First CC and time remapping Question

With the help of first cc... I remappe time at the end of a clip to slow down, but the audio has stopped the now longer clip. I can not just stretch the audio clip on as I did before.

[Left the forum Cloud/Installer generic for program specific forum... MOD]

Hi, Mike G,

Have you found it yet? If not, contact support here.

Thank you
Kevin

Tags: Premiere

Similar Questions

  • Stabilizer of Warp and time remapping with 4 k clip in a sequence of 1080 p

    Hello

    I work with 4 k videos in a sequence of 1080 p. This way I can zoom the clips and get more details in some parts of my video.

    For some of my clips, I need to use the gradual stabilizing effect combined with time-remapping. To use stabilizer chain on my project, I need to create another sequence to adapt to my 4 k resolution, apply the chain stabilizer and then add this new sequence to my 1080 p sequence. Chain stabilizer works very well until the time remapping effect is applied. This new seens effect just neutralize the stabilizing effect of deformation.

    Is it possible to use these two effects combined with 4 k clips?

    Thank you!

    Try the k 4 nesting sequence before you add the time changes.

  • vmtools and time zone question

    I have a question regarding the vmtools and time zones and the host.  When you use the feature vmtool time, regardless of what the time zone is assigned to the host?

    Which means that if the VM is Oriental and the host is Pacific time, vmware will keep the vm that is synchronized with the time of the East or it syncs to Pacific?

    It does not matter.

    The same NTP Protocol.

    André

  • What is the best way to stabilize the Warp has clip AND time remapping it?

    I can't do these two operations successfully.

    Any ideas?

    First time remapping.

    Nest.

    Teleport on the nested sequence.

  • Audio time remapping?

    Hello

    Is there a way of time-remmap the audio with Adobe CC? I need to gradually slow down a clip of music and then accelerate this return.

    Does anyone have experience with this?

    Also, I noticed that decreases the speed of a video clip is not the same as the use of the effect of the time-remmap. Is there a formula to find out how to synchronize clips with two effects? Mainly to synchronize audio and video clips.

    Thank you

    These help you?

    Time-remapping. No stupid Questions with Colin Smith | Adobe TV

    Pitch shifting and time remapping in Adobe Audition - YouTube

  • Time remapping a nested sequence results in video black/empty

    Hey!

    I have a long sequence (47 minutes), I want to remap time (to increase the speed of certain keyframes). I therefore nested sequence in a master sequence, where I make the time-remapping. However, I feel what seems to be a weird bug: to a certain slice turns black/empty video and stays that way - even if the original sequence keeps the video material.

    It's not helping to split the clip (nested sequence) in small clips and time remapping those individually - just empty frames appear earlier in each clip.

    Export works very well

    When I export the sequence as a medium, the output looks very good however.

    I hope that you are able to help me or tell me, if I do something wrong.

    Thanks in advance!

    Hardware information

    I work on a MacBook Pro (retina, 15 inch, mid-2014).

    You can also try to change the software-only rendering engine. It's under "project settings" in the menu.

  • Why can't Adobe first Pro CC 2014 time remap Audio and Video together?

    In case you haven't noticed, my question is WHY.  I don't know why Premiere Pro can't do that.  What I understand at the moment, the only way to time remap audio in anyway shape using the software Adobe is Adobe After Effects, that my computer has no chance of ever being run through.  I know how to stretch a regular hearing and Premiere Pro audio, but apparently I can't time remap audio using these programs.

    So why can't Adobe Premiere Pro time-remapping audio with the video?  What is the reason that he can't?  It's a disappointment, huge and very impressive to see in the future.  If it is possible to time remap audio and video in After Effects, which is great and all, except for the fact that I can't use this program.  Why can't we do in Premiere Pro, and it will be always possible in Premiere Pro?

    In addition, audio time remapping will become possible in hearing one day?

    This looks like a very good idea.  File a feature request:

    Adobe - feature request/Bug Report Form

  • Correspondence of time remapping with ramps for video editing of first CC 2015/output

    I would like to ask experts, which will be the best workflow...

    Location:

    I have the project with 50 + video segments where I have to slow down part of the clip to highlight some details (in my case - CIRC. enduro motorcycle - need to slow down the part where is visible some technical riding etc.).

    I use bulit Premiere Pro CC 2015 in the tools of the keyframe to select two points between where I change the speed for example at 50%. First has nice handles around the keyframes where I can create smooth ramp, so the change in speed is graduated.

    Insofar as simple here s

    But the first will not do the same with audio track associated with each clip. In the audio is for his example of the motorcycle.

    I need to have his original when the video is playing at 100% speed and its different from "lower pitch" when is slowed down and once again normal sound when is 100% video speed on the end.

    So I edited each audio segment to the points of the time remap keyframes, manually set the speed of the middle section and - it s horrible. Video slows gently while it is quite annoying audio changes.

    I need to make the same effect as what we were doing with Ribbon old VCRs in television production - smooth audio ramp corresponding to the video and return to full speed.

    As my knowledge about hearing is close to zero - I would like to ask at the front to start learning - I can do up in the hearing? What I have to do it every time from scratch or can I use existing keys from first images? Anyway how above 'automatic '? What workflow you have advice when I need to do it quite often many of these clips?

    Thank you much for the help.

    P. S. tried to find out, after a while with the help chat online too...

    Most of the discussions and tutorials is very old - there may be some new features in CC 2015 in order to do compare with 2011 toolset or almost. And in many video tutorials only covered - they talk about audio at all. But for audio track that I use, is the audio very good.

    Here is an example of a part of the timeline. I needed this project to do quickly, I decided to stretch the entire audio segments to match the new length of the video. It s not correct but it sounds better then it divides in three parts with a slow speed in the middle. Just to match audio speed changes in the Panel of video editing

    time.JPG

    Not sure about the exchange of workflow with first for this type of effect.

    However the hearing can make the effect of change of speed/not very well using effects/time and Pitch/Pitch Bender. This uses a waveform envelope on with keyframes to vary the height must therefore ideal for your needs. In order to see where on the waveform, you need to place keyframes without doubt the best way is to place markers on audio in first at beginning and end of each ramp. These should be done through when you export audio in Audition where you should be able to match Pitch Bend keyframes to markers.

  • Time and expiration time timesheet question (form)

    Yes I know this question has been asked several times but I looked through dozens of examples and many shapes "Sample" in the forums are no longer available since Adobe has changed things around. I have attached the form. I need put in place where time is not given in negative numbers for example, if a person works from 21:00 to 07:00. It needs display 10 hours instead of-14 hours (as it currently is for me). I appreciate the help! There is not 'breaks' or 'dinner' etc in this. Just a calculation between time and time.

    Thank you!

    Screenshot.jpg

    Dropbox - Sheet.pdf of personnel allocation

    In TimeDiff, after this line:

    fend var = Time2Num (sTimeFormat, sEnd);

    Add this:

    If (fend

  • TimesTen jdbc batch insert a bug with CallableStatement. Batch insert parameters and inserts dublicates first parameter n times with CallableStatement.

    Hello, below batch insert has a problem with CallableStatement. But PreparedStatement(commented lines) there is no problem. Batch insert parameters and inserts dublicates first parameter n times with CallableStatement. Maybe there is a bug in the driver jdbc TimesTen (ttjdbc7.jar) or some other problem. I use TimesTen version 11.2.2.5.0 and Java 7u51.

    Help, please!

    ...
    //PreparedStatement statement = null;
    CallableStatement statement = null;
    //String sql = "INSERT INTO address_book(id, user_id, phone_number) VALUES (seq_id.nextval, ?, ?)";
    String sql = "{call add_phone_number(?, ?)}";
    try {
        //statement = getConnection().prepareStatement(sql);
        statement = getConnection().prepareCall(sql);
        for (String phoneNumber : list) {
            statement.setLong(1, userId);
            statement.setString(2, phoneNumber);
            statement.addBatch();
        }
        statement.executeBatch();
    } finally {
        if (statement != null) {
            statement.close();
        }
    }
    ...
    
    
    
    

    It is a known problem. We expect to have a fix in a future version, but there is currently no ETA that I can share with you. I recommend that you connect a SR with support so that we can follow the fact that this problem affects you.

    Chris

  • problem of remapping and time scale.

    When I play with time-remapping and go get keys to scale images do not work, anyone know why?

    Workaround solution:

    Do your time remapping in a new sequence.  Import this sequence on the main sequence, then apply the keyframes of the scale.

  • Date and time do not appear on the video captured in first Elements 9.

    Is it possible to get the timestamp to show up on the video captured from an older model mini Sony TRV18 camcorder DV?

    I can see the stamp date and time during playback of the video from the camcorder, but no time stamp appears in the clip mode capture first, or on the captured AVI file.

    I have the first Elements 9. If it is not possible in first 9, any suggestions for capture software where can I get the date stamp and time would be appreciated.

    TKS.

    This isn't a feature or a Premiere Elements.

    However, you will be able to your video using a program called DV Date stamps.

    http://Paul.glagla.free.fr/dvdate_en.htm

  • Time remapping no keyframing in first Pro CC

    I try to time remap keyframe in Premiere Pro CC 7.0.1 following the Adobe TV tutorial (which uses a version of CS6/CC before July 2013 to date) and I am unable to add keyframes directly in the timeline or adjust the speed of keyframes in the tab effects Am I missing a newer technique?  I'm on a Mac Pro, OSX 10.8.3. with graphics Nvidia Quadro 4000 card.  Thank you

    Click on the FX in the clip, and then select the time-remapping - speed effect

    Hold down the CTRL (cmd) to add keyframe on the white line of clips in the timeline panel.

    I find it easier to adjust the keyframes in the timeline.

    Help is maybe a bit clearer on that:

    http://help.Adobe.com/en_US/PremierePro/CS/using/WSb6fcde95647ddd92-1b0447d7129b9389f08-7F ff.html

    CTRL (cmd) + alt (Option) to freeze

    CTRL (cmd) + drag to reverse

  • I want to change the file name format "save under" so the date and time are first.

    When I select a few emails and then select "Save as" to keep a copy on my computer, the name of the file that is created has the date and time at the end of the file name of the email.
    Sample "save under" file name: "Habitat Follow Up - Bryan ([email protected]) - 2011-11-15 0744.eml.
    Is it possible to change the structure or format of the file name if the date and time of the email are initially the file name?

    Try ImportExportTools and customize the format of the file name in the options.

    http://chrisramsden.vfast.co.UK/3_How_to_install_Add-ons_in_Thunderbird.html

  • two dumb questions - file header and time saving

    1. How can I add a header in writing worksheet file.vi? (For now, it only stores a number of columes of data with each colume representing a single channel. "I want to put a header at the top that shows the names of the channels).
    2. can I store the date and time at which each data point is connected, as well as the data itself in a single file?

    You can open the "write to the spreadsheet File.vi", change it with a header entry that works to your liking and save it under a different name (do not overwrite the original).  Adding another table in spreadsheet String VI, a string concatination and an array of strings of entry for your headers is all that is necessary.

    As for saving the actual time for each data point, you will need to follow that with your data and add it along with the rest of your 2d data.  Write it to the File.vi spreadsheet doesn't have this built-in feature.

    Alternatively, I recommend you do the following:

    1 be sure to use the output waveform on any type of data read operation if it is available.  Familiarize yourself with this type of data complex that NEITHER is came up with, as it will really save you a lot of headaches and extra coding.  If the VI that makes your reading data does not support the type of waveform data, then you can always convert a waveform data.

    2. try to use Scripture measurement file Express VI.  You'll probably have more luck with that then write it in table vi.

Maybe you are looking for