Hot pluggable modules 7206 VXR?

Modules (such as Fast Ethernet) can be removed or added since a VXR, while it is still powered? Thank you.

Hello

modules/cards for slots (six) of a 7206VXR are hotplugable. However, I'm not sure if this applies to all situations. You should also look, then bandwidth points, different cards consume a number different points and each side (1,3,5 slot or slit 2,4,6) can have the maximum 600 points, as far as I know.

But isn't that the router may restart when you insert a card. That happened once.

HTH

Mark

Tags: Cisco Network

Similar Questions

  • PDB GDP of hot pluggable power supply

    Hello
    We use a Server PowerEdge T420 equipped with a "Single, cable power supply, 550W, code 513871, SKU [450-18382] [450-18478], ID 1620" (Cable Power Supply 550W).
    We recently bought a 'kit - Single, Hot-pluggable, 1100W, article number 450-ADZK PSU.
    Unfortunately we can not use it because we need a 'map of Distribution of power' and 'interposer Board Power'.

    The following links show features:
    https://www.YouTube.com/watch?v=IJlTlDcH45Y
    https://QRL.Dell.com/videos/list/15/internal?region=PDB%20BOARD
    https://QRL.Dell.com/files/en-us/HTML/manuals/T420/removing%20The%20Power%20Interposer%20Board=GUID-E187B9B4-00ED-436C-B67A-477D0F019885=1=en-us=.html

    Can you tell us where we can buy it?
    You can give us?
    Thank you

    Hello

    Contact spare parts to order the parts. 800-357-3355 reference numbers KKY3X and K501P.

  • Question about hot pluggable memory

    Recently, I want to increase the memory of the virtual machine online. How can I check if I have this feature on my product? I could see the function of licensing information.

    Memory Hot - Add requires hardware VM worm. 7, and you must activate add Hot for this virtual machine in the settings.

    Remember that add Hot will not work on Win 2003 standard, you need, Enterprise, DataCenter, or Web Edition.

    ---

    VMware vExpert 2009

    http://blog.vadmin.ru

  • hot or not

    Hello

    We have a Dell MD3000i power vault, I want to add 3 new readers more to it, is the MD3000i hot? or must I turn the unit off?

    Currently, the first half of the unit contains 3 discs should I complete first part with discs or I can add the new drive in the second half which is empty elso?

    Thank you

    Hello mrshahin,

    The MD3000i is hot pluggable you can add more drives to him without it turn off.  You can add the disks on each side.  If you are looking to expand your virtual drive then I suggest that add you them to the team that has the 3 disks.  If you want to create a new virtual disk you can add to each side & create the new virtual disk.

    Please let us know if you have any other questions.

  • Connect hot and cold sealing

    I just wanted to check the terms.

    A USB keyboard with a wire tangled at the back of the computer can be disconnected, sort out and reconnected without shutting down the computer first. USB devices are hot pluggable

    However, in the case of a PS2 Mouse tangle, the computer should be stopped first, then mouse can be plugged, unplugged and unraveled back in, then the computer can be restarted. PS2 devices are cold pluggable

    Should I have it correct?

    Hello

    Or the other of these two can be used. I'll you given scenarios.

    Scenario 1:

    You use your computer for internet, games, or other documents. Then all of a sudden the PS2 Mouse or keyboard has been deleted by someone at the back of your computer. Automatically the function of the mouse or keyboard does not work even your PC is on. If you have plugged their return, the mouse or the keyboard still does not work until you turned off the power and turned it back.

    Scenario 2:

    You move all of your PCs to another location. If your PC is turned off, you can unplug the PS2 Mouse and keyboard just a way. You have connected before you start the computer to the new location. Can you unplugged the keyboard and mouse PS2, while the PC is turned on. The problem is that you cannot close the PC correctly. Only by removing the power cable to the power outlet.

    The rule for connecting cold is, whenever the connection is broken you need to restart them. It allows a device to synchronize.

    Kind regards

    Angelo bar

    Microsoft community

  • Question VPN on Cisco 7206

    Hi Experts,

    We have a VPN configuration between a Cisco 871 router and a Cisco 7206 VXR router.

    The 7206 is a location of the hub and the 871 is one of the rays.

    The 871 uses a DSL connection to connect to the internet.

    Today we receive a large amount of newspapers on the 7206, newspapers are as below-

    14 Dec 17:47:48.326 is: % CRYPTO-4-IKMP_BAD_MESSAGE: IKE message failed the validation test or is incorrect

    14 Dec 17:48:57.078 is: % CRYPTO-4-IKMP_BAD_MESSAGE: IKE message failed the validation test or is incorrect

    14 Dec 17:50:33.191 is: % CRYPTO-4-IKMP_BAD_MESSAGE: IKE message failed the validation test or is incorrect

    14 Dec 17:51:47.383 is: % CRYPTO-4-IKMP_BAD_MESSAGE: IKE message failed the validation test or is incorrect.

    Can someone advise if there may be a problem with the DSL connection or if it means something else.

    Hi Imran

    Looking at the error message, the keys of encryption on both ends do not match. Make sure that the pre-shared keys are configured correctly

    Cordially MJ

  • C7000 Blade Server pregnant (chassis) Power Options

    I am trying to determine if a c7000 blade system enclosure that has been configured as single-phase factory can be converted into three-phase changing the single-phase power supply (413379-B21) on a three-phase supply (413380-B21) which seems to be a plug-in unit.  Thank you, David.

    After obtaining a categorical 'NO' chat online pre-sales HP, I got a definitive 'YES' of after-sales service to Insight.com

    The c7000 can be converted in the field of single phase to the phase or contrary with the power of part of appropriate service module.  I saw the following on different forums, but here it is again to add to the answer I received.

    Annex D: conversion of energy into a case of class c

    Convert a single-phase c7000 Enclosure 3 - Phase Enclosure and a box of 3 phases with a single

    Speaker phase.

    To perform a conversion of the corresponding spare part number must be ordered through spare parts. In North America

    Service spare parts can be ordered through the HP parts store at:

    http://h20141.www2.HP.com/hpparts/default.asp?EE=InvChr

    Local spare parts stores and distributors of spare parts for other regions are

    http://h20141.www2.HP.com/hpparts/country_choice.asp

    Use the table below to order the right spare part to replace the original module.

    Spare part Description plug Type

    L15 - 30 p of phase entry module 3 in America of the North/Japan 413495-001

    413496-001 IEC309 International Input Module 3 phases, red, 5-pole, 16A

    413494-001 single-phase power Module input C19 - C20 power cord

    It is the responsibility of the user to ensure that the correct containers and/or Infrastructure PDUS are

    available before the conversion. For more information on power of cases of class c, please see the

    Class c Site Planning Guide.

    1. turn off the speaker

    2. disconnect all the power on the box cables

    3. remove the plug-in power supply hot from the front of the case

    Note: The input module is difficult to remove if the power supplies are inserted into the case.

    4. unscrew the 3 screws on the module power input at the back of the enclosure

    5. remove input power Module

    6. replace by the new Module of input power

    7. tighten the 3 screws to lock the module in place

    8. replace hot pluggable power supplies

    9. Add pluggable power supplies if necessary extra hot

    Note: 3 phases requires 3 or 6 power supplies to operate, extra feeds should

    be ordered if necessary, the part number is 412138-B21

    10 reconnect the power cables

    11. turn the speaker power

    The user must then connect to the Onboard Administrator via Telnet or SSH and the command connection

    Administrator command-line interface.

    The following command must be performed to define the appropriate input module type.

    Speaker pdu_type the x value

    x = 1 = single-phase

    x = 2 = three-phase in North America/Japan

    x = 3 = three-phase, International

  • Equipment for laboratory practice

    Hello

    I am new to vmware and am enrolled in the vSpere Install & Configure course.  I'm looking to set up a small home convenient to study for the exam lab.  One can tell me if the following server would be enough to set up a small laboratory of loading 3-4 vm servers.  I would not do much with them.  Just install configure and play with some of the vmware tools.  The servers themselves wouldn't have Windows Server or Linux software installed on them.  Nothing major, just something to practice and get used to the vmware tools.

    It is a server that I can pick up cheap.  I realize, he can be timid on the ability of the HD, but I have a lot of additional readers, that I can use to flesh out this part.

    HP Proliant DL560 QUAD P4 XEON MP 3.0Ghz 4 M Cache L3 2U Rack Mount Server - this is a 2U server that holds 4 physical XEON Processors

    QUAD (four physical processors) Intel P4 XEON MP 3.0 Ghz, 4MB L3 Cache processors installed

    ServerWorks Grand Champion chipset - THE

    4 GB (2 x 1 GB, 4 x 512 MB) PC2100 Registered SDRAM with feature Advanced ECC DDR SDRAM ECC

    Smart Array 5i controller more integrated (Ultra3) with 64 MB of total memory on the Module of memory more 5i and BBWC

    2 x (two) Compaq 36.4 GB Ultra3 10 K Hot Swap hard drive RAID 1 configuration installed (max 2 Hot Swap HDs of support)

    Floppy and CD-ROM drive installed

    2 x (two) redundant power 550W Hot Plug

    Integrated management of the Lights - Out Standard (ILO) on the system board

    Two NC7781 PCI - X Gigabit NIC (embedded)

    2 x USB

    Integrated 1280 x 1024, 16 M color on the local bus, PCI, 8 MB of video memory SDRAM

    Two full-length 64-bit/100 MHz Non-Hot Pluggable PCI, a full-length 64-bit/133-MHz Non-chaud ports

    Any idea would be appreciated.

    Thank you.

    Your server should work perfectly, a little less memory, but it should work to test just the things and play arround.

    As you prepare for the VCP that I suggest, you should consider getting a second server like this one, just to have all the features like HA, DRS etc. available.

    If this is not possible, try to use an ESX Server, within a facility of vmware workstation on a fast machine with enough memory and a processor who must take care of Intel-VT

    You should also think about a NAS or best iSCSI device, test vmotion and svmotion. HP Lefthand for ESX demo should do the job very well.

    If you find this or any other answer useful please consider awarding points marking the answer correct or useful

  • Thunderbolt port does not not in Boot Camp 6.0

    Hello! I'm having problems trying to get Windows 10 on Boot Camp 6.0 to recognize my external hard drive LaCie connected via the Thunderbolt port. 10 Windows does not recognize the external hard drive is running Installation of Boot Camp 6.0 had a hiccup, who gave me the following message: "Windows Installer has stopped working", but after clicking wrong, everything went well. Any other problems accessing devices Thunderbolt is recognized by Windows 10?

    1. in what year/model is your Mac?

    2. Please see ports Thunderbolt and views: frequently asked questions (FAQ) - Apple Support, especially this part.

    1. the "hot pluggable" Thunderbolt devices using Windows with Boot Camp?

    Thunderbolt hot plugging is supported under Windows 8 or 8.1 on all Macs from 2014 and later.

    For all other Mac computers, Windows 7, 8 and 8.1 scans and active them Thunderbolt devices connected to ports Thunderbolt during the Windows startup process. If your device has been plugged in not at startup, Windows detects not without a reboot.

  • Hello everyone, I just bought a Thunderbolt Apple display to use with my 2012 15 "27" Macbook Pro, Win10/Bootcamp. Is anyone know the procedure to get the display to work with Bootcamp Windows 10?  I have connected screen but no picture. TY

    Hi all

    I just bought a Thunderbolt Apple display to use with my 2012 15 "27" Macbook Pro Win10/Boot Camp running. Is anyone know the procedure to get the display to work with Bootcamp/Windows 10? Is there a setting in the training Camp that must be turned on to make it work? I have connected screen but could not get a desktop display.  Any help would be really appreciated! TY

    The monitor should have a TB and adapter power connector. The monitor works on both OSX. ? If so, shut down of windows, connect monitor and start Windows. Your TB 2012 monitor is not plug-and-play with Windows.

    Please see ports Thunderbolt and views: frequently asked questions (FAQ) - Apple Support .

    1. the "hot pluggable" Thunderbolt devices using Windows with Boot Camp?

    Thunderbolt hot plugging is supported under Windows 8 or 8.1 on all Macs from 2014 and later.

    For all other Mac computers, Windows 7, 8 and 8.1 scans and active them Thunderbolt devices connected to ports Thunderbolt during the Windows startup process. If your device has been plugged in not at startup, Windows detects not without a reboot.

  • Disabling update the configuration file without stopping the VI

    I would like to perform a function that when the new modules are added in the existing system of the public Service or hot swapping modules autour, the VI can update its configuration file. I don't want the VI to stop we will collect data 24/7.

    I use cFP2220 and two or three modules of different types. I have my work VI and it is fairly straightforward FP read.vi in a time loop. All data are stored in the database using the Labview database tool. My screws are hosted on the local PC, not on the controller. I'm using Labview 8.6.

    I guess I have to get the file configuration (iak), whenever new modules are added, the iak file can be changed (without MAX aperture). In any case, I would have the flexibility to run the VI continuous. I know there is a similar code here: http://zone.ni.com/devzone/cda/epd/p/id/3221and they get the configuration file in the ini file. But I don't know how it's done as I can save only the configuration file as a file iak for FP system.

    Another potential problem associated with that, I guess, is the database format. For now, I use a three column structure, i.e., DateStamp, value and ChannelID. In this case, if I want to add/remove/swap channels, I can just change the ID of the corresponding channel. What happens if I have a horizontal arrangement of the database, namely 10 columns corresponding to 10 sensors, would he be in trouble if I change channels modules?

    Thank you very much.

    There is a way to change the module and programmatically updated the IAK file without stopping the VI.  You will need to change the FP read.vi front right by with the constant e/s FieldPoint.  You will need to use the Open FP, FP create Tag, read FP, and close to the public Service.  The trick to this is that you must pre-create files IAK in MAX first.  The way to do is to set up your cart in a configuration and then find devices to MAX.  Then save the iak.  Then reorganize your bottom of basket to the next setting would have desired, then have MAX find devices and who save in a file different iak.  You will need to do this for each configuration you have.  Then, you need to place the code below when you want to Ministry the configuration file.  I have also included a screenshot of MAX that you can see what the strings are correlated with.

  • Request detailed PSU ridondanti by PowerEdge R310 [CF]

    Buongiorno,

    Friday ho telefonato al vostro supporto tecnico by preventivo UN turned out by 2 alimentatori ridondanti UN nostro server rack.

    The macchina e stata acquistata of erroneamente con alimentatore singolo e by recuperarla ho need di sostituirlo con 2 alimentatori ridondanti.

    Seguito di I have advantage della macchina:

    Dell PowerEdge r310 1U

    Service etiquette: 4P80H5J

    Party facilities: two redundant power plug-in to 400W hot pluggable hot, P/N T130K

    He part number PSU dei mi è stato al telefono dal vostro supporto Bolivia, prima di procedere All avrei pero' need di sapere con tell is nello chassis current della macchina e possibile auswechseln alimentatore singolo da con 350W da redundant i 2 400W.

    Avrei anche di UN preventivo by 6 banchi di RAM need da 4 GB uno sempre per macchina di cui sopra.

    Grazie in pre-empted.

    uongionro, non Può cute I due alimentatori ridondanti pole configurazione dello chassis e e diversa non esistono di conversion kit.

  • Research of H710P of SAS cable

    Is also cable djxf7 used with controller H310 valid for H710P? Used in a T320 built with 8 hot-pluggable HARD drive chassis.

    Hello.

    The DJXF7 part number is a cable double connector compatible with H710P controller for substantive connections in basket 8 HDD.

  • Installing 2nd power C210 M1 - needed downtime?

    I have several servers UCS C210 M1 who have just a diet, I need to install a second.   Will I need to shut down the servers to install the second power supply?

    I found details about installing them here...

    http://www.Cisco.com/en/us/docs/unified_computing/UCS/c/HW/C210M1/install/replace.html

    and see that they're hot, pluggable but it is unclear if the interruptions of service is required to install a second delivery of pwr.  I think that it may be necessary to ensure that the system starts with two power supplies and so knows the configuration.

    Thank you

    Todd

    You need not turn off the server to install the second power supply.

  • Want System Restore to format my backup disk. It's bad.

    Windows 7 Ultimate 64 bit. Windows backup and restore...

    I had a hardware failure on my C: drive.

    I had a backup disk in the machine.

    I installed a new hard drive.

    I put the recovery disk and went to the image of system restore from another location.

    I chose my last system image, and told me that I tried to restore to the backup media. That's news to me. I tried to restore to C: and the backup drive was m: (I have a usb card reader into the system). It would be nice to restore my system, but I couldn't go any further.

    I tried to install Windows 7 from the original media. This facility went well. The machine starts, but all my programs were gone. I ' don't know if I can reinstall the MS office and Adobe products, because they have a limited number of facilities. Not to mentions, it takes a few days to collect all the drivers and Setup etc.

    With the new installation of Windows 7, I tried to restore from a different system image. I found my old image (s) and when I tried to restore, I was told that I was running the disk of should be formatted, and I have to run from the installation disk or recovery disk. I have tired them both, and I got the same error, I had previously.

    I looked in the BIOS and SATA configuration has been set to AHCI. That's what I want, so I can external SATA drives hot pluggable. Just for thorough, I tried to upgrade the BIOS to IDE. It's a step to go. So, everything is back to AHCI.

    Finally and above all, when Windows starts, it is the new system that I installed it, disk management displays my C: driver because roll most of the 1 time and at least once he appeared as drive 0. I'm sure this is drive 0, I unplugged each drive and tested that each player was during the installation with the BIOS. Why change the designation of the pilot?

    Includes any body what happens to hear. It would be nice to recover my system, I save a few days and a lot of begging for authorization codes. But more importantly, I have need to have confidence that I can indeed restore my system when I need to. I did restore on other machines and the recovery rate of file. I think it is my first restoration of the system on Windows 7. The last of them was Vista.

    Help, please.

    Windows 7 installation of imagery is very basic and rather whimsical. If you need good features, then you need to install a third-party product such as Acronis image. One of its limitations is that drive target for the restore process must be at least as large as the original source disk. If it isn't then the restore process will introduce you to it.

    There is no need to go begging for authorization codes. MS Office (and other well-known software) relies on a hardware "signature" when you save it. If the signature is the same as previously (for example due to a change of disc) then you don't have problem. If it is very different (for example because of a new motherboard) then you will need to ring Microsoft and explain the situation.

Maybe you are looking for