switch with debounce

Hello world

I need to make a transition, which does the following when you click:

1 - Turn on

2. wait 60 ms

3. cut

I'm new to labview for what it is would be useful.

Thank you

Use a Boolean value control with mechanical action "switch when press" and a local variable (reset) in the case of the structure of the event time-out.

Tags: NI Software

Similar Questions

  • My Ipad air2 does not start.  Tried hold it together switch with on/off switch.  Apple logo appears for about 15 seconds and then turns off again.

    My Ipad air2 does not start.  Tried hold it together switch with on/off switch.  Apple logo appears for about 15 seconds and then turns off again.

    Is there another way to start the IPAD?

    Try the steps here:

    https://support.Apple.com/en-us/HT201412

  • VMware Distributed Switch with VLAN

    Hi again,

    A lot of work with VLAN now.

    But just a quick Questions. Is there a documentation or HowTo Guides how to set up vSphare VMware Distributed Switch with several VLANS on a Switch GS724Tv4?

    But soon, I try to add a host or network, it is empty.

    This is probably an easy problem of VMware, but I try here first to see if someone has document guide HowTo so I can start with.

    Thank you

    Christian

    Never mind about this,

    I found the problem on my own, but perhaps a documentation would be great to have. But it's a good start to have the right license of VMware, before you start.

    * I was just out of luck when I thought *.

    / Christian

  • Configure BEFSR41 V.2.1. to use as switch with ADSL ZTE Modem in Bridged mode

    I found a thread of 2009 who has a link that could help me with this configuration, but the link does not work.

    I have a Linksys BEFSR41 V.2.1 and need to set it up, so I can use it as a switch with our ZTE 831 ADSL Modem, which is in bridged Mode.

    The IP address of the BEFSR41 changed to avoid a conflict with the address IP of Modem ZTE ADSL, which is 192.168.1.1 to 192.168.2.1.

    If the PC is connected directly to the ZTE ADSL Modem, I can access the Internet and I can access the Menu of Configuration of Modem ZTE.

    If the PC is directly connected to the Linksys BEFSR41, I can access the Menu of Configuration Linksys.

    If the PC is connected to the Linksys BEFSR41, and which is connected to the ZTE ADSL Modem, I can't access the Internet, and I cannot Ping the ZTE ADSL Modem.

    Please give me a URL that indicates how the Linksys BEFSR41 should be configured to use as a switch with my ADSL Modem from ZTE in bridged Mode.

    My belief is that after I have the Linksys set up, I then plug the ZTE ADSL modem in the Linksys unit and use it to DHCP.

    DRM for your time and help! Lanny

    1. I never told of any change on the Advanced Routing page.

    2 do not connect the internet port for ZTE with this kind of configuration. You cannot use the internet port.

    3. Once you set that you can use the remaining LAN for ethernet devices ports in your local network.

  • What are the bare minimum commands to get a stack of PC6825 3 - switch with inter switch Link Aggregation?

    I am brand new to PowerConnect switches, even though I am familiar with the concepts of VLANS, aggregation of links and spanning tree.

    I am on a deadline to get some new ones installed 6248 in our baskets and get them functioning as a stack. What are the bare minimum commands for:

    • Three switches in a stack (master/Eve/member)
    • 2 ports grouped between each (total redundancy) switch with loops WITHOUT switching

    All the switches are running firmware v3.3.9.1 (January 2014).

    Thank you

    The range of interface Ethernet 1/g1-1 / g2 allows you to select the ports you want in the channel of the port. Page 293

    Channel-group 1 Auto mode to create 440 lacp lag page

    Select the Group of channels with interface port-channel 1

    Switchport page 601 in trunk mode

    Switchport trunk allowed vlan [VLAN you use]

    http://FTP.Dell.com/manuals/all-products/esuprt_ser_stor_net/esuprt_powerconnect/PowerConnect-6248_Reference%20Guide_en-us.PDF

  • Operating a SG200-08 switch with case removed.

    I'll put a SG200-08 (8 port switch) within a 2U rack mount chassis.

    To improve cooling I thought I'd take off the outer case.

    Is there or are there problems with the help of the switch with the cover removed?

    Thank you

    Glen

    Hi Glen, the first question would be, the warranty is voided and you are not entitled to any help. The second question is static electricity and environmental concerns. The third question would probably be your property insurance.

    He is strongly against the recommendation to alter or change these units.

    -Tom
    Please mark replied messages useful

  • Are there plans for the new ESW 500 models switch with PoE capability?

    I know that current models of ESW 500 switch don't have enough capacity to power all the switchports to 15.4, even if the ESW-540-8 p model has almost enough capacity to power all the switchports to 15.4.

    Reasons why new ESW 500 switch with PoE capacity are necessary:

    • The existing PoE 500 ESW switches have not always enough when these devices are deployed with the UC500:

      • 7945, 7965 and 797 x phones
      • series phones (not yet supported with the SBCS solution) 9900 and 8900
      • PVC2300 Surveillance Cameras
      • AP541N access points
    • The UC560 comes with all the PoE ports and requires at least an ESW switch be deployed
    • Version 48 ports gigabit switch ESW is currently available only in the version not PoE, and we need a version of 48 gigabit ports for users of the UC560 solution.

    Existing ESW 500 switch PoE capabilities are:

    • ESW-520-8 P: 60W
    • ESW-540-8 P: 120W
    • ESW-520-24 P: 180W
    • ESW-540-48P: 380W
    • ESW-540-24 P: 280W

    PoE of ESW 500 switch capabilities supporting 15.4 full power on all PoE PoE ports are:

    • 8 port: 123.2W
    • 24 port: 369.6W
    • 48 port: 739.2W

    Are there plans to release the new ESW 500 switch models increased capacity, enough to supply the full 15.4 to all PoE ports with PoE?

    Hi John - Thank you for your participation in the small community of business support. I talked to our switch product manager and want to share his response.

    / * Style definitions * / table. MsoNormalTable {mso-style-name: "Table Normal" "; mso-knew-rowband-size: 0; mso-knew-colband-size: 0; mso-style - noshow:yes; mso-style-priority: 99; mso-style - qformat:yes; mso-style-parent:" ";" mso-padding-alt: 0 to 5.4pt 0 to 5.4pt; mso-para-margin: 0; mso-para-margin-bottom: .0001pt; mso-pagination: widow-orphan; do-size: 10.0pt; do-family: "Times New Roman", "serif" ;} "}

    We have taken the conscious decision to deliver PoE as ESW and other switches for small businesses for several reasons:

    • Endpoints PoE more attract a lot less than the 15.4 W maximum power. Most IP phones are below the range of 7W.
    • A typical deployment would most PoE devices connect to a switch.
    • For these reasons, the ESW is not burdened cost with the PoE feature which would not be used most of the time.
    • All ports are still able to PoE you can connect up to 24 devices PoE Switch 24 ports to any point in time, as long as the handset is in the title of the budget.
    • Therefore, given that these products are intended for small business and the price is an important factor, we opted for this approach.

    We do not have a product at full power on all ports in the Cisco Small Business portfolio, except in the arena of 8 channels. Within Cisco, Cisco Catalyst products support this today.

    Thanks again for the question,

    Stephanie Reaves

    Cisco Small Business

  • / close the switch with the media player 12 on windows 7 32-bit o/s

    I try to use the /close switch with media player 12 on windows 7 32-bit o/s, the media player opens and plays the file but does not close after the reading of the file.

    I expect that the /close should work when used in conjunctino with the /play after reading the site--> http://support.microsoft.com/KB/241422

    Some commands I tried:

    Start/min Mplayer2.exe /play/c:\alert.wav nearby

    Start/min /play/c:\alert.wav nearby wmplayer.exe

    This same exact command is currently working on Windows XP. Appreciate any help on this.

    Thank you

    Kalyan

    Hi Kalyan,

    The question you posted would be better suited in the TechNet Forums. I would recommend posting your query in the TechNet Forums.

    TechNet Forum

    http://social.technet.Microsoft.com/forums/en/iTCG/threads/

    I hope this helps.

  • Virtual switch with virtual bases DMZ

    Hi all

    trying to wrap my hands around it.  Sure you can have an ESXi installation without creating a virtual switch OK?  I have a scenario where they have 3 all current hosts to run ESXi 5.x.  It have a physical NIC card which is plugged in the demilitarized zone on the firewall and another NETWORK card inside network.  They want to get up some virtual machines in the DMZ.  I was under the impression that if dididn can't you have a virtual switch with a virtual DMZ then it would be a security risk.  Is the separate physical NIC enough?

    Thanks in advance!

    It doesn't matter what you need a virtual switch in order to have something to connect to the VM too.  If you like inside the network and a DMZ network then you can set up a separate virtual switch for each NETWORK card, that way you have separation virtual switch and physical NIC.  This way VM is placed only on the demilitarized zone would only speak and other DMZ VM inside VM is placed on the virtual switch inside would only speak to those.  Because of the way virtualization works it should be not to mention and the operating system is not between the two.  Now if that's enough, it's your security staff.  Some COMPUTER security requires a complete physical separation of workloads DMZ, some require only virtual separation.

  • How to create a button switches with Automator

    Greetings,

    I want to create an executable if/then script Automator or Apple Scripts. I have minimal experience with Apple Scripts, so I don't know if this is even possible. The script to check if a particular folder has no content and depending on the outcome, I need to run one of the two Automator scripts that I created.

    If possible, I'd like to have a toggle instead, simply switch off between my two Automator scripts.

    Any help is very appreciated.

    Here are the basic flow to test whether a specified folder is empty or not. He calls automator once with the appropriate workflow.

    property folder_to_check: ((path to the Office) as text) & "Test:" as alias

    property workflow_for_items: ((path to the folder) as text) & "folder_has_items.workflow".

    property workflow_for_noitems: ((path to the folder) as text) & "folder_has_noitems.workflow".

    game of qtdworkflow to «»

    say application 'Finder '.

    if elements of folder_to_check is {} then

    form of city of the trajectory of the value qtdworkflow to POSIX workflow_for_noitems

    on the other

    form of city of the trajectory of the value qtdworkflow to POSIX workflow_for_items

    end if

    end say

    qtdworkflow & worth theResult for shell script "automator."

    return

  • Low cost intelligent or managed switch with the console interface

    Could someone recommend more low switch cost smart or managed with the interface of the console?

    I only need 4 ports but need to control CLI, telnet, or SSH.

    no downtime

  • How to read the status of User1 DIP-switch with a cRIO FPGA chassis?

    How to read the State of the DIP switches on a FPGA cRio chassis?

    I work with a cRIO 9022... My idea is to put the system in "service" mode with USER1 switch to IT and communicate with the FPGA via the FPGA - GUI (VI) on the host computer instead via the RT module that is used in normal conditions.

    Any ideas? Unfortunately, I don't have an unused channel on the left... .and (as I know) cannot use the interface RS232 of FPGA.

    Many thanks in advance,

    Luke

    Hi, this is the correct information. You cannot read the FPGA of DIP-switch status. The only thing you could do is to use the function of Reading Switch.vi located under the range of functions-> real-> utilities RT time

    It's how you probably know side host RT and not the FPGA.

    Cordially Virginia

  • Turn it on and an Opto SWITCH with USB-6525

    The attached photo, a composition of a circuit consists of: Mitsubishi PLC FX series, USB-6525 and OPTO Switch (PNP OTBVP6). In the code, I put under tension of the OPTO then cutting the voltage; power on/off, using the USB-6525.

    My problem comes when that at some time in my code, the OPTOMETRISTS remain without electricity (immediately after programmatically, I just

    They shall ensure with outputs USB-6525 high level). I already checked the code, in my opinion its seems fine. I have in mind the 6525 isn't a fast DI / DO peripheral, that's why I use delays above 200ms.

    The last hope is to change the USB6525 for a brand new, it's what I'll do. But if anyone see a problem with the code or has another explanation why the OPTO not to receive or be (somehow) not powered, I'll really appreciate your help.

    I also enclose the .VI

    I really need help.

    Thanks to all in advance.

    I found what was going on. Connectios, common, everything was fine. In the code, between the States (I use a state machine structure) missed me a delay of 200ms. This because I change the outputs to reading entries, so between them missed me a delay, that's all. in any case, thanks for your help!

  • Button as a switch with logic gates.

    Hello, I am a student using LabVIEW 2012 as a FRC competitor, and I have a question/request to anyone who wants to.

    I can't find a non-buggy solution to get a button to work exactly like a switch. Either the solution train, or doesn't connect.

    I tried D type Flip Flop of all kinds, and! Q can not connect to D in LabVIEW (LabVIEW pulls the errors of "more than one data source", so a lot of logic functions that is available with other solutions, do not work on LabVIEW)

    NAND gate-types have been so tried, no dice.

    So if someone would like to help me, that's what I'm looking for:

    When the button is clicked, it sends a real constant function until the button is clicked again.

    -I can't use anything that messes with functions if the button is pressed.

    -J' I just need a simple on/off switch, nothing that goes 'around' from what currently exists and actually a buggy solution. It should be a kind of good way to do it.

    -An attachment of a VI would be nice, and what goes where.

    Thank you


  • Timed Boolean switches with case structure

    I'm trying to implement a control for a switch that, when enabled, a signal of 'essential' lights up for 2 seconds and then turns off, as soon as the essential signal sat for two seconds that the VI should send say that the switch is turned on.  I can't get it work the way I want to. I think it might be a way to do it with a machine to States, but I don't know much about them.

    Hello

    I changed your Boolean lock so it will break again in the off position.  This stops the VI into the case again and again until turns off.  Then I added two registers to hold the values of the indicator to shift.

    I guess that my bias is that you would like to continue to operate in the while loop, which goes back to the case of 'OFF '.   If expand you this to a state machine, you might have several cases, shift registers would provide the 'flag' access status to other cases.

    It is a single method, it fits your application.  How would you install it in a larger design?

    Copy the snippet on the desktop, drag on the VI.

    Did you want the keyturn to turn on for two seconds and then have the activated LED light?   If so, you have to move the location of the indicator in the target time while loop, this will in turn while the target time loop times two seconds.