How to schedule defragmentation when the next next sched defrag NEVER shows

even if I set the defragmentation schedule, it shows always NEVER at the next scheduled time. How do change you that?

Hello

You did changes to the computer before the show?

Please follow the steps below.

Method 1:

Run the tool from the link below System File Checker.

http://support.Microsoft.com/kb/929833

 

Method 2:

Restore the system to the date and time when the computer was working fine.

http://Windows.Microsoft.com/en-us/Windows-Vista/what-is-system-restore

Tags: Windows

Similar Questions

  • Run the defragmentation at the next startup tool

    My Defragmenter is scheduled by default to defragment my hard drive a week.  Sometimes, my computer is off at the agreed time.  How can I get the defragment to run automatically when the next power?  Thank you.

    The default is to do so.

    In the Control Panel (and select Classic discovered in the left pane) select Administrative Tools then Task Scheduler.

    In the left pane of Task Scheduler, navigate to Task Scheduler (Local) - the - Microsoft - Windows Task Scheduler Library - Defrag.

    In the right hand pane, right click - Properties - ScheduledDefrag tab - tick the task as soon as possible after a regular check is not respected.

  • Is there a list of graphics cards that work perfectly with all the new features of Creative Cloud? I want to update my graphics system and want a model that will be obsolete when the next CC updates the roll autour.

    Is there a list of graphics cards that work perfectly with all the new features of Creative Cloud? I want to update my graphics system and want a model that will be obsolete when the next CC updates the roll autour.

    The "General" cloud requirements are quite low... so you have to ask in the forums of specific program for a special features used by individual programs

    For video editing Premiere Pro, go read it in community: Forum Hardware | Adobe Community

  • How will I know when the synchronization is complete?

    Hello
    Is someone can you please tell me how do I know when the synchronization is complete?

    I paired a device (smart phone Samsung) - it worked good 10 minutes, yet on my phone says sync is complete, but any of the bookmarks do not appear on my computer 'main '.

    Hello.

    It is possible to "Synchronize now" in the version of office when you go to tools > synchronize now
    You can check the timestamp of the last synchronization status in the topic: config page one and find the last sync, and there will be a timestamp it. Firefox Sync troubleshooting and tips for more information.

  • Stolen phone. How can I check when the last time saved my phone to my laptop (without my iphone of course)?

    My iPhone was stolen. How can I check when the last time that I backed up my phone to my laptop without my iPhone?

    Click here and either use iTunes to check or browse to the path of the backup manually.

    (142338)

  • How will I know when the capsules are on?

    Original title: caps Inspiron 1545?

    How will I know when the capsules are on?

    Hey, Vince,.

    Caps lock key are you referring?

    If you look above the keyboard on the right, you will see two fires instead of one.

    In addition, you will type in uppercase when the key is turned on

  • How to print photos when the display screen is white? The image is missing in it.

    How to print photos when the display screen is blank?  It shows only a white screen empty when I select the photo and press on print.

    You click on a film image in the print module? And, I guess you don't have to go to the Print module, right?  Additionally, make sure that you have chosen to make a custom package.  If you chose the custom package you need to drag and drop images and organize them.

  • Restart the scheduled task when the server is restarted

    Hi all

    I have a work planned and executed through Service Center control. Then, the server has a regular job of system which restarts every week.

    I would like to know what is happening with this scheduled task when the server is restarted. I understand that I must again manually lunch at work.

    Anyone know what is the easiest way to automate a task that starts the task OWB?

    Thank you very much in advance for your help.

    Concerning
    Victor.

    Hi Victor,

    I understand that I must again manually lunch at work.

    you don't need lunch again job - OWB.
    Employment in the Oracle database still in State SCHEDULED after restart of the database.
    It is a problem of OWB, she had lost the synchronization status of a task planned with Oracle database

    Kind regards
    Oleg

  • How can I detect when the last container in my stream is full?

    I have a bunch of related containers which I am flowing text through. How can I detect when the text has filled a container? There's an overflowPolicy then I guess it can be detected.

    Hello

    I used this:

    private function IsOverset(textFlow:TextFlow):Boolean

    {

    var zeComposer:IFlowComposer = textFlow.flowComposer;

    var iTextLen:int = textFlow.textLength;

    var iNoController:int = zeComposer.findControllerIndexAtPosition (iTextLen - 1);

    return (iNoController is-1);

    }

    HTH,

    J.

  • When I send someone a document I changed if his crossing of the stuff or by adding arrows, when the customer print, it does not show my changes, I'm going through our prices so visitors cannot see and when the customer print them they can see prices?

    When I send someone a document I changed if his crossing of the stuff or by adding arrows, when the customer print, it does not show my changes, I'm going through our prices so visitors cannot see and when the customer print them they can see prices?

    You probably use drawing markup tools. There are options to print with or without annotations. You can not change this.

    If you don't want them to see the prices, either remove the original document and recreate the pdf without them there or you can use the redaction tools in the full paid for version of Adobe Acrobat Pro.

  • PDF possessing blocks to fill in dates, how do you get in the next box?

    I have a pdf form that has separate blocks to enter the date. How do the next block?  I can type in the first, but it won't let me tab or click on the next block.

    The field type you describe is called a "Comb" field Prior to version 6, there was no option for the field that could take the entire string of data at once and then display them with each character in a box.

    Have you tried to enter the entire field data as a single string?

    Would it be possible that the designer does not properly create the form field.

    Can you provide a link to a sample of the form you are trying to fill?

  • Is Adobe CC 2015 for MAC, the latest version? When the next version comes out?

    I work on imagery for the next school year 2016-2017, is 2015 CC Adobe for MAC on MAC OSX 10.11.4 El Capitan, the latest version? Or Adobe releases a newer version soon?

    CC 2015 is the current version.

    Unfortunately I have no further information to share on future versions, but no further announcements have been made.

  • Access Restrictions - is when the next version

    Is there a way to restrict access to the virtual device... a firewall or something so that not only everyone on the network can access the http page via a browser? Be nice to be able to lock more.

    There is a new version of this camera anytime soon? What time of updates will be at it on this version?

    Be nice to have the server names and the connection credentials do NOT attempt to back up automatically so that the next person accessing it does not use someone elses credentials.

    Agreed.  The caching of credentials will be configurable in the next version.  Regarding the restriction of access which would have to happen in your internal network, since the device has no notion of users, it uses just your credentials to talk to vCenter.

  • How do you know when the 2 magic mouse battery is charged?

    Just read this but its detail without recharging the battery in your Apple accessory

    Open BT preferences. Click on the box below to display the menu bar item. When you select the item of menu bar for BT, it will display the devices in bold. Move the mouse over the entrance of MM2. It displays a small box in which the charge level is displayed.

    If you leave the mouse connected to the cable to charge from one day to the next, then the mouse will be fully charged at the time where use you it the next day. That's what I usually do because you can not use the mouse while it loads.

  • pavillion17: How do I know when the laptop was made

    I was wondering if the laptop that I just bought is a current model or a THST was manufactored earlier and maybe technologically as along a life. You know say manufactored a few years but not til now so its new, but perhaps not as common, sold as an act of that year and sold now no matter how to kn where and when it has been implemented

    Hello:

    As far as I know, all portable HP are assembled in China.

    The serial number will provide the year and week of manufacture...

    For the serial number, the classic format is to have the 4th, 5th and 6th characters of reference when the product was built.  The fourth character is the date of the year (Y) and the following two (WW), the week this year, it has been made.

    CCSYWWZZZZ

Maybe you are looking for