Change an existing chart

That's what I'm trying to achieve;

1. as the user makes a left click near a Summit (of a graph) (within a radius of 50 pixels), the Summit is selected and a small red cross is to see the position of the top.

2. If there are several peaks near the point clicked by the user, the nearest vertex of the click point is selected.

3. as the user is updating a selected vertex, the graphic display is changed accordingly.

Thanks for your help and your time!

Have a nice day!

Cory K wrote:

Tags: NI Software

Similar Questions

  • How to change an existing report in vFoglight v5 or v6?

    I want to know how to change a relationship by Vizion Core vFoglight 6. We have upgraded the version of the 5-6 Worm worm vFoglight. Could you please provide the steps to modify these reports. Also need to know how to change an existing dashboard?

    you want to change communications canned or reports that you have created? Same question for the dashboards.
    -Larry

  • How can I add white space between areas that contain text fields? I use Adobe Acrobat Pro DC 2015.  I'm trying to change an existing PDF. I need to add white space between areas that contain text fields to allow these text fields to be developed and not

    How can I add white space between areas that contain text fields?

    I use Adobe Acrobat Pro DC 2015.

    I'm trying to change an existing PDF. I need to add white space between areas that contain text fields to allow these areas to be developed and do not overlap the text and the text below fields.

    For example:

    1. 1.

    Progress/strategies:

    1. 2.

    Progress/strategies:

    1. 3.

    Progress/strategies:

    1. 4.

    Progress/strategies:

    The space between each 'progress/strategies' increasing needs. A text field is under each of them. If it's a Word doc, I could just press on enter. What is the best way to do this with Adobe Acrobat Pro DC?

    There is no easy way to do it. You need to move the text fields more apart and if there are static elements, then you will need to use the tool edit text & Images to move them, separately.

  • How to change an existing form

    How to change an existing document?

    Hi johnm45095656,

    You want to change the data met the PDF form or change the structure of the PDF form?

    To change the PDF file form the structure convert existing fillable PDF forms on the screen in Adobe Acrobat DC | Tutorials Adobe Acrobat DC you will need Acrobat free trial download Adobe Acrobat application | Acrobat Pro DC.

    If you just want to change the filled data in the form of PDF you can do using the Reader app, if there is no security or updated signature in place on the PDF form.

    Kind regards

    Nicos

  • How to change the page numbers after adding & save page numbers in the pdf document - need to change the existing page printed on the upper right in the header numbers

    How to change the page numbers after you add and save the page numbers in the pdf document - need to change the existing page printed on the upper right in the header numbers.

    These page numbers were initially created using Acrobat PDF header and footer.

    I have a 750 page pdf document that I've created.

    I have to sometimes the pages up and down after that I added the page numbers in the document by using the Header_Footer tool on the right column of tools.

    But after you save the document, if I get a few pages around, I can't go back and change the page numbers.

    I thought that the page numbers, as indicated in the header and footer must have changed automatically, but I guess that once its print, that it cannot be edited - is that, as what is?

    So I guess we should always first get a copy without numbers of pages before confirming the documents and the creation of an index.

    A way to remove these page numbers already there and add new page numbers.

    Its a lot of work to align 750 court documents and then realize that you must move some and then realize the page numbers cannot be changed and thus begin to do this all over again to compile which can take about 10 hours.

    My question is quite simple, but I hope that overall, I got my point. Sorry if I made it is too complex.

    If no simple way, want to know if anyone has another different tool or a few recommendations to better highlight what I'm doing wrong.

    Thank you for your review and response.

    You should be able to update with tools - Pages - header & foot-

    Update... It not work for you?

    If this isn't the case, then try to remove from this menu and then re - adding them.

    Tuesday, June 23, 2015 23:55, Fortune Mile [email protected]>

  • How can I change my existing cc student and teacher subscription to Photoshop CC offer?

    How can I change my existing cc student and teacher subscription to Photoshop CC offer?

    I've been chatting in line waiting for 6 hours now. and I tried to call without success either.

    I would rather offer Photoshop CC $ 9.99.

    Hi Joseph

    I've cancelled your existing plan if you can sign up for the plan of Photography Photoshop - offer extended until December 8.

    Thank you

    Bev

  • Help! placed grayscale TIFF doesn't let me change his color chart of colors...

    Help! placed grayscale TIFF doesn't let me change his color chart of colors...

    Tried to revive demand, re-boot PC in the case of a technical problem. Something with graphic blocks that must be re-stored I don't know?

    I also tried to create a new page, import another image and persist on the issue.

    How do I "re-adjust" my settings so it does not once again?

    Thank you!

    Here is the information about resetting your Pref.: replace your preferences

    But this probably isn't the problem. Are you sure that the images are really grayscale? What format they are stored in? They may not be colorized to identity card if they are transparent or do not have a background layer.

  • Can I change an existing workspace?

    I just accidentally erased my meticulously clean workspace.

    How can you change/add, in other words. modify an existing workspace that you created?

    You said "change an existing" one so I assumed you had a here already, which is obviously not the case.  You will need to create a new, you can do a quick search on google about backup of your workspaces as well, if you do not receive this problem again.

  • How to make changes to existing configurations without quisceing

    Hi gurus B2B.

    How to make changes to existing configurations without quisceing and deployment of retirement?

    Its a production server, my project went live, a few weeks before. After two weeks my ISP asked me to change the delimiter setting of * to,.
    I then to the deployment, Quisced tab, retired, purge the existing configurations, and then I did the changes, approved the agreement and TP and recreated the (config) deployment even once, it happened successfully, but WE are unable to see the old transactions.

    Could someone help me how to make any changes without purging,

    If we simply pull out, wiothout purge, it shows error that name already exists.

    Concerning
    Suni

    Hi Suni,

    In B2B of Oracle 10g, it is mandatory. You must transfer the configuration (after quisceing and retirement) each time you make any change in the configuration.

    but WE are unable to see the old transactions.

    Once an old configuration gets served, messages related to it would not be included in the report, but they must exist in the DB tables. You can take an export (from the console) to the existing messages each time before you purge the old configuration to keep a backup copy of copy paper.

    If we simply pull out, wiothout purge, it shows error that name already exists.

    Two configurations with the same name cannot co-exist, and whence this error.

    Kind regards
    Anuj

  • change of axis chart xy programmatically

    I would like to know if there is a way to control the name of x and y of the programmatically on a xy chart axis labels. I have a case statement that has 4 different case, and I would like to label the y-axis to change and match case who is chosen. I use Volt, straightened up the volts rms, dBV and dBFS, and I want the y-axis to reflect in which case I do by changing accordingly. The way I want to go about this (if possible) is to remove the title running axis and in each case, I program the correct axis label. (Volts volts, dB to dBFS and so on...)

    Thank you

    Yes, you can use the property of the XY graph node (YScale.NameLabel.Text and XScale.NameLabel.Text).

  • How to change the existing terminals 'view as an icon' to view data by program type

    I had a few LabVIEW code inherited from someone else. And there are tons of existing terminals, displayed as an icon. Is it possible to batch process to change all of display them as data type?

    Thank you very much!

    I created a VI that changes all that.

    Run the VI.  Go to any block diagram you want to disable the view as icons setting.  Then click on the button in this VI.

    I also created a version using the right-click framework, but I don't have access to the computer that has this code at this time.

  • How to change an existing in ASDM VPN tunnel?

    I currently have a VPN tunnel together upwards, but to change some of the configurations as making ikev2, replacing the SHA512 hash and change it in the DH group 14. I intend to do this in ASDM. I already created a group of tunnel ikev2 that I put the tunnel and created a Card Crypto that is configured with the right proposal ikev2 IPSec and Diffie-Hellman group. All other configurations such as the IP of Peer address and subnets configured and I'll work with the engineers at the other end of the tunnel to ensure that configurations are, I want to just make sure I'm not missing anything. Someone at - he never comes to change the configuration of an existing ASDM so tunnel, and it worked correctly? Here are the steps that I have will be taken as well as those I've already mentioned:

    -Edit the connection profile so that the name of group policy use the correct tunnel that was created for ikev2

    -Enter the pre-shared key local and remote pre-shared key ikev2 tab

    -Change the IKE Policy so that it uses the ikev2 policy that was created to use SHA512

    -Modify the IPSEC proposal so that it uses AES256-SHA512

    -THE CRYPTO MAP IS ALREADY CREATED

    -Change the secret of transfer perfect in group 14

    Hello

    Let me go through your questions to clarify this double:

    1. If I have a Crypto map applied to my external interface with a proposal of IPSec of ikev1 can I just add a proposal ikev2 in this Crypto map as well?

    If you have a card encryption applied to different peers outside and 3 with different order number, you will need to replace the proposal for the peer using IKEv2: IKEv2 IKEv1, the others must continue to use their IKEv1 IPSec proposal.

    2. so can I add an ikev2 with AES256 SHA512 hash proposal to my 123.123.123.456 tunnel group and continue to have all three tunnel groups always pass traffic? What happens if I add the proposal ikev2, but REMOVE the ikev1 this group of tunnel proposal because I don't want this group of tunnel use one other than AES256-SHA512 hash?

    123.123.123.456 - ikev2 - AES256-SHA512

    I would like to expand this a little more, if her counterpart 123.123.123.456, must use IKEv2, you need to declare the IKEv2 in the tunnel group and add the relevant "Local and remote PSK"--> is for phase 1, and this means that it will use the IKEv2 defined policy before, and IPSec IKEv2 proposal is on phase 2, where the encryption card is you will need to replace the IKEv1 and use IPSec IKEv2 proposal. That way it will use for the phase 1 of the policy of IKEv2, that you set and defined transformation IKEv2, by making this change make sure that both sides are mirrored with IKEv2 and IPSec policy projects, as well as the tunnel will remain and will come with the new proposals.

    This custom affect no matter what another tunnel, as long as you change the settings to the correct tunnel group and do not delete all the proposals, simply remove the profile connection, those employees.

    3. you know what I mean? All groups of three tunnels on that off interface use different cryptographic cards, with only two of the three using ikev1 as a proposal of IPSec. Which will work?

    You can only have one card encryption applied by interface, and 3 tunnels using different sequence number with the same crypto map name, you cannot 2 tunnels on the same card encryption using IKEV1, and always in the same encryption card have the third tunnel using IKEv2 (different transformation defined using IKEv2). This custom cause no problem. 

    4. what Group Policy DfltGrpPolicy? Currently use all my groups of tunnel, but it is configured for ikev1. I'm not really sure what role is in everything it can so I simply add ikev2?

    Default group policy is added by default to all your groups of tunnel (connection profile), whenever create you one default group policy is inherited him by default, you can change to group policy that you can create, group policy is a set of attributes that will be used to define something or limit , for example, for a site, you can configure a VPN filter (filters the traffic that goes through the tunnel), now back to your topic, you define the protocols that will be negotiated as for an L2L IKEv1 or IKEv2, Anyconnect SSL or IKEv2, on default group policy, and so on, it is therefore important that you add the IKEv2 , so trading will be permitted, or both to create a new group policy and add the IKEv2 Protocol; and in the tunnel group, add the group policy relevant, that you just created.

    I hope that this is precisely, keep me posted!

    Please go to the note, and mark it as correct this post and the previous that it helped you!

    David Castro,

  • vendor name change affects existing playbook applications?

    I would change my name of the app World vendor and I was wondering how it would affect the apps (playbook) existing. For example, when I get a new key of LSB and make a new cert p12 for the new name, I'll be able to sign an update of an application with an existing application ID? Or the signature/app install would fail due to different names/certs? I had problems with the evolution of the certs/names in the Office of the AIR, so I was wondering if the same applied to the playbook. Thank you.

    With a new key, if she has the same name of provider or not, seems to make an app to look like a different application (as others have pointed out a number of times).

    So, if you change the name of your provider requires you to get a new key, the app will appear different.

    If your application involves the application-specific data, I suggest that issue you an update to the old app that allows you to export and make it clear to users who install the new application that they will not have access to their old data until they export it and import it into the new application.

  • Help - profile change Service models and policies without changing the existing MAC or WWN vNIC and vHBAs

    Hello

    I would like to know if there is a way to preserve existing vNIC MACs and WWN vHBA if I change the model of a Service profile?

    To clarify, our Service profiles have been created since an initial model, and now we'd like as these Service profiles to point to a - model - update to simplify management.

    Initial-template originally provided manually created vNIC and vHBAs and used no LAN or SAN connectivity political, but the new updated model made.

    VNIC names and vHBA names, as well as the MAC and WWN used in connectivity pools policies update-model are the same as those currently used by the Service profiles.

    To rephrase the question:
    Is it possible to change initial-model a Service profile to a template update with essentially the same everything, without changing the UUID currently in use MACs of the profile Service, WWN and perhaps?
    If the answer is that they are not the same when this happens, then someone know of any workaround?

    Thanks for your help!

    RR

    Hi RR

    With respect to the Central of the UCS and sequential allocation:

    https://supportforums.Cisco.com/discussion/12006286/UCS-Central-sequenti...

    http://www.Cisco.com/c/en/us/TD/docs/unified_computing/UCS/release/notes...
    New features in version 1.1(2a)
     
    Allocation of ID sequential for pools, such as addresses MAC, WWN, IP and UUID

    The procedure I would use:

    -Create the update model

    -remove the link 1. Initial model EP

    -delete this 1. SP (this helps to release all the values in the pool)

    -create new MS to model update (it will inherit above pool values)

    -Repeat for all AOCS

    I did this several times without problem (for example, no need to change the zoning of FC). Of course it is disruptive, by blade and SP.

    Don't know if this unbind / bind procedure works without reserves.

    See you soon

    Walter.

  • How to change the existing text of a model?

    Hello everyone, Im new to photoshop and I check a lot of things here and there, just wondering how to edit a text from an existing template? I downloaded a model and Im pressing the tool t then Im clicking the text I want to change but he used to Exchange and only adds a new layer of text? Help!

    You click the box bad you clicked outside the T text icon in the box that opens the layer style dialog.  Try to click the T icon in the text to change layer which is found in the layer in the layers palette.

Maybe you are looking for