That need GG to reproduce the sequence

Hi all

We have sequences that create values used for the primary key. We are on the process of creation of replication between Oracle databases.

I was going through the documentation, it contains some steps which is mainly for the initial loading of data. (Installation of Support for Oracle in Oracle Installation and Configuration Guide 12.1.2 sequences)

My question is that I have to follow these steps for change also online synchronization? Or we can jump?

Thank you

Basu

Hi Ben,

Oracle GoldenGate supports replication of the Oracle sequences. But we must be aware of some issues, replication of sequences are supported by.

1. change Data Capture (CDC) - synchronization of change online.

2. the batch where the control points are not maintained.

But it is not supported for the bottom.,.

1. the first charges.

2. When you configure two-way replication (bidirectional).

That's why in the Oracle documentation, it was referred to as.,

To support Oracle sequences, you must install some procedures database.

These procedures supports the command FLUSH SEQUENCE of Oracle GoldenGate

which issue you immediately after you start the Oracle GoldenGate dealt for the first time

(usually when you perform the initial data synchronization process).

Kind regards

Veera

Tags: Business Intelligence

Similar Questions

  • A way to show items that are not used in the sequence

    Hello world

    is there a way to display items that are not used in the sequence.

    in order not to forget the "rushes" in the Assembly?

    my best,

    Turn on the use Audio and video columns in the sandbox and then sort by those.

  • Simply export the clip that I'm on in the sequence

    Let's just make a change to an item in the sequence (an effect or other) and I want to limit my export just in this area.  When I say "clip" is not a clip I have in my project window - this is a clip that I've created breaks in the sequence.  So, of course, terribly I do scroll horizontally in both directions until I have have set the bar of workspace for the beginning and the end of my video but I really want to do is to be able to find a quick shortcut that would do exactly that - so as I can simply export this clip.  I think that this should be a common thing and so incredibly simple to do in the body but, uh... No. And of course I'm not finding a way to limit the export of just the clip in the Media Encoder...

    I can right-click on the workspace toolbar and the Clip of Mark but made a clip marked for me?  I'm sure that you see is not a way to export from there.  All I get is a selected area (shaded) on the indications of time above and by clicking right there not has even made a right click menu I get out on the workspace toolbar.

    Frankly, the weaknesses of the ease of use like this is what slowed body in the past (IMO) and the great features are nice, but Apple has always had a better intuition to make their software for use.  in any case, did not yell.

    So, am I missing a quick way to do this export?  Thank you.

    Yes, you can copy/paste many clips at the same time, but you still add that the effects of each individual item.  This isn't like a layer of setting in After Effects, with an effect instance.  If you change any instance of this effect on a clip, you then need to change for all others.

    Now that I understand the goal here, the best way to go about it might be to copy/paste the clips in question to a new sequence.  (Or nest the original in a new sequence and trim to include only the desired clips).  This limits your export to the desired range and using the second method, in fact allows a single instance of the effect.

  • additional assistance that cannot be resolved with the sequence?

    Hello
    I know that there is a way to create a pay increment using the sequence by setting min and max, etc.
    However, my boss asked me to create a table with the ID with the value as follows:
    ADM2001
    ADM2002
    ADM2003
    etc...

    How can I increment like this?
    The value is between ADM2001... ADM9999

    Everything is in the books ;)
    See http://download.oracle.com/docs/cd/B19306_01/server.102/b14200/sql_elements004.htm#i170559
    INSERT into values of the object ('ABC' |) To_char (subj_seq.nextval,'fm099'), "Database", 5);

    Concerning

    Etbin

  • DEFAULT PROGRAMS THAT NEED TO COMMUNICATE WITH THE FIREWALL

    In the settings of firewall on windows7, what programs need to communicate through windows firewall for basic computer use

    In addition, in windows 7, which should be lit. Also for basic computer use

    Well, you could look on the Black Viper site for suggestions...

    http://www.blackviper.com/2009/10/01/black-vipers-Windows-7-Super-tweaks/

    http://www.blackviper.com/service-configurations/black-vipers-Windows-7-Service-Pack-1-service-configurations/

    Personally, I've never found that he needed to change the default values on all computers that I have and I certainly would NOT turn off UAC somehow...

  • need help to generate the sequence

    HII all I want to generate a sequence, but I am not able to generate

    the logic is that I must have values such as c11, c12... c199
    and then A1, A2, A3, A4... A9, B1... B9, C1... C9... Z9
    I WROTE AFTER THE CODE, BUT IT IS NOT WORKING CAN YOU HELP ME PLEASE

    CREATE TABLE ABC(NAME VARCHAR2(100));
    
    
         declare
          v_t varchar2(10) ;
         j number ;
         i number;
       v_t1 char := 'A';
         type t11 is table of varchar2(3000) index by binary_integer;
         t1 t11;
         begin
     execute immediate('truncate table abc');
            for n in 1..99 loop
              t1(n) := 'c1'||i;
     insert into abc values(t1(n));
      commit;
        end loop;
     loop  ---to convert
             j:=1;
             loop
                  v_t := v_t1||j;
                  j := j+1;---1to 9
                  insert into abc values(v_t);
                commit;
                 exit when j = 10;
                end loop;
         exit when ascii(v_t1) = ascii('Z') and j =9;
         v_t1 := chr(ascii(v_t1)+1);
     end loop;
       end;
    Published by: 810345 on May 19, 2011 15:51

    that's about it:

    CREATE TABLE abc (name VARCHAR2 (100));
    TRUNCATE TABLE abc; -- whenever possible never put ddl-code into a pl/sql-block
    
    DECLARE
    BEGIN
        FOR n IN 1 .. 99
        LOOP
            INSERT INTO abc
            VALUES ('C1' || n);
        END LOOP;
    
        FOR j IN ASCII('A') .. ASCII('Z')
        LOOP
            FOR k IN 1 .. 9
            LOOP
                INSERT INTO abc
                VALUES (CHR(j) || k);
            END LOOP;
        END LOOP;
        COMMIT;
    END;
    /
    
  • Problems of blackBerry Smartphones with all the apps that need to connect to the internet, except BB browser

    OK so I had downloaded Opera mini 4.2 and iheartradio and slacker radio and they all worked perfect for 3 days and then all of a sudden, they don't work. I timed out connections and even google maps app on my phone usually connect. The only app that connects to the internet is the BB browser (the one that looks like a globe of aureole around it). There is no other applications running causing an obstruction of. 6.8 GB is open in memory, so im puzzled? Someone help me please Im racking my brain trying to figure what it would cause. The last time it worked was listening from morning to the Slacker, then went to lunch trying to get onto the opera would not connect, then I'm on the BB browser, so it does not connect with any other app HMMMMPH.

    Understood the problem, I had a few memory leaks. Here's what I did:

    It is a database file that stores information for the applications downloaded/installed. Even if deleted still stores information about them. Use of the DM to clear it.

    Go to backup/restore > advanced > bases > content store (on your Blackberry Desktop Manager)

    Choose clear database. (Content store only)

    TADAAAA! It cleared up 3MB of space on my phone and everything works OK!

  • Why the clip in my sequence to become selected when I stop playing or click the sequence marker?

    Hello

    First post! Woohoo!

    Not sure why some of my sequences make this. I'll try to make that clear as possible, but try to put this in words could be confusing. Apologies in advance.

    When Hi hit game the clip in the sequence is not selected (highlighted) and when I stop playing, it is selected (highlighted).

    Why is this super frustrating?

    I have markers in the sequence. (and I don't have or don't want markers on my clip).

    I have my window open markers and I want to read/edit comments for my markers.

    BUT when playback stops, the clip in the timeline panel is selected, then my window markers swaps to the source clip

    and then I need to re - select the sequence for my markers window window display the details of the marker.

    And worse still, sometimes when my sequence is selected (see my bearings in the markers window), when I click in the comments box to type in a description, me clicking on which comments on the box says actually the element in the sequence that is causing my markers window Exchange back to display the clip markers (once again - I don't not wishes to add markers of my clips I want only that they in the sequence).

    And it's incompatible. Sometimes it works first try, sometimes it works 3rd test.

    This is not the first time that I have worked in this way, and I don't remember this issue previously.

    Side note: I use a multicam in mu sequence clip.

    Any help would be greatly appreciated! I like dropping the interviews in this way and I really want to keep this workflow.

    Thank you!

    Disable

  • Confused about the sequence settings

    I have some footage from 23.976 960 x 720 P2 in a new project PP.  I want to use my Kona convince to watch.

    There is no presets sequence for this... 23.976.

    But if I make a 720p25 OR a p 720 29.97 OR 720 p 59,94 sequence, I stick all my images in them and see my images through the Kona with no rendering bar at all.

    I'm confused.  I thought that if does not match the sequence and the sequence, I have to make all my images to conform to sequencing.  I'm glad I don't have to make, but I wonder what can go wrong later if I continue to edit this project at the rate of 'bad '.

    What happens here, and should I be worried?  Does it matter what the frame rate of the sequence?  (My deliverables are web videos.)

    Coming from FCP, it sounds crazy... or the magic.

    Jim,

    Do not make the foregoing; It will not create a sequence that will work with your hardware.

    I'm surprised that AJA have 24 p (23.976) sequence presets, but maybe it's like that. Try to open the dialog box new sequence and select one of the presets 720 p AJA you already mentioned. Click the settings tab in the dialog box and under the drop-down list in Edit Mode to see what AJA 720 p modes of edition you have. Choose this one, if it isn't already, and then change the timebase of 23.976. You probably won't have to change anything else; If everything looks good, save a pre-selection, so you can quickly access these settings the next time that you need to create a similar sequence.

    You must use the AJA editing modes to activate the output through the Kona card, and it is important to use a time base that corresponds to your images (most of the time) since that affects the way that managers are made for the exit. And don't be surprised if you do not have to go to Premiere Pro - it's the name of the game

    If everything above do not, check out please let me know.

  • What is the problem with the sequences on RAC environments?

    Version: 10 g, 11G

    I've never worked on CARS. But I keep seeing discussions about the problems with the sequences on CCR environments. What exactly is the
    basic question?

    Can be performance issues if you have a large number of sequences of nocache as it may cause heavy IO for the system tablespace.

    Given that each instance will have its own cache seqeuence that some sites are unhappy with significant gaps in the values, this can cause.

    There was also a blocking problem caused by heavy simultaneous new connection activity requiring the issuance value audsid for the session of v$. To solve this just to the top of the cache size to 1,000 or 10,000 by default if you are on a version where the value was not moved upward by Oracle already.

    As far as the first two numbers go that my view is if the sequence does not need to be cached you need not use a sequence to generate value. If you need a value without interval then you need to get your value from a table column value that is part of the transaction and do not use a sequence in a first time.

    Sequences are designed for speed and concurrentcy, and this competition is priced at gaps.

    HTH - Mark D Powell.

  • Updated with the sequence column

    Hello

    Using oracle 10g on Windows XP

    I have a table that is having a lot of lines (75,000). I want to update the (recno) column with a sequence number of 1 to the order of 75,000 by MyColumn.

    I got below the response of:
    Re: Insert the sequence number in a table
    CREATE SEQUENCE SAMPLE_SEQ ALL CACHE 20 NOMAXVALUE MINVALUE NOCYCLE 1 INCREMENT OF 1 START WITH 1.

    But how do I get the first order column mycolumn. I mean that I want to give the sequence number; but in the order of MyColumn. It is our application need to have a column in a sequence.

    Thanks in advance.
    Concerning

    try something like:

    merge into mytable a
    using
    (select rid, rownum rnum from (
     select rowid rid
     from mytable
     order by mycolumn) b
    on (a.rowid = b.rid)
    when matched then update
       set a.recno = b.rnum
    
  • MERGE statement is increment the sequence. It problem?


    Hi all

    I use a merge statement to update thousands of data in a table. If the criteria does not match (WHEN NOT MATCHED) I wrote an insert statement that contains a reference to the sequence. And it works very well.

    My question is, will this increment also sequence even though it won't insert the statement in the script of fusion. I think it will be. Right?

    Say, I update 20K record will be the sequence also increment by 20 times k. If his past all work around.

    Thanks in advance.

    Here is a less effective solution to your problem that creates a function to get the value of the following sequence, but I agree with Justin cave that because of the cache you must lose the values.

    SQL > CREATE SEQUENCE s_emp;

    Order of creation.

    SQL > CREATE or REPLACE FUNCTION s_emp_nextval

    2 RETURN NUMBER

    3 AS

    4 v_nextval NUMBER;

    5 BEGIN

    6. SELECT s_emp.nextval

    7 INTO v_nextval

    8 DOUBLE;

    9 v_nextval of RETURN;

    10 END;

    11.

    The function is created.

    SQL > MERGE IN emp t (USING)

    2. SELECT empno, ename

    3 FROM emp) s

    4. WE (t.empno = s.empno)

    5. WHEN MATCHED THEN

    UPDATE 6

    7 SET t.ename = s.ename

    8 WHEN NOT MATCHED THEN

    9 INSERT (empno, ename)

    10 VALUES (s_emp_nextval, 'SMITH');

    14 lines merged.

    SQL > SELECT s_emp. NEXTVAL

    2 FROM dual;

    NEXTVAL

    ----------

    1

  • Filenames on the sequence.

    After the last update of first CC of new problem has occurred. Name change clip while bringing the sequence Viewer window multicam clip.

    In borwser, I recorded footage (scene_shot_take). After having introduced a section of a file multicam to chronology that only the actual name of the raw file is displayed (not the name of connected). It takes a long time to change later takes while I don't see who is that I've used on the sequence.

    The trick is to rename the clips in the project Panel before creating the Multicam sequence. In other words, reverse step 1 and step 2.

    The result you get is exactly the same thing it would be if you had a clip in the project Panel, named 0080.mov, renamed and added to a sequence in the timeline Panel then the element of 0800.mov in 23_1_4.

    This is the designed behavior: changes in the name of a project item wave not to instances that already exist in a sequence, to the instances added after the change of the name.

  • Bind the control to the chronology of the effects with the chronology of the sequence

    This should be simple, but I can't work on how do it. First CC missing this obvious feature or am I a fool (don't answer that)...

    So, here I am, the editing effects - say for example I want to stay in an audio quickly melted and melted to hide the little noise. I want to zoom on the chronology of the effects that I can tune the exact position of the keyframes.

    The zoom in the effects window slider is time consuming and is not automatically Center on the frame that is currently selected in the sequence, in order to keep track of it and ending once zooms are really hard. Zoom on the chronology of the sequence control does not have these problems.

    SO, as I'm sure there is a good reason why my timeline effects and the chronology of the sequence does not relate normally is there a way to force this so that when I zoom the sequence of the clip (If selected) in the timeline panel?

    I don't make any sense?

    Any advice (other than "have you tried turning market again?") received with gratitude.

    Howie

    As Jim said, there is no way to bind the zoom level of the effect controls panel and the timeline. And you're right that zoom through the horizontal slider can be clumsy, lose the read head. However, if you zoom in/out keys, around here! The read head is properly centred.

    As for not being able to zoom in all the way, I never encountered this problem. If you can fill in details of the case when it won't zoom in completely for you, I'd be interested. However, one thing you might try is switching the effect controls panel to show Audio time units. In this mode, you can zoom in much more far.

  • Rights DBA on the sequence

    Hi all

    I have a problem regarding sequences, for example:

    -patterns 2 (P1, P2)
    -1 seqence (P1. SEQ_100)

    Diagram of the P2 has no rights DBA. To add the grant I use GRANT SELECT ON P1. SEQ_100 P2

    But when I let it drop and then re-create sequence P1. SEQ_100 normally the subsidy disappears as well. Is there a way which grant stays or is a few different grant that is available (active) on P2 schema, even if we lower and that create the sequence.

    Response would be greatly appreciated.

    Best regards, Robert

    Well, I expected that you want to reset the sequence, is it not? If you want to reset the sequence, then there is another way! Take a look at this:
    http://asktom.Oracle.com/pls/asktom/f?p=100:11:0:P11_QUESTION_ID:1119633817597

Maybe you are looking for