Confusement of VCP cert requirement

Hey all,.

My apologies for my first post being a little panic confuzzled.

In fact, I sat the VMware vSphere: install, configure, manage [4.0] courses in January 2010

Tomorrow I do a What's New (version 5.0) two days on upward

and with my copy of the Official Guide to the VCP 5 Cerrtification wants to pass VCP 5 exam at the end of February.

However, one of my friends said that I can't become a VCP 5 that the course I did in 2010 was not the 4.1 one?

However, the Blue Print says that even if I didn't review for v4 too long I did an internship of 4, I can still do the whats new, review of the v5 v5 and so pick up a cert v5.

http://communities.VMware.com/docs/doc-16726

Is this correct? Or I need to do more training and spend more ££ s£?

Kind regards

Nathaniel

Certifications are specific to the main version, so your combination of training will qualify you for VCP5-DV.

ICM on 4.0 or 4.1 is eligible for the DV VCP4

ICM 5.0 or 5.1 qualifies for the DV-VCP5

ICM on 4.0 or 4.1 and 5.0 or 5.1 WN qualifies for the DV-VCP5

If you want absolute confirmation, email [email protected] and wait for their response.

Tags: VMware

Similar Questions

  • VCP 5 requirements

    Hi people,

    Can you please confirm that if I went to VMware vSphere 5.0: install, configure, manage course, I will fill the condition to be able to take the exam?

    Thanks for the reply in advance!

    Yes, you can, see here: http://www.vmware.com/go/vcp

    You can take the exam independently of the course, but the course qualifies for certification.

  • The VCP exam requirements

    Hello

    I would like to take the VCP exam, but I did not take any course by Vmware, I have in my company 4 VMware servers and virtual Center.

    If I can take the exam without attending the course of VMware?

    Thank you

    I believe you can pass the test, but you will not be recognized as a PCV until all the prereqrisites have been met.

  • Expiry of VCA - VTC of cert?

    So I can see that VMware did the VCP cert a contract of 2 years (since May of this year I think).  However, I don't see anything on the VCA - VTC does - this it an expiration of the certification too or did an a cert of time?

    Thank you.

    At this time only the VCP certification have a recertification policy: Policy of Recertification

  • Adobe current requirements for mac CC

    I check online, but there is a lot of confusion between the system requirements for adobe cc.  Here at school we have mid 2010 2.4 ghz processor intel core 2 duo, macbook pro, running system 10.7 8 GB of ram and 250 GB hd I tried to launch the trial of cc and had no luck. Nobody knows what the system requirements are for more current CC of the software. I see on the Adode site, muilt core intel and 10.7 and then on another page muilt cord intel 10.9.  Of course I can't at Adobe phone number to ask such simple questions.

    each of the programs have different specifications, but in general you won't have to run later with the os 10.7.

    Here are the specs of each program cc, so you can see what versions of what programs you run, system requirements | Cloud Creative

  • Is online VMware vSphere: what's new annex of courses to meet the requirements of the PCV

    Hey VMware education people.

    I see there is a big difference in cost between the cost of training online and course VILT from Dell.  Is that self to the pace online, what new course meets the condition necessary to be able to take the exam VCP of vSphere 4 of 31/12/09, or we will have to follow the course of 'class '?  I took the two teams in class VI3, but have not yet taken of the VCP VI3 exam.  If I can take the vSphere 4 What's new online auto to the rhythm of the course to be eligible for examination VCP vSphere4 then that is what I would do.  Thanks for your help on this.

    I just spoke with VMware education Services. The VCP certification requires that the instructor course. It can be in a classroom or online.  Courses online at the rate of the participant are not eligible for VCP certification.

  • Old VCP coursework still valid?

    I was sent by my employer to VMWare VI3.0 training, but did not get the VCP cert at the time where I took the course.  I would get the cert now, but it seems that I need the course VI3.5.  Is this true?  Is my VI3.0 class just a waste now, even if the differences are not that big and easy to study up on?

    Any information would be appreciated.

    An official course 3.0 you will qualify for the PVC if you were to take the exam today, with the review based on 3.5. You can follow a course of 3.5, but you don't have to. be warned though, a lot of the specifics of what do you the test on the current review will be different when you have attended.

    I recommend getting the current examination plan and the last documentation VI3 and study of those. 3.0 equipment training has still a lot of value, but less so then when the review was based on 3.0.

    Scott.

    -

  • VCP on VI3 Mock Exam?

    I took the Mock Exam and I was wondering if it is a useful study guide? Is anyone else now to a site like the Mock Exam for VCP Cert?

    Welcome to the forums - it's better sampling of questions and will give you a good feel for the types of questions you will get however, it shouldn't be your only source of study - if you took using class install VMware and OCnfigure of the student as a study guide manual - you can gte more than information in PDF located here - http://www.vmware.com/support/pubs/vi_pages/vi_pubs_35u2.html - some of the key files are Guide ESX of Server Configuration 3, guide to management resources and the Configuration Maximums for VMware Infrastructure 3 and if possible get the hands on experience.

    If you find this or any other answer useful please consider awarding points marking the answer correct or useful

  • VCP5 to VCP5.5

    Curious that I couldn't find a straight answer on the forums. So I apologize if this is something that responded.

    I have my VCP5 in VMware ESXi 5.0. Close enough review when it came out, but I just want to get 5.5 so I don't have to worry about this for another 3 years.

    Of course, I took the class for the cert. My question is: is there something else I have to do other than take the exam VCP5.5 to get my cert in 5.5 and, at the same time, renew my VCP cert?

    Do I have to take the class? Or something like that?

    Thank you!

    So, if I take the VCP - DT, my VCP - VTC is renewed?

    Yes, according to the political recertification page I linked to above.

    VCP - DT, I don't need a class?

    Well, you'll see the conditions required for the VCP - DT here: (VCP5-DT) VMware Certified Professional - Office

  • Invitation to the beta exam VCP5-DT

    Hi guys

    Recently, I finished doing my cert VCP5 and was super happy to receive an email saying I was invited to the VCP5-DT Invitation to the beta examination to VMware. I always wondered how people getting these guest, now, I know. My question to the forum is:

    -Format of the examination is more than 3 hours and 225 issues

    I didn't know it would be all the exam questions and not the usual 80 or more. Does anyone know the pass mark?

    Are more generous VMware by the way these people who take the beta version review

    -I did no preparation to the poster and the review time is on December 20

    It is always interesting to try to give the review in so little time, since I have the opportunity. As the review is half price, they told me

    -If I pass this will count as a real exam cert even if it is a beta version review or will I have to redo the real exam?

    I am in 2 minds to go all court for review, but 20 is too early and as most reviews of VMware, you have to really know your suff you can not just luck

    Others thoughts and opinions would be very appreciated of the form.

    Thank you very much

    Concerning

    -Format of the examination is more than 3 hours and 225 issues

    ALL of the questions. Fundamentally, VMware test the first set of questions on the beta tester.

    -Anyone know the pass mark? Are more generous VMware by the way these people who take the beta version review

    Is still 300, but this does not mean that this beta exam is simpler.

    You have to study hard to pass.

    -I did no preparation to the poster and the review time is on December 20

    This could be a problem. The VCP - DT require a good knowledge of the view...

    -If I pass this will count as a real exam cert even if it is a beta version review or will I have to redo the real exam?

    If you pass you get certification

  • PCC 510 Exam

    Hello

    I took lessons for 4 VCP (VMware vSphere: install, configure, and manage) this year, 11 July and currently preparing the review of the secure Channel. I'm confused if I am eligible to 510 PCC or should I give VCP 410 first? Looked VCP 510 requirements review and his confusion... Please help!

    Thank you

    Nitin

    VSphere CIM class does not qualify you tp become a VCP5 - if this is your goal take the VCP-410 exam - when you spend it you will become a VCP4 how if you take and pass the exam VCP 510 before February 29, 2012 you'd be a VCP5 with no other class rules - after February 29 you need to take the vSphere 5 this is the new class-

  • DROID: SMS Info

    I'm a little confused about SMS. Is the transport for SMS text messages? If this is not the case, how to send an SMS message? My long distance plan with Verizon data unlimited but I pay for messages on a per-message basis.

    Thanks in advance.

    Jim

    Yes SMS is a specific thing phone... phone telephone number numbers SMS (160 characters I think) and not to be confused with emails, which require an e-mail address and the e-mail server for transport.

  • Calculate the material database

    Hi all

    I'm new Oracle DBA in the industry, not a lot of experience in the database. I have some confusion. Maybe it's stupid question but this turning point in my mind. Please help to solve these.

    (1) for new projects comes, I'm confusing all cache/RAM required and CPU. Although I can calculate the capacity of the hard drive.  for example - my Application user say we have total TPS (transactions per second) is 1000 (200 update, delete 300, 100 and 200 insertion selects), so in this case how can I calculate hardware capacity, and how I can answer for them.

    (2) this is the reverse of the first question.  Suppose a database running, and everything works fine. I want to calculate the GST (transactions per second). means how select/update/insert/delete running in the second. How to calculate or identified TPS.

    Thanks in advance...

    Reg,

    Hard

    Thank you all, I got my answer...

    Oracle Capacity Planning

    Introduction - Database management

    The best way to perform the Oracle capacity planning is with planningsof the worksheet of the ability of the Oracle. Database management has increased over the years to the simple management of a few tables and indexes to a complex of interlocking responsibilities ranging from management of objects of database to participate in decisions large enterprise on hardware, software and development tools.

    In order to fully discharge these functions the modern Oracle DBA needs one big together skills. In the last hours, we will discuss the skills needed, and specifically how they apply to an Oracle DBA.

    Capacity planning system

    In a green field operation (the one where you're here in front of the equipment and the database), a DBA will have a critical role to play in planning and configuration of the new system. Even in existing environments the ability to predict new servers, new databases, or improvements to existing databases and systems is crucial.

    Essentially the DBA should be concerned with two main questions:

    1. Get enough server to ensure an adequate return
    2. Sufficient backup and power of recovery for backup and restoration carried out respecting the time constraints required.

    All this is actually under the heading planning resources and capabilities. Resources and capacity planning Oracle is a database intensive resources system. The more CPU, memory and disk resources, you can provide Oracle, better it performs. Planning with Oracle resources becomes more a game of "How can we afford to buy" instead of "what is the minimum configuration. A minimally configured Oracle server won't work effectively. Specification of resource for Oracle In the specification of resources, there are several questions that should be answered.

    1. How many users will use the system today and in the future?
    2. Data will include the system contain both now and in the future, we don't know the growth rate?
    3. What response time are expected?
    4. The availability of this system is planned?

    Why are these issues important?

    1. How many users will use the system today and in the future?

    This issue is important, because it effects how much processing power is going to be necessary. The number of users will determine the number and speed of the processors, memory, the related network configuration size.

    1. Data will include the system contain both now and in the future, we don't know the growth rate?

    This issue is important because it determines the disk needs, how much storage will need to take the data we have today and how it will be necessary for the growth. The answer to this question also allows to determine how much memory will be needed.

    1. What response time are expected?

    This question is important because it pushes the number, type and speed of CPU resources, but also of network problems. He will lead also issues such as the number and speed disk configuration disks, number and speed of the controllers, disk partitioning decisions.

    1. The availability of this system is planned?

    This question is important because the availability of the system grows the type of RAID (1, 0, 0/1, RAID5) configuration, the type of scheduled backup (cold, warm) and parallel server problems. Requirements change if all that is expected is the system to be available during business hours from Monday to Friday, or if the system is supposed to be available 24 X 7 seven days a week. This also leads the type of backup media, be it a single tape drive is all that is necessary or is it a hi-speed, tape-stacker, multichannel, solution based silo?

    To properly perform a capacity planning cooperative efforts should be made between system administrators, database administrators, and network administrators.

    Step 1: Size of the Oracle database

    A starting point for the whole process of capacity planning is to know how many and what size, databases will be based on a given server resource. The physical size of the tables, indexes, clusters, and LOB storage areas will play an essential role in the sizing of the overall database, including areas of shared global memory and disk farm. DBAS and developers must work together in order to properly size the physical files of the database. The design of the database will also lead the placement and the number of storage spaces and other resources of database such as the size and quantity of newspapers of recovery, rollback segments and their associated buffers.

    Typically areas of buffer of data to an LMS database block size out to between 1/20 to 1/100 the physical sum relative to the total number of database file sizes. For example, if the physical size of the database is 20 gigabytes the database block buffers should on about 200 megabytes to 1 gigabyte in size depending on the how the data is used. In most cases the LMS shared pool would be size out to about 20-150 megabytes maximum according to the usage model for the common areas of SQL (see next lesson). For a system of 20 gigabytes the redo logs would most likely run between 20 and 80 megabytes, you want mirrored volumes and probably not less than 5 groups. The pad of paper to support a 50 megabyte redo log file would be a minimum of 5 megabytes may be as large as 10 megabytes. The last major factor for BMG would be the size of the sorting box, for this size of a database, a sort of 10 to 20 megabytes field is on the right (according to the number and size of all kinds). Remember that sort areas can be a part of the shared pool or a part of the large pool, so we'll cover in a future lesson.

    So on that basis we've determined? Gives a choice of 400 megabytes for our size memory buffer of data block, 70 megabytes for the shared pool, buffers of the newspaper of 4 to 10 MB (40 MB) and a size of 10 megabytes sort field. We look at a megabyte of 500-600 LMS with the important factors of non - DBA added in. Since you are not supposed to use more than 60% of the physical memory (according to the interviewee) it means w will need at least a gigabyte of RAM. With this size of database a single UC probably won? t give enough performance so we are probably looking at least a 4-processor machine. If we have more than one instance installed on the server, the memory requirements will increase.

    Step 2: Determine the number and Type of users:

    Of course, a database of a user will require fewer resources than the user database of a thousand. Generally, you will need to take a LOOT at how many memory resources and drive each user will need. An example would be to assume that a user installed 1,000 users base, only 10 percent of them at the same time will use the database. That leaves 100 concurrent users, those who perhaps a second 10 percent will do the activity requiring sorting areas, this brings the number up to 10 users each use (in our previous example) 10 megabytes of memory each (100 MB). In addition each of the 100 users simultaneous need about 200 k of space (depending on the activity, BONE, and other factors) process so there is an additional charge of 20 megabytes just for the user process space. Finally, each of these users will require probably some amount of disk resource (or less if they are client-server or web-based) let? s give them 5 meg of disk to start each, which adds up to 5 gigabytes of disk (give or take a meg or two.)

    Step 3: Determine the hardware requirements for the required response time meet and support of user Support:

    This step is the system administrator and maybe the seller of equipment. Given our mix of 1000:100:10 users and any required response time numbers, they should be able to configure a server that will obtain good results. Usually, this will require several, interfaces multi-lane disks and several separate physically the drive bays.

    Step 4: Determine the material backup to support the requirements of availability required:

    Here again the admin system and hardware vendor will have a helping hand in the decision. Based on the size of the disks and the speed of the maximum recovery time backup solution should be developed. If there is no way to meet your requirements of availability required using backup schemas simple more esoteric architectures can be specified as strips of multiple channels, hot databases in standby or even Oracle Parallel Server. Let? s say we need a requirement of availability 24 X 7 with instant failover (no recovery time because of the critical nature of the mission of the system). This type of specification would require Oracle Parallel Server in a configuration of automated failover. We also use either a double or triple mirror on disk so that we could divide the mirror to perform backups without losing the protection of mirroring.

    Let? s compile what we have determined so far:

    Material: 2-4 CPU (for higher-speed CPU we can) with at least 1 gigabyte (preferably 2) of RAM shared, at least 2 disk controllers each with many channels, 90 gigabytes of disk resource using a three way mirror to give us a matrix to mirror a triple 30 concert. The systems themselves should have a sufficient internal disk subsystem to support the operating system and the swap and the requirements of pagination. Systems must be able to share the disk resources so should support clustering. High-speed tape backup to minimize the folding times mirror.

    Software: Oracle Parallel Server, Cluster, the network management software, software backup management software to support backup material.

    Capacity and resource planning is not an exact science. Basically, look for a moving target. Dual Pentium II 200 NT Server with 10 GB of 2 GB SCSI disks for $5 k, I bought 2 years ago has a modern equivalent in the Pentium III 400 with the builtin 14 concert my father-in-law just bought for $1 k. At the time where we specify and purchase of a system, it is already replaced. You should insist on power substitute options more effective, more inexpensive they are available during the phases of specification and procurement.

    Reg,

    Hard...

  • First en Vmware - tips

    Hello, good afternoon!


    Prezados,


    Estou iniciando bone studies para obter a Vmware reference ao course oficial en don't do ICM 5.5 no qual participei. Minha atividade faith watch o course ultima online "VMware Data Center Virtualization fundamental" realize primeiro o exame but basico, ja I bought o livro para me cadastrei no site da VIEW e estou me 2nd para o exame.


    Voltando an en ICM.5.5, gostaria obter information e tips of studies and ja Fez o exame quem quem ainda esta is preparing day-lo para.
    Atualmente para indeed os studies montei um LAB minky refazer tudo o faith visto para no official of the course, pergunto is suficiente e or is can not obter other estudo fonts.


    ATT,
    Fábio Gomes
    Suporte associate

    Fabio,

    O course oficial e um bom comeco, very como a VCP prova requires um certo Anthony of redes (conceitos of VLAN, TRUNK, etc.) e storage (conceitos of FC, iSCSI, NFS, zoning, etc), to ja possui esses conhecimentos com certeza você a prova will bem tranquila.

    Para indeed seus studies, da video (em inglês) em recomendos os seguintes training CBT Nuggets e seen the plural (antigo Train Signal).

  • Centro + Exchange: There was a problem synchronizing messages

    I followed the instructions on this page: http://kb.palm.com/SRVS/CGI-BIN/WEBCGI.EXE/, /? St = 116, E = 0000000000145083804, K = 5545, Sxi = 18, case is Obj(45113) and I have connection problems. We use OWA and I can access this page from my phone and connect, but I get an error. I assume that the error is all simply because the page is too large for the phone to load. I know that the e-mail address and the password are good because I entered them several times and tried several accounts. If I have SSL on and the hit test I get the error: connection to Server error. Please check youre network or server and re-synchronization settings. If I disable SSL I get error: there was a problem synchronizing messages. If I put in what I know to be the wrong address with SSL off I get error messages from the server connection, so I think I'm at least getting the phone to see the server.

    Hey!  Update time.

    Kayden plugged away and got her headaches of restated certificate.  He ran Server2003 with Exchange2007 and we discovered that the previous admin never swapped the original self-signed certificate that Exchange moved with.  You know, - the cert that totally kills your ability to activesync, because it is not issued by a certificate authority valid with a server to export cert and inject it into a Centro (or other handheld).

    As a solution in the short term for his small business, he did not convince management to buy a commercial cert immediately.  Instead, they choose to install Server 2003 become business certification as their own certification authority root in trust with the ability to issue free self-signed certificates.  In addition, the Microsoft suggestion is that cert SAN is the best way to secure Exchange Server.  He has used a simple hack to activate his new CA to issue certificates of SAN and was able to issue a custom SSL certificate.  We are now ready to install and get things running.

    After a little confusion about which cert is supposed to go where (a root CA certificate was downloaded from the CA server to add to each customer so that they would trust self-signed certificates), the new SSL certificate has been installed by using Exchange Management Shell first IMPORT the cert, then turn it.

    Then, a test Cento was hotsync 'ed to add the new Board to the store root trust of the Palm OS' using this tool: http://www.palm.com/us/support/downloads/versamail/certmodtool.html

    VersaMail has been configured to connect to the Exchange 2007 server using the Regional service and the first synchronization went perfectly.  With sync "as items arrive" handheld is able to send and receive without any problem.

    Outlook clients were then the installation program to trust the new CA as well and everything went back to business as usual.

    Don't is love a happy ending?

    Message relates to: Centro (Sprint)

Maybe you are looking for