OTL integration to Oracle projects

It is with regard to integration OTL
Card is entered in the OTL, interfaced to the projects
Now in the projects so I make settings on the score card after its become an item, this change will be reflected to OTL?
What happens to the approved score card, it is re-opened and must be re-approved?

Please answer...

Thanks in advance.

Hello

Once the time card if imported successfully to PA, any changes made to the expenditure_item_id/Trans Id won't reflect of OTL.

OTL card also requires re-approval if changes made to the time card in OTL resp.

Thank you!

Tags: Oracle Applications

Similar Questions

  • Integrate Oracle projects with Microsoft projects

    Nobody knows - how ' - WBS - taking Microsoft Project 2013 at the Oracle 12.1.3 project)

    I went through a few documents - but I couldn't able to find/download "integrative project.

    If someone has appropriate measures and links, well want to share

    Thank you

    There is no default integration by oracle apps

    integration between Oracle Apps & Microsoft project is out of the box featur

  • Oracle project contracts

    I want to know about Oracle project contracts - which in fact does.
    In the Oracle 120okeug & 120okeig documents, it is written that the characteristics of the Oracle project contract are:

    • Creation of all types of contract documents.
    • Contract administration focused on the workflow, including the control of the State, hold and change management.
    • Global contract Finance.
    • Monitoring of deliverables, integrated with ERP functions such as planning, production and purchasing.
    • Recognition of the costs, billing and contract income.
    • Role-based access security.
    • Contract flowdown.

    But in these documents, it is not given details on the above points.
    Also, I would like to know if we can scan and attach all related documents projects in Oracle project contracts for each project as a system of electronic document management.

    Concerning
    Hawker

    Hello

    The project contract is the agreement between you and your customers. When you enter a new contract, you need to connect to an existing project, you have whole eralier upward in Oracle projects. You would see on the homepage of the contract header. Note, the system allows you to enter several different contracts for the same project. So, it is nto always a relationship between a contract and a project.

    The region on the left allow you to search contracts that you already entered in the system. You can consult the contracts of groups, organization, product and program. The system adds a new contract at the appropriate grouping based on the program, have the Organization and the program that you have assigned to the contract, on the homepage of the contract header. Groups are defined in a separate form, where you can assign individual contracts to groups based on your logic trade won. Personal shortcuts allow the user to enter their own search criteria and save it, so in the futute, find contracts that respond to this logic.

    Point master Org is the name of an organization of inventory, which is considered to be the master of your company. The main organization is the Organization of the inventory where you can configure and enter their attributes, which will be shared by other organizations of the inventory in the society. In this organization, you can configure the list of purchable items, items that can be inventorized or items that you build in your business. Later when you go and author of contract lines, you can enter the item that should be delivered to the customer or purchased from a vendor.

    Oracle project contracts, you can bind the attachments to a contract. You can configure different types of attachments. Each pdf file that has been analyzed can be loaded as an attachment. You can assign the name of the document and its category.

    Dina

  • CRM integrated with MS Project Management

    Hi Expert,

    On the CRM integrated with MS Project Management, there any company always do this?

    In fact, there are only certain configurations or it's really complicated customization?

    The result of the integration is really effective and efficient?

    Can share with me the practice of MS Project to the planning of resources management?

    Thank you!

    Hello

    The question you posted would be bettersuited in the TechNet Forums. I would recommend posting your query in the TechNetForums for more assistance:

    http://social.technet.Microsoft.com/forums/da-DK/projectserver2010general/threads

  • What process can be used to transfer the Bill of costs to the Oracle projects?

    Hello

    What process should I use to transfer the charge for invoice (AP) Oracle projects?

    Thank you

    Veronica

    Check the PRC: Interface Provider costs

    Kind regards

    CV

  • WebCenter content can be integrated with Oracle iStore or Oracle EBS?

    Hello

    WebCenter content can be integrated with Oracle iStore (as seeds/integration without many glitches/modification) or Oracle EBS as a whole?

    Thanks in advance.

    Srinivas

    Hi Srinivas,

    Yes, ECM can be integrated with Oracle EBS (suite business enterprise) and thus other Oracle applications such as Peoplesoft, Siebel etc..

    Details can be read from the following link: http://docs.oracle.com/cd/E23943_01/doc.1111/e17953/toc.htm

    Thank you
    Srinath

  • Activate the integration of Analytics project with financial topics

    Guys, I know there are a few of us out there who is, or did the implementation of PA with Oracle Finance.

    I went through the docs and found how measures for "you can enable Oracle financial analytics for EBS use the dimension tables in Oracle project analytics.»

    Please find below the link to the documentation
    http://download.Oracle.com/docs/CD/E14223_01/BIA.796/e14216/anyimp_configfinance.htm#CHDCCCAJ

    However, I don't see this option for the domain "Finance - Accounting. I find myself manually by adding the option "Activate the Dimensions of project" by click on the < Add / Remove > option of the Configuration Tags tab under the theme "Finance - Accounting.

    Can anyone confirm that they faced the same "problem"? What actions did take? I have in the past executed charges without make this selection for all Oracle finance, and he always seemed to make the connection between the Oracle Finance and PA.

    Your help is greatly appreciated.

    Kind regards

    Made general don't have no connection to the dimensions of the project, that is to say there is no analysis of the dimensions of the project GL data. This is why you don't see in the GL subject area. If you added it yourself and lit, it has probably no effect.

  • Short project Integrator Sanbox Oracle

    Hi all

    I joined short Oracle with EBS. The reference document is

    I am not able to see the applications in the studio short page. I get the below error

    A data source error has occurred.

    There was an error when you try to access the data source. Please check with your system administrator that the data source is available.

    Cannot run the EQL query that generates the data for the chart. Check the log of the applications for more information, or contact a system administrator.

    An error occurred during the attempt to apply security filters


    These projects are clover ETL server projects (Sanboxes). How to open projects of short Integrator Sanbox?

    The execution of these projects and how to amend the Sanbox?

    Guide me as soon as POSSIBLE.

    Thanks in advance.

    ETL Integrator, you can create a "project of CloverETL Server" allows you to connect to a pile of sand on the CloverETL server. For more information on how to do this, see Chapter 8 of the "Integrator ETL Designer Guide":

    http://docs.Oracle.com/CD/E40520_01/Integrator.311/IntegratorDesignerGuide.PDF

    For sandboxes, see the "Integrator ETL Server" Guide:

    http://docs.Oracle.com/CD/E40520_01/Integrator.311/IntegratorServerGuide.PDF

  • Oracle projects, integration POand INV? need help

    Dear all gurus, project

    We all Oracle, inventory, purchase orders and modules of calculation of the costs of the project being implemented.

    The issue is

    We want to place a Standard purchase order with details of the job/project for the
    inventorisable/storable points. So that canbe inventoirsed i.e received/inspected/pronounced elements.

    The system allows to make.

    So I would like to know,

    Whence it gets validated that only the destination type in IN. is as an expense, the Details tab of project and tasks is enabled.


    Appreciate any solution Guru


    Thanks in advance
    Shameer

    Hello

    You can create requisitions and purchase order with distributions of project only if the destination type is cool.
    With this type of destination, you can order services and goods, where the goods could be any type of question.
    With costs of destination type, you can receive the item to the receive location, send for inspection and then deliver it to the applicant. You can't put it back to a subinventory in an organization of inventory.

    If you enable making for any organization of the inventory project, you could cretae requisitions and purchase orders with distributions of project using the destination type inventory. In this case, the project must be pre assigned to the Organization of the PJM. Then, you can receive items in the Organization of the inventory and keep them in storage for how long you need. The items are kept in the inventory within project Locator.

    Dina

  • Microsoft and Oracle project

    Hello

    What is the function satisfied in the Planner Oracle beat Microsoft project, other than integration with financial module?

    Hello

    Microsoft Project is a very good planning and scheduling tool.
    He has noted to provide about costs, billing, integration with OTL, inventory, purchases, AP, AR, GL, etc..
    Oracle EBS projects limited planning functionality and without ability to shceduling.

    Dina

  • Integration of Oracle trade with a PIM

    Hello

    does anyone have experience with the integration of the trade Oracle (ATG, short, WCS) with a PIM?

    Could someone share some information about this?

    Thank you and best regards,

    Heiko

    We had similar requirements. That's what we did:

    (1) PIM lets send import us file.

    (2) on the basis of the annex, we used to read this file and import it into the database of the atg. We used to compare to create a new element and update an existing item.

    Thank you

    Nitin

  • Approval of the Oracle project


    Hi all

    I need like this and help me how to achieve this requirement for needs of the company

    Requirement:

    ------------------------------

    "If someone creates a project in Oracle Apps project accounting, the project gets approved on its own.

    Company want to use oracle standard workflow that sends the draft to the immediate supervisor of the owner for approval. »

    (1) what are the requirements for this type of requirement?

    (2) what is the workflow that is triggered when the project is created and how to get approval for the project?

    (3) what is the exact workflow which approves this project?

    Thank you

    @P

    Hello

    (1) > configuration > system > status. Find the statues of project and implement your workflow for each position you wish to control.

    (2) project status Change Workflow, project workflow Extension is also called.

    (3) PAPROJWF.wft

    Thank you

    Gene

  • Integration between Oracle apps R12 and the MySQL server.

    Hello

    We got a requirement to integrate between the oracle database and the MySQL server.

    Payroll run in the Oracle Apps R12 and the need to develop an API to insert data of payroll results in MySQL database tables, it will be for 4.5 months as finance Modules of Apps will also apply for them, so that MySQL will be totally replaced by Oracle.

    Please suggest how to start integration, as it's my first time.

    I went through a document online, but it says 'updates, removal or insertion may fail' using the gateway dg4odbc, need to use 'different gateway called DG4MSQL, which requires the purchase of new licenses.'

    Thank you very much in advance.

    Kind regards

    Afzal.

    Afzal,

    As mentioned in your message, you must use DG4MSQL which requires the purchase of a new license.

    How to set up DG4MSQL (Oracle to MS SQL Server database entry door) 64-bit Unix OS (Linux, Solaris, AIX, HP - UX) post installation (Doc ID 562509.1)

    How to set up DG4MSQL (MS SQL Server database gateway) on a 64-bit Windows post install (Doc ID 1086365.1)

    How to troubleshoot common errors encountered when using the gateways of the database (DG4IFMX, Dg4MSQL, DG4SYBS), DG4ODBC or generic connectivity (Doc ID 234517.1)

    How to set up DG4MSQL (gateway to Oracle to MS SQL Server database) exit 11 on Linux x 86 32-bit post installation (Doc ID 437374.1)

    Thank you

    Hussein

  • integration of oracle ADF forms

    Hi all
    I've developed a sample form using the generator of forms of oracle 10g, I want to integrate it into the ADF
    can someone give me the process of integration of the forms to the ADF.
    I want the screen sort of the whole process.

    Please answer...

    http://www.commit-consulting.com/oraformsfaces/

    François

  • Integration of Oracle Apex with EBS R12.1.1

    Dear all,

    We are in the process of integration Oracle Apex 4.0.2 with EBS R12.1.1 with the help of http://www.oracle.com/technetwork/developer-tools/apex/apex-ebs-wp-cabot-consulting-169064.pdf.

    After doing all the steps, the time where we sail of EBS to Apex application clicking on EBS links menu it ends with error below

    "404 not found".

    ' / OA_HTML/null/pls/apex/f resource not found on this server.

    After some tests, I found the code below in "LaunchApex.jsp" in order to get the value of profile (supposed to be "http://myserver:port") of custom system 'APEX_HTTP_SERVER' profile and prefacing of ' / apex/f? ' p = applicationid:page:APPS: ' does not work correctly

    "
    ...

    String l_launcher = ctx.getProfileStore () .getProfile ("APEX_HTTP_SERVER");
    l_launcher = l_launcher + "/ apex/f? p ="+ p_application +": "+ p_page;
    l_launcher = l_launcher + ': APPS: "+ p_item_names +": "+ p_item_values;

    ...

    "

    as we found that the profile custom system 'APEX_HTTP_SERVER' does not exist in the EBS system. But it works without any error page if we encode the URL of the entire application variable in l_launcher apex, but this hard brings us to the page of connection of EBS instead of the Apex application page.

    So I think that we can't work around by using the value of 'APEX_HTTP_SERVER' profile because it has something to do with the EBS application session.

    So could someone please help me how we could create custom profile system "APEX_HTTP_SERVER" or other options to make the transparent integration of apex Oracle with EBS works without any second login page

    Thanks in advance

    Published by: 805196 on August 25, 2011 12:23 AM

    Hi oar,

    you will need to change as the below in the jsp

    String l_launcher = ctx.getProfileStore().getProfile("OAE_LAUNCHER");
    l_launcher = l_launcher + "/apex/f?p=" + p_application + ":" + p_page;
    l_launcher = l_launcher + "::APPS:::" + p_item_names + ":" + p_item_values;
    

    Brgds,
    Mini

    --------------------
    Mark responds promptly

Maybe you are looking for