allow you to customize the columns are displayed

  • Regarding the problem of Date in Oracle.

    Dear Sir.

    I want the query q that will give me the result in the following form.

    for example. entry date is 30.09.2012 then the output should be

    "Up to 31.03.1996.
    "01.04 - 1996 - 31.03.1997'"
    "01.04 - 1997 - 31.03.1998'"
    "01.04 - 1998 - 31.03.1999'"
    "01.04 - 1999 - 31.03.2000'"
    "01.04 - 2000 - 31.03.2001'"
    "01.04 - 2001 - 31.03.2002'"
    "01.04 - 2002 - 31.03.2003'"
    "01.04 - 2003 - 31.03.2004'"
    "01.04 - 2004 - 31.03.2005'"
    "01.04 - 2005 - 31.03.2006'"
    "01.04 - 2006 - 31.03.2007'"
    "01.04 - 2007 - 31.03.2008'"
    "01.04 - 2008 - 31.03.2009'"
    "01.04 - 2009 - 31.03.2010'"
    "01.04 - 2010 - 31.03.2011'"
    "01.04 - 2011 - 31.03.2012'"

    When the entry is 31/12/2012 then exit

    "Up to 31.03.1996.
    "01.04 - 1996 - 31.03.1997'"
    "01.04 - 1997 - 31.03.1998'"
    "01.04 - 1998 - 31.03.1999'"
    "01.04 - 1999 - 31.03.2000'"
    "01.04 - 2000 - 31.03.2001'"
    "01.04 - 2001 - 31.03.2002'"
    "01.04 - 2002 - 31.03.2003'"
    "01.04 - 2003 - 31.03.2004'"
    "01.04 - 2004 - 31.03.2005'"
    "01.04 - 2005 - 31.03.2006'"
    "01.04 - 2006 - 31.03.2007'"
    "01.04 - 2007 - 31.03.2008'"
    "01.04 - 2008 - 31.03.2009'"
    "01.04 - 2009 - 31.03.2010'"
    "01.04 - 2010 - 31.03.2011'"
    "01.04 - 2011 - 30.06.2012'"

    Similarly in the same way.

    Please give me the solution

    Thanks and greetings

    Hello

    That's what you asked for:

    VARIABLE  input_date  VARCHAR2 (10)
    EXEC      :input_date := '31.12.2012';
    
    WITH    got_end_date      AS
    (
         SELECT  ADD_MONTHS ( TO_DATE (:input_date, 'DD.MM.YYYY')
                      , -6
                      )          AS end_date
         FROM     dual
    )
    ,     got_start_date     AS
    (
         SELECT     ADD_MONTHS ( TRUNC ( ADD_MONTHS ( end_date + 1
                                            , -3
                                  )
                           , 'YEAR'
                           )
                      , 3
                      )          AS start_date
         ,     end_date
         FROM     got_end_date
    )
    SELECT       CASE
               WHEN CONNECT_BY_ISLEAF = 1
               THEN 'Upto '
               ELSE TO_CHAR ( ADD_MONTHS ( start_date
                                          , -12 * LEVEL
                                    )
                          , 'DD.MM.YYYY-'
                        )
           END
           || TO_CHAR ( CASE
                                   WHEN  LEVEL = 1
                             THEN  end_date
                   ELSE  ADD_MONTHS ( start_date - 1
                                    , -12 * (LEVEL - 1)
                              )
                           END
                , 'DD.MM.YYYY'
                )        AS txt
    FROM       got_start_date
    CONNECT BY     LEVEL     <= 17
    ORDER BY  LEVEL     DESC
    ;
    

    Boneist has a good point: If you explain what you want, it will be easier for people to find solutions and to provide correct solutions.

  • Help to calculate the difference between the set of dates

    CASE_NAME         TEST_NAME           TEST_ON_HOLD_DATE        TEST_OFF_HOLD_DATE           Days On Hold (Not actual column in the table)
    
    A   1           01-JAN-12               03-JAN-12          3 
    A   2           01-JAN-12               05-JAN-12          5
    A   3           01-JAN-12            08-JAN-12          8
    A   4           04-JAN-12            10-JAN-12          7
    A   5           13-JAN-12            16-JAN-12          4
                                                                                                                                                -----        
                                                                               27               I actually want  total hold days as 14
    
    B  1             01-FEB-12            03-FEB-12          3
    B  2           02-FEB-12            05-FEB-12          4
    B  3           03-FEB-12            08-FEB-12          6
    B  4           05-FEB-12            10-FEB-12          6
    B  5           13-FEB-12            16-FEB-12          4
                                                                                                                                               -----
                                                                               23              Actual hold days for case B :14 days 
    
    I am trying to calculate actual hold days for each case ,could some one please help me to give me idea to start he issue.
    
    
    
    create table Caris_Life (case_name varchar2(10) ,Test_name varchar2 (10),Test_on_Hold_date date ,test_off_hold_date date);
    
    insert into  Caris_life  (case_name,Test_name,Test_on_Hold_date,test_off_hold_date) values ('A',1,TO_DATE ('01/01/2012','MM/DD/YYYY'),TO_DATE ('01/03/2012','MM/DD/YYYY'));
    
    insert into  Caris_life  (case_name,Test_name,Test_on_Hold_date,test_off_hold_date) values ('A',2,TO_DATE ('01/01/2012','MM/DD/YYYY'),TO_DATE ('01/05/2012','MM/DD/YYYY'));
    
    Insert Into  Caris_Life  (Case_Name,Test_Name,Test_On_Hold_Date,Test_Off_Hold_Date) Values ('A',3,To_Date ('01/01/2012','MM/DD/YYYY'),To_Date ('01/08/2012','MM/DD/YYYY'));
    
    insert into  Caris_life  (case_name,Test_name,Test_on_Hold_date,test_off_hold_date) values ('A',4,TO_DATE ('01/04/2012','MM/DD/YYYY'),TO_DATE ('01/10/2012','MM/DD/YYYY'));
    
    insert into  Caris_life  (case_name,Test_name,Test_on_Hold_date,test_off_hold_date) values ('A',5,TO_DATE ('01/13/2012','MM/DD/YYYY'),TO_DATE ('01/16/2012','MM/DD/YYYY'));
    
    insert into  Caris_life  (case_name,Test_name,Test_on_Hold_date,test_off_hold_date) values ('B',1,TO_DATE ('02/01/2012','MM/DD/YYYY'),TO_DATE ('02/03/2012','MM/DD/YYYY'));
    
    insert into  Caris_life  (case_name,Test_name,Test_on_Hold_date,test_off_hold_date) values ('B',2,TO_DATE ('02/02/2012','MM/DD/YYYY'),TO_DATE ('02/05/2012','MM/DD/YYYY'));
    
    Insert Into  Caris_Life  (Case_Name,Test_Name,Test_On_Hold_Date,Test_Off_Hold_Date) Values ('B',3,To_Date ('02/03/2012','MM/DD/YYYY'),To_Date ('02/08/2012','MM/DD/YYYY'));
    
    insert into  Caris_life  (case_name,Test_name,Test_on_Hold_date,test_off_hold_date) values ('B',4,TO_DATE ('02/05/2012','MM/DD/YYYY'),TO_DATE ('02/10/2012','MM/DD/YYYY'));
    
    insert into  Caris_life  (case_name,Test_name,Test_on_Hold_date,test_off_hold_date) values ('B',5,TO_DATE ('02/13/2012','MM/DD/YYYY'),TO_DATE ('02/16/2012','MM/DD/YYYY'));
    Published by: vijayp on Sep 14, 2012 22:58

    Published by: vijayp on Sep 14, 2012 23:09

    >
    Thank you very much for the idea, I will work with your query to see why he gives different number.
    >
    I think that I have now. Try this

    with q as (
    select case_name, test_name, test_on_hold_date, test_off_hold_date,
           lag(test_off_hold_date, 1, test_on_hold_date - 1) over (partition by case_name
            order by test_on_hold_date) prior_off_hold_date,
           lead(test_on_hold_date, 1, test_off_hold_date + 1) over (partition by case_name
            order by test_on_hold_date) next_on_hold_date
    from Caris_life
    ),
       p as (
    select q.*,
            case when (test_on_hold_date > prior_off_hold_date) -- if this record starts a new date range
              then test_off_hold_date - test_on_hold_date +1       -- then just subtract the dates
              when (test_off_hold_date > prior_off_hold_date)      -- but if this record overlaps the previous one
                 then test_off_hold_date - prior_off_hold_date        -- then adjust this records off date to only count the new days
            else 0 end days
     from q
    )
    select case_name, sum(days) days_held from p group by case_name
    
    CASE_NAME,DAYS_HELD
    A,14
    B,14
    
  • decode the problem with dates in APEX

    In oracle, I can run this

    Select decode (CBT_DT, to_date (January 1, 2100 ',' DD/MM/YYYY '), null, CBT_DT) CBT_DT
    of DMN_USER_LIST_PORTAL

    and it works.

    but in the APEX, he wants to remove date column and make it a character.
    Help, please
    Thank you
    Doug

    Perhaps rewrite with a CASE statement can help? Or a cast of the explicit NULL value to a date.

    select case
            when cbt_dt = to_date('01/01/2100', 'MM/DD/YYYY') then to_date(NULL)
            else  cbt_dt
            end
    from DMN_USER_LIST_PORTAL 
    
  • accelerate the backup of data received through series

    Hello

    I hope you can give me some advice. So far, I have not found a solution.

    I have a sensor connected by USB-serial converter to the computer (COM 2). After the beginning of the measure, the sensor sends continuously data as a string. The sensor is able to operate at different speeds and it is controlled through strings sent to the device.

    Now, I have programmed a small piece of code to read and evaluate the data from the sensor. There is no problem while looking at live data in several locations. But as soon as I try to save the data, I have speed issues. The loop is not fast enough to receive the data, because it is provided by the sensor. Temporarily remove the plots and so on, don't help not, therefore the problem is data backup. As far as I know, I should use the tables that I did and I don't think that editing bays should be the bottleneck, because they should be able to manage data in general much faster.

    In the Hyperterminal with windows, the unit works fine.

    I use VISA series with a timeout of 2 s and a buffer of 128. Baud rate is set to 460800.
    The real VISA read command is set to read 50 bytes max or stop a tank of termination (line break).
    After initialization, and sending the command start for the sensor, the device starts to send its data...
    The different speeds are:
    1 - 4 strings per second
    2 - 10 per second
    3 - 100 per second
    4 - 500 per second

    Each line gets cut, evaluated and plotted. Each value is also stored in a table (which could be saved after the program stops).

    In the photo, I deleted several commands sent to the probe, because they are not relevant and it doesn't matter (of failure) if I remove them in the program or not. It goes the same for plots. After setting the device at the higher speed, the program fails, because there is more data than labview bed. (I have already said, that without the tables it works very well, I do not have it?).

    So, what can I do? I'm doing something completely stupid? Is there a faster way to collect data with labview? I mean, 500 HZ, which must be nothing.

    Thanks for your help.

    Kind regards

    HD

    PS I'm continues LabVIEW 8.6

    Computer: Intel Core2 Duo E8500 3.16 GHz with 3 GB of RAM

    SW: Windows XP SP3

    You use insert into table with each iteration and forcing LabVIEW to keep reallocation memory for the berries. It is not very effective. Instead, I advise you to use the architecture of producer/consumer and transmit data back to the consumer loop where you write the data. Shift registers and who would skip all the functions to insert it in the table. You also use local variables and property nodes. Neither one of those who are very fast either. Can't tell from the picture why those are used. Also, consider using a structure of the event for these Booleans wired for the structures of the case. Do you really need those who questioned all the time and run the code with each iteration, or do you just need them to run once when the Boolean value changes?

  • Problem strange date range

    I know that this kind of question is covered in other posts, so sorry to repeat, but at the moment I am confused about what I'm doing wrong.

    I am trying to select the 'book' of column for the rows of a table "library" for the date of today (in the format DD - MON) between the line start date and end date. What ends by going on, it is that I get lines where the number of date is between the number of start date and end date. For example, on today, 01 - JUN the order would display rows between 00 - OCT and 30 - DEC (car 01 is between 00 and 30), but not 02-JAN and 30 December (as 01 is not between 02 and 30).

    I don't want to display lines between the dates of arrival and not the number of the day.

    Select 'BOOK '.
    "library".
    where ((select TO_CHAR(SYSDATE, 'DD-MON') FROM DUAL) > = 'LIBRARY'.) ("' STARTING_DATE ') and ((select TO_CHAR(SYSDATE, 'DD-MON') FROM DUAL) < = 'LIBRARY'.) (("" ENDING_DATE '))

    Thanks for any clarification.

    If they are DATE data types, and you want to ignore year try

    select book
      from library
     where sysdate between to_date(to_char(starting_date, 'DD-MON')||'-'||to_char(sysdate, 'YYYY'), 'DD-MON-YYYY')
                       and to_date(to_char(ending_date, 'DD-MON')||'-'||to_char(sysdate, 'YYYY'), 'DD-MON-YYYY')
    

    This example uses the current year YYYY