VDR 1.2 starts backup jobs
Hello
I'm having the following problem. I installed 1.2 VDR and a virtual disk in the annex which is located in an iSCSI data store (inside an Iomega ix4 - 200 d). The problem is that check every day the VDR unit makes integrity, who succeeded, but thereafter it starts all of backup jobs that have been scheduled. Windows backup is configured to start the work of backup at 20:00 and end at 08:00.
In the 'Reports', under 'Events' tab, the only event I have every day is a success "Integrity Check: task completed successfully" at 07:00.
Could someone help me with this problem?
Thanks in advance,
Warlock.
I think also restart is a good solution in many cases with VDR. You can also visit [http://kb.vmware.com/selfservice/microsites/search.do?language=en_US&cmd=displayKC&externalId=1019139]
Paul
Tags: VMware
Similar Questions
-
manually from VDR scheduled backup jobs possible?
Hi all, this may be a simple. I test VDR, scheduled tasks will work perfectly. but I would first like to a backup job on demand. There is no button or right-click options to do this? or I'm completely blind? Thank you.
On the left side, where all your virtual machines are listed, right-click on one of them one you will see the option 'save now '.
-
POS backup jobs is not new VM joined resource pools
Hello
I just got the daily report of the electronic mail of the POS device. I checked it to find errors and I saw that some newly created VMs has these unexpected values:
Last backup job: unknown (labels might be different because they are translated from the french...)
Last successful backup: never
Date of the last backup job: never
This means that these VMs were not considered by the backup task.
With the VDR, when a backup operation has been assigned to a resource pool, each new virtual machine to join this pool was naturally saved on the next backup tasks.
With POS, it seems does not work like that more. It seems that we have updated the backup operation attached to this pool (Edit, Next 4 times, finishing...) so that the new virtual machines looked to the backup to the next backup job.
So how is this? Can we have VDP automatically update his backup job to study of new virtual machines added to a resource pool?
Mini.
I noticed one thing is... If a virtual computer is added to the RP through c# (Thick) client instead of UCS, so you may need to manually do a refresh on the Backup tab, then run a backup that would automatically take the new virtual machines added to the list of resources
-Suresh
-
Follow-up of RMAN backup job details
Version:11.2.0.3/Solaris 11
Follow the details of the work of backup RMAN, this point of view view/dyn.performance dictionary do you use?
In our store, we use the incremental update (progressive fusion). For details of the previous work of RMAN, I tried to use
v$ rman_status
and
v$ rman_backup_job_details
But the information provided by these 2 views do not match. For example, on June 26, 2013, there is an incremental backup and a backup archivelog. According to the v$ rman_status, both of them took 61 minutes (46 + 15)
According to v$ rman_backup_job_details, backup jobs took 96 minutes. It doesn't seem to provide all the info about archive newspaper bkp however.
The start_time and end_time provided by two of these points of view is not math!
Col starttime format a25
Col endtime format a25
Select the status, object_type, to_char (start_time, 'dd' / MY/yyyy:hh:mi:ss) as starttime,
TO_CHAR (end_time, 'dd' / my/yyyy:HH:mi:ss) as end time,
TO_NUMBER(end_time-start_time) * 24 * 60 duration_minutes
of sys.v$ rman_status where start_time > trunc (sysdate) - 20-operation = "BACKUP."
end_time desc order.
OBJECT_TYPE STARTTIME ENDTIME DURATION_MINUTES STATUS
----------------------- ------------- ------------------------- ------------------------- ----------------
FAILED ARCHIVELOG 07/JUN / 2013:08:47:44
ARCHIVELOG FINISHED 26/JUN / 2013:06:49:16 26/JUN / 2013:07:36:14 46.9666667
FINISHED THE INCR DB 26/JUN / 2013:06:33:18 26/JUN / 2013:06:49:16 15.9666667
ARCHIVELOG FINISHED 25/JUN / 2013:06:50:55 25/JUN / 2013:07:58:01 67.1
FINISHED THE INCR DB 25/JUN / 2013:06:25:06 25/JUN / 2013:06:50:55 25.8166667
ARCHIVELOG COMPLETED 24/JUN / 2013:06:15:42 24/JUN / 2013:07:07:54 52.2
FINISHED DB INCR 24/JUN / 2013:06:01:09 24/JUN / 2013:06:15:42 14.55
COMPLETED ARCHIVELOG 23/JUN / 2013:09:47:48 23/JUN / 2013:10:01:19 13.5166667
FINISHED THE DB INCR 23/JUN / 2013:09:40:27 23/JUN / 2013:09:47:48 7.35
ARCHIVELOG FINISHED 22/JUN / 2013:07:23:18 22/JUN / 2013:07:41:29 18.1833333
FINISHED INCR DB 22/JUN / 2013:07:15:35 22/JUN / 2013:07:23:17 7.7
COMPLETED ARCHIVELOG 21/JUN / 2013:07:30:33 21/JUN / 2013:09:05:50 95.2833333
FINISHED THE INCR DB 21/JUN / 2013:06:39:35 21/JUN / 2013:07:30:33 50.9666667
ARCHIVELOG FILLED 20/JUN / 2013:07:35:54 20/JUN / 2013:09:25:03 109.15
FINISHED THE INCR DB 20/JUN / 2013:06:55:08 20/JUN / 2013:07:35:54 40.7666667
ARCHIVELOG COMPLETED 19/JUN / 2013:07:20:10 19/JUN / 2013:08:27:28 67.3
FINISHED THE INCR DB 19/JUN / 2013:07:00:02 19/JUN / 2013:07:20:10 20.1333333
ARCHIVELOG COMPLETED 18/JUN / 2013:07:27:30 18/JUN / 2013:09:19:50 112.333333
FINISHED THE INCR DB 18/JUN / 2013:07:02:09 18/JUN / 2013:07:27:30 25,35
ARCHIVELOG COMPLETED 17/JUN / 2013:07:42:20 17/JUN / 2013:08:40:29 58,15
FINISHED DB INCR 17/JUN / 2013:07:22:29 17/JUN / 2013:07:42:20 19.85
ARCHIVELOG COMPLETED 17/JUN / 2013:06:28:16 17/JUN / 2013:07:42:44 74.4666667
FINISHED DB INCR 17/JUN / 2013:01:57:49 17/JUN / 2013:06:28:11 270.366667
ARCHIVELOG FINISHED 16/JUN / 2013:02:18:02 16/JUN / 2013:04:22:26 124.4
FINISHED DB INCR 16/JUN / 2013:01:48:18 16/JUN / 2013:02:18:02 29.7333333
ARCHIVELOG FINISHED 14/JUN / 2013:07:27:44 14/JUN / 2013:08:40:53 73.15
FINISHED DB INCR 14/JUN / 2013:07:01:19 14/JUN / 2013:07:27:43 26.4
ARCHIVELOG COMPLETED 13/JUN / 2013:06:56:13 13/JUN / 2013:07:47:50 51.6166667
FINISHED THE INCR DB 13/JUN / 2013:06:42:11 13/JUN / 2013:06:56:13 14.0333333
ARCHIVELOG FILLED 12/JUN / 2013:07:12:43 12/JUN / 2013:08:12:10 59.45
FINISHED INCR DB 12/JUN / 2013:06:45:51 12/JUN / 2013:07:12:43 26.8666667
ARCHIVELOG FINISHED 11/JUN / 2013:07:21:36 11/JUN / 2013:08:46:11 84.5833333
FINISHED THE INCR DB 11/JUN / 2013:06:52:29 11/JUN / 2013:07:21:36 29.1166667
ARCHIVELOG COMPLETED 10/JUN / 2013:07:04:49 10/JUN / 2013:07:55:15 50.4333333
FINISHED THE INCR DB 10/JUN / 2013:06:49:10 10/JUN / 2013:07:04:49 15.65
COMPLETED ARCHIVELOG 09/JUN / 2013:08:10:13 09/JUN / 2013:09:04:10 53.95
FINISHED DB INCR 09/JUN / 2013:07:50:24 09/JUN / 2013:08:10:13 19.8166667
COMPLETED ARCHIVELOG 08/JUN / 2013:07:37:09 08/JUN / 2013:08:33:58 56.8166667
FINISHED DB INCR 08/JUN / 2013:07:17:56 08/JUN / 2013:07:37:09 19.2166667
COMPLETED ARCHIVELOG 07/JUN / 2013:08:32:01 07/JUN / 2013:09:34:11 62.1666667
FINISHED DB INCR 07/JUN / 2013:07:36:27 07/JUN / 2013:08:32:01 55.5666667
COMPLETED ARCHIVELOG 07/JUN / 2013:08:48:10 07/JUN / 2013:11:28:14 160.066667
42 selected lines.
-Output from v$ rman_backup_job_details
Select the State, input_type;
to_char(start_time,'dd/mm/yyyy:HH:mi:ss') as starttime,
to_char(end_time,'dd/mm/yyyy:HH:mi:ss') as end time,
TO_NUMBER(end_time-start_time) * 24 * 60 duration_minutes
V $ rman_backup_job_details
where start_time > trunc (sysdate) - 20
end_time desc order.
INPUT_TYPE STARTTIME ENDTIME DURATION_MINUTES STATUS
----------------------- ------------- ------------------- ------------------- ----------------
FAILED ARCHIVELOG 07/06 / 2013:08:47:44
FINISHED THE INCR DB 26/06 / 2013:06:00:09 26/06 / 2013:07:36:14 96.0833333
FINISHED THE INCR DB 25/06 / 2013:06:00:08 25/06 / 2013:07:58:01 117.883333
FINISHED THE INCR DB 24/06 / 2013:06:00:09 24/06 / 2013:07:07:54 67.75
FINISHED THE DB INCR 23/06 / 2013:08:07:56 23/06 / 2013:10:01:19 113.383333
FINISHED THE INCR DB 22/06 / 2013:06:00:10 22/06 / 2013:07:41:29 101.316667
FINISHED THE INCR DB 21/06 / 2013:06:00:12 21/06 / 2013:09:05:50 185.633333
FINISHED THE INCR DB 20/06 / 2013:06:00:12 20/06 / 2013:09:25:03 204.85
FINISHED THE INCR DB 19/06 / 2013:06:00:11 19/06 / 2013:08:27:28 147.283333
FINISHED THE INCR DB 18/06 / 2013:06:00:16 18/06 / 2013:09:19:50 199.566667
FINISHED THE INCR DB 17/06 / 2013:06:00:13 17/06 / 2013:08:40:29 160.266667
FINISHED THE INCR DB 16/06 / 2013:06:04:02 17/06 / 2013:07:42:44 818,7
FINISHED THE INCR DB 15/06 / 2013:06:05:12 16/06 / 2013:04:22:26 617.233333
FINISHED THE INCR DB 14/06 / 2013:06:00:09 14/06 / 2013:08:40:53 160.733333
FINISHED THE INCR DB 13/06 / 2013:06:00:09 13/06 / 2013:07:47:50 107.683333
FINISHED THE INCR DB 12/06 / 2013:06:00:10 12/06 / 2013:08:12:10 132
FINISHED THE INCR DB 11/06 / 2013:06:00:17 11/06 / 2013:08:46:11 165,9
FINISHED THE INCR DB 10/06 / 10/06 2013:06:00:14 / 2013:07:55:15 115.016667
FINISHED THE INCR DB 09/06 / 2013:06:00:10 09/06 / 2013:09:04:10 184
FINISHED THE DB INCR 08/06 / 08/06 2013:06:00:09 / 2013:08:33:58 153.816667
FINISHED THE DB INCR 07/06 / 2013:06:00:19 07/06 / 2013:09:34:11 213.866667
COMPLETED ARCHIVELOG 07/06 / 2013:08:48:10 07/06 / 2013:11:28:14 160.066667
22 selected lines.
When I run a full/incremental backup archivelog with it shows only as a job in v$ rman_backup_job_details. If I run explicitly just a backup archivelog all RMAN makes it appear separately as an ARCHIVELOG backup in v$ rman_backup_job_details.
rman_status indicates the individual pieces of the jobs. For example, for a full backup, it shows the db backup and the archivelog.
The start and end time in rman_status should match with $rman_backup_job_details.
Lets take the 25th, for example:
In man_backup_job_details
INPUT_TYPE STARTTIME ENDTIME DURATION_MINUTES STATUS
----------------------- ------------- ------------------- ------------------- ----------------
FINISHED THE INCR DB 25/06 / 2013:06:00:08 25/06 / 2013:07:58:01 117.883333
In v$ man_status:
OBJECT_TYPE STARTTIME ENDTIME DURATION_MINUTES STATUS
----------------------- ------------- ------------------------- ------------------------- ----------------
ARCHIVELOG FINISHED 25/JUN / 2013:06:50:55 25/JUN / 2013:07:58:01 67.1
FINISHED THE INCR DB 25/JUN / 2013:06:25:06 25/JUN / 2013:06:50:55 25.8166667
You should view your log files to see what rman was between 06:25:06 and 06:00:08 when work began at the start of the incremental backup.
You can see that the end time is the same in both views.
Not easy to explain but I hope that helps.
-
When vDR to perform full backups?
I'll set up an installation of vDR test as a proof of concept, and contrary to read the documentation, it appeared on me... when vDR do full backups? I know that the first virtual computer backup is a complete and incremental after that. But when the following is executed? I did some Google'ing and looking through the documentation, but have not yet found an answer.
Currently I ave the configuration of the backup task to keep 6 daily backups every 4 weeks and 1 month. When the first full backup has expired, another take? Also, is it possible to force a full backup on one computer virtual other than to create a new backup job?
void269 wrote:
.. .in makes vDR do full backups? I know that the first virtual computer backup is a complete and incremental after that. But when the following is executed?
My understanding is that VDR still to complete and never traditional backups "extra." However, given that the backup data store uses a deduplication technology each "Full" backup will only grow with the blocks changed since the last backup.
-
How plan 2 separate backup jobs using Windows 7 backup & restore?
How plan 2 separate backup jobs using Windows 7 backup & restore? I would like to back up some files more frequently than others.
Hello CasPhillips,
Try to use Task Scheduler to schedule two separate backups.
Otherwise, you may need to use a 3rd party backup solution.
Thank you
Marilyn
-
How to start a job using DBMS_SCHEDULER depending on the result of other JOBS
How to start a job using DBMS_SCHEDULER depending on the result of other JOBS
For example I have two jobs A and B of EMPLOYMENT, I would like to start JOB B only when a JOB is complete, is an option like that?
Hello
Yes, you can create a channel with the Scheduler, see the documentation:
Creation and management of channels of employment
http://docs.Oracle.com/CD/E11882_01/server.112/e25494/scheduse.htm#ADMIN10021
-
Hello to all,
HO a con strano problema he DR 2.0.2: ho back to di for the work of the United Nations con 20 da NAS vm fatto knew a 250 GB. Tutto funziona fino al primo error dopo a che dei punti di ripristino danneggiati tell re-indexing. Segno IO come da clear I punti danneggiati, launch the integrity check che termina con esito positivo my it work back successivo ha (ad esempio) di solo 15 vm. Oggi Apoteosi: 0 vm da backuppare!
A nobody e successo? Appliance e prima stata updated da una 2.0.1 e poi reinstallata da zero formattando Reed he sin...
Max
Perched ECCO:
If back to 2.0.1...
-
OEM 12 c has no monitoring of backup jobs
Hi guys!
Could you please tell me how could filter emails for only the backup jobs failed which are created in OEM 12.1.0.3? I would like to create a collateral rule for failed backups and receive these emails, now, I followed all the backups by e-mail using custom RMAN scripts, and I want to bypass this method completely with OEM 12 c.
Thank you!
If you want just an e-mail notification failed (no collateral) and then, when you create a job (any job) you can go to the "access" tab and click on the check box 'problems' 'Notification by e-mail to the owner '. In this case, whenever your job fails, you will get the email. For example
This table contains administrators and roles that have access to this job.
Add Name Type Access Level Remove Super Administrator Owner DBADMIN Super Administrator View SYS Super Administrator View SYSMAN Super Administrator ViewFull SYSTEM Super Administrator View Notification by e-mail for the owner
A Notification rule can be used by any administrator to receive notifications on this work. The owner can choose to receive e-mail notifications based on the values of selected below status. E-mail will be sent according to the timing of notification of the owner.On-demand running suspended succeeds in issuesAction required TIP Owners must apply the rules of the event to get notifications A Notification rule can be used by any administrator to receive notifications on this work. The owner can choose to receive e-mail notifications based on the values of selected below status. E-mail will be sent according to the timing of notification of the owner.
On-demand running suspended succeeds in issues Action required TIP No owners must apply the rules of the event to receive notifications on this work. -
Backup jobs and change of password problem
Hello
I've created a few jobs of rman in my db (11.2) of the database backup.
I have my business I have to change all the passwords system (os - oracle, system, syman, etc.) every 90 days.
When I change the password for the user who created the backup jobs, this project work stoppage.
I, ve got the error 'invalid username and/or passworderror entry write command '.
Of course after having changed their passords I always place 'Favorite powers', but it does not help.
I do wrog? What Miss me?
Please advice.If you use references preferred to allow a work, it uses the current credentials at the time it is distributed for execution.
This means that if you change passwords, you just need to modify you favorite of credentials
It's something that you can use EMCLI (command line interface) in a script, for example (or just use the GUI to change)
Checkout:
Oracle® Enterprise Manager command line interface
11g Release 1 (11.1)
http://download.Oracle.com/docs/CD/E11857_01/EM.111/e16185/TOC.htmconcerning
Rob
http://oemgc.WordPress.com -
Dear guys,
I; new m in POS and it seems immediately, I encounter problems.
Deployed to the device, all good, created a test backup, everything is good.
When I manually start the backup I get nothing running, no task activity, no error.
Restarted the SMC and the unit several times...
Any idea?
Mathieu Merci in advance.
Daniele
Can you join the vdr - unit server.log. Path: (\usr\local\avamar\var\vdr\server_logs)
Also, rerun the backup operation and give the exact time, so it helps me if I look in the log file.
-
I have data pump export job running (12.1.0.2) OEM who started with the following error messages:
ERROR: Failed to create the order process
D:OracleAgent12ccore12.1.0.2.0perlbin/perl -I D:/Oracle/Agent12c\core\12.1.0.2.0/sysman/admin/scripts/jobutil D:/Oracle/Agent12c\core\12.1.0.2.0/sysman/admin/scripts/jobutil/runSQLScript.pl D:\Oracle\product\11.2.0\dbhome_1 insite2 "" execution failed: The system cannot find the file specified.
I find the below in emoms.trc:
2015-01-09 12:22:47, 481 [EMUI_12_22_44_/console/jobs/main/general] WARN create. MainJobBean logp.251 - MainJobBean: setJobCredRecordData: [job < SYSMAN >: FULL_EXPORT_ADHOC ID: FEAD89A962B8487D9F0BC0A030A65B22] the two uses of the information of identification and employment cred records the data detected. Set not old ones given credentials. Bailing.
Anyone know what could cause this start happening and how it can be solved.
FYI: this is the production of backups so I need to get it resolved as soon as POSSIBLE.
System information:
Servers: Windows 2008R2
OEM 12.1.0.2
Oracle DB 11.2.0.2
Thanks in advance,
Dan
Could u pls check the options below.
1 - Cygwin is not installed on this 'target' correctly - host http://www.cygwin.com/setup.exe
or
2. Add the cygwin%\bin environment variable %path% in the settings variable system wide environment.The Management Agent must be restarted after the changes above to the host.
-
Can a vDR device cause multiple backup destinations?
I tried adding the shares network, adding that a different network share seems to remove the network share previously implemented at which the current backup operation is set.
I want two shares of different network for a device with two jobs vDR, each backup operation goes to a different network share.
How can I do this? 1.2.1 using latest version vDR.
Alternatively, if each camera vDR can talk only to a single network share data store, I can set up another camera vDR.
Thank you, Tom
CIFS is not a recommended destination and can be much slower. If you want an accessible destination I would add a couple of NFS shares as network data warehouses. Then add a normal VMDK unit vDR. You can do several (more than 2) virtual machine backups but as I've mentioned before that you will incur the trouble to write the cbt file for each additional backup done.
I'd do more simple a test you can against 2 or 3 small VMs. run multiple backups. Check the speed of the restoration. Decide if you can live with the speed of the restoration. I'm not sure that this is the most appropriate use of the vDR unit.
-
Using VDR 1.2 to backup VMs to iSCSI
VDR is supposed to be able to backup to iSCSI according to marketing materials. I saw a post on 23/07/09 the same question. RParker responded by saying that the answer is Yes and no. I would like to get a detailed response on the part of this answer Yes.
I installed VDR and 3 TB iSCSI network device is now regarded by the host as a data store works. The VDR Configuration tab only allows me to add a "network share". What should I do to make the VDR 'See' the iSCSI VMs backup location as data store? I have two servers Windows and SLES 10/11 servers. I know that to be effective with deduplication each OS should have its own backup location.
Other issues that are important:
1 VDR will work with SLES - looks like only Red Hat and Ubuntu? Does it matter if it's iSCSI or actions?
2 dedup will work with VDR and iSCSI or only with stocks?
If there are documents or links to other community responses that will help, just reply with the URL - no need to retype responses. But please make sure they are clear and concise!
Thank you very much
Charlie
Once all your guests can see the target iSCSI as a VMFS database, add a new virtual disk directly to the virtual appliance for data recovery (max 1 TB from the documents I've seen so far). When you start the DR unit, you should see the newly added disk and be able to format and mount. From my understanding network shares 'Add' to communicate with CIFS or NFS shares. iSCSI and FC target must be added as a data store to the level of the host.
From my understanding VDR save upwards of any virtual computer either. Ideally, the virtual machine will be at the hardware level 7 and running the latest VMWare tools in order to get the most effective (dedup/tracking changes block) and the OS and APP quiecsing.
I also believe, dedup works on any target (iSCSI, FC, NFS, CIFS) VDR.
I'm still learning it and the documentation is not fabulous, above is my experience so far. I hope it helps.
-added 9/2 10:56. I realized that CIFS is the only part that you can add to "add a network share." All other targets (FC, iSCSI, NFS) must be presented to the virtual appliance as a vmdk. The VMDK would reside in the data store of FC/iSCSI/NFS that you set up.
-
Record of 312 ReadyNas Backup Job does not connect
Hi all
We have a readyNAS we are trying to save on Dropbox.com. However, when I try to save more then a part of the second I try to backup will not backup. I have to disconnect and reconnect the ReadyNAS on dropbox and then I can start the second part of backup, but then the first part will no longer connect and save. Is there a limit as to who can I save both number of shares? Is there something missing that I have to do to save multiple shares on dropbox? I really need to understand that because we use it as a backup and if it doesn't we have to find something different.
Thank you
Dan
The Dropbox feature is for a single action of backup to Dropbox.
You can consider other options such as obtaining a second backup using ReadyNAS Replicate ReadyNAS.
Maybe you are looking for
-
With the help of NOR-5641R with FPGA and the instrument driver
-
TPC - MatchRegExpEfficient is a missing file of VI or C
Hello I'm creating a whole involved system that includes a touch screen (2106 t). I need 2 .exe for display. One for PC and one for the touch screen. Code would be exactly the same. So after having developed the software for the PC, I moved a VI in d
-
nothing happens when I click 'change user '.
Followed the steps in the PANEL re switching users, still no response. Tried the strikes and am, you are prompted for a password that does not exist.
-
How to reinstall Vista on PC Toshiba laptop with new hard drive?
Hard drive from my Toshiba laptop of sisters died as well as its internal fan and she asked me to fix it, well I got a new hard drive and replaced the dead with a new internal fan and works perfectly fine with a Linux Live CD. However, she had previo
-
Windows media player won't erase music
my Media Player, somehow, made several copies of my music. I could do it on an accident or something I guess, idk. All I do is erase the entire library in media player. But when I tried to delete the songs, it only show this small window that says WO