Number of records between two dates which lasted more than a minute

I need to count the number of events/records in a single table with the dates of appointment and for how long the appointments in another table, I have two cells to hold dated (start and end dates) give a range. I want to count the number of appointments that lasted more than a minute falling into the test range.

I am sure that this is COUNTIFS and I tried to make it work.

Hope you can help.

Thank you

You could do something like that

The data table on the left and are named "Data."

Data in the table on the right.  Enter the Start Date, end Date and time Min.

D2 = COUNTIF (Data::B, "> =" & C2, Data::A, "> =" & A2, Data::A,")<>

It's abbreviation dethrone select cell D2, and then type (or Coptic and paste here) the formula:

= COUNTIFS(Data::B, ">="&C2, Data::A, ">="&A2, Data::A, ")<>

Tags: iWork

Similar Questions

  • Count the number of records between two values of keys (BTREE)

    How can I count the number of keys between two values?

    I use python driver and BTREE access method.

    = >

    Ideally, what I want is a set of whole time series data (intervals may change) to a given number of points on average. The keys are timestamps and the values are the data that it takes on average. I need to count the number of records between two timestamps so that I can divide this figure by the number of points I need and data on average. What is the best way to do it?  Or should I keep the timestamp constant intervals and use the RECNO access method?

    Thank you
    (first post btw... and why is there not a lot of people at stackoverflow that answering the questions of Berkeley DB?)

    BDB is an integrated db and there no internal counters or statistics you might grap to use for this.    You will have to do it manually.

    You can create a cursor, grap the records you want, whenever you get the next card that you bump a counter.

    If you are using RECNO, you can use a slider to obtain the number of registration (DB_GET_RECNO), and if all that you data is in

    sequentail records with no missing documents, you can find the total number of take the last rec #-original rec # + 1 to get a count.

    If you pass the SQL API, you can issue a SQL query to give you a count.  Select count (*) where...

    As you enter the data anyway, so better perhaps to count records as you go along.

    Thank you

    Mike

  • Dynamic calculation of the number of days between two dates in a table

    Hello

    I'm working on request where I dynamically calculate the number of days between two dates in a table.

    The calculation must be dynamic, i.e., when I recover the Start_date and End_date and move to the field following (call_duration) in the same row, the difference must be calculated dynamically in this area and make sure the field read-only.

    APEX version: 5.0

    Hi BO123,

    BO123 wrote:

    Hello

    I'm working on request where I dynamically calculate the number of days between two dates in a table.

    The calculation must be dynamic, i.e., when I recover the Start_date and End_date and move to the field following (call_duration) in the same row, the difference must be calculated dynamically in this area and make sure the field read-only.

    APEX version: 5.0

    one of the way to do this by calling ajax on change of end_date.

    See the sample code given below to fetch the resulting duration and making the field read only after calculation

    Step 1: Change your page

    under CSS-> Inline, put the code below

    .row_item_disabled {
      cursor: default;
      opacity: 0.5;
      filter: alpha(opacity=50);
      pointer-events: none;
    }
    

    Step 2: Create on demand Ajax process I say CALC_DURATION

    Please check Procces Ajax, see line 6.7 How to assign a value to the variable sent by ajax call

    Declare
      p_start_date  date;
      p_end_date    date;
      p_duration number;
    Begin
      p_start_date  := to_date(apex_application.g_x01);
      p_end_date    := to_date(apex_application.g_x02);
    
       --do your calculation and assign the output to the variable p_duration
      select p_end_date - p_start_date into p_duration
        from dual;
    
      -- return calculated duration
      sys.htp.p(p_duration);
    End;
    

    Step 3: Create the javascript function

    Change your page-> the function and the declaration of the Global Variable-> put the javascript function

    You must extract the rowid in the first place, for which you want to set the time, see line 2

    assuming f06, f07 and f08 is the id of the start date, and end date columns respectively, and duration

    See no line no 8 how set the value returned by the process of ajax at the duration column

    Replace your column to the respective column identifiers in the code below

    function f_calulate_duration(pThis) {
      var row_id  = pThis.id.substr(4);
      var start_date = $('#f06_'+row_id).val();
      apex.server.process ( "CALC_DURATION", {
      x01: start_date,x02: $(pThis).val()
    }, { success: function( pData ) {
    // set duration to duration column
    $('#f08_'+row_id).val(pData);
    // disable duration column
    $("#f08_" + row_id).attr("readonly", true).addClass('row_item_disabled'); }
    });
    }
    

    Step 4: choose the end date call the javascript function

    Go to report attributes-> edit your Date column end-> column-> Attrbiutes element attributes-> put the code below

    onchange="javascript:f_calulate_duration(this);"
    


    hope this helps you,

    Kind regards

    Jitendra

  • JavaScript anomaly on the number of days between two dates

    Use ApEx 4.0, I found an anomaly in a javascript code that calculates the number of days between two dates, the current_date and the past_date. If the past and present is the or before March 10, 2013, and the current_date lies between 10 March 2013 and November 3, 2013, the number of days will be from 1 day to less than the actual number. Between November 3, 2013 and on 4 November 2013, the increments of number by 2, then the count will be accurate from this date forward.

    Here are some examples:

    March 10, 2013 = 69 days of December 31, 2012
    March 11, 2013 = 69 days of December 31, 2012
    March 12, 2013 = 70 days of December 31, 2012

    November 3, 2013 = 306 days in December 31, 2012
    November 4, 2013 = 308 days in December 31, 2012

    11 March should be 70 and 12 March should be 71. November 3 is 307 and 4 November corrects the number of fake, which began March 11.

    Change the past_date to March 10, 2013 produces the following:

    March 10, 2013 = 0 days of March 10, 2013
    March 11, 2013 = 0 days of March 10, 2013
    March 12, 2013 = 1 days of March 10, 2013

    But change the past_date to 11 March 2013, product of the correct numbers:

    March 11, 2013 = 0 days of March 11, 2013
    March 12, 2013 = 1 days of March 11, 2013
    March 13, 2013 = 2 days of March 11, 2013

    I would certainly all help to determine the cause of this anomaly. Here's the javascript code:

    var w1 = ($v ("P48_PAST_DATE"));
    W1 = (w1.toString ());
    vmon var = (w1.substr (3.3));
    vyr var = (w1.substr (7));
    var r = (vyr.length);
    If (r == 2)
    vyr. = (parseFloat (vyr) + 2000);
    vday var = (w1.substr (0.2));
    var y = (vmon.concat ("", vday, ",", vyr));
    y = Date.parse (y);

    var w2 = ($v ("P48_CURRENT_DATE"));
    var vmon2 = (w2.substr (3.3));
    var vyr2 = (w2.substr (7));
    var vday2 = (w2.substr (0.2));
    var x = (vmon2.concat ("", vday2, ",", vyr2));
    x = Date.parse (x);

    var numdays = (x - y);
    numdays = (Math.floor(numdays / 86400000));
    $s ("P48_NUMBEROFDAYS", numdays);

    Did you google for something like "javascript number of days between two dates. I think you will find the explanation to this observation:

    This method does not work correctly if there is an advanced economies jump between the two dates.

    There are examples available to calculate the difference between two dates.

  • Calculate the number of days between two dates

    Hello

    Can someone help please change my formcalc script to calculate the number of working days between two date fields.  My script currently calculates the total number of days between two dates, including the weekends which must be excluded from the total.

    If

    (HasValue (Start_Date1) & HasValue (End_Date1)) then

    $

    = Date2Num (End_Date1, "YYYY-MM-DD" "en_IE") - Date2Num (Start_Date1, "YYYY-MM-DD" "en_IE") + 1

    on the other

    ""

    endif

    Any help will be most appreciated.

    Thank you.

    Check...

    (1) you said that you put the script on the event «days1» calculate My sample imitates the variable names used in the original message, "Start_Date1" and "End_Date1". If the names of variables for the start and end dates are different, you will need to modify the script to account for these names.

    (2) the Date2Num functions in the calculation of the "totalDays" use the date format "YYYY-MM-DD". If your date habits differ from "YYYY-MM-DD" FormCalc will complain.

    Steve

  • Number of Saturdays between two dates

    Hello

    How can I get number of Saturdays between two dates, including the two dates?

    for example number of Saturdays between 09/05/2014 and 10/05/2014 is five

    Help, please

    I use oracle 10g

    SQL> with t
      2  as
      3  (
      4  select to_date('05/09/2014 ', 'dd/mm/yyyy') from_dt
      5       , to_date('05/10/2014 ', 'dd/mm/yyyy') to_dt
      6    from dual
      7  )
      8   select to_char(from_dt + (level-1), 'fmDay') day_
      9        , count(*) cnt
     10     from t
     11  connect
     12       by level <= to_dt - from_dt + 1
     13    group
     14       by to_char(from_dt + (level-1), 'fmDay');
    
    DAY_             CNT
    --------- ----------
    Saturday           5
    Thursday           4
    Tuesday            4
    Friday             5
    Wednesday          4
    Monday             4
    Sunday             5
    
    7 rows selected.
    
    SQL>
    
  • Number of weeks between two dates that are in the same or different year

    Hello

    How to calculate the number of weeks between two dates?

    for example. "" "17-mar-2013' and June 27, 2013" or June 15, 2013 "and" 25-mar-2014


    Thanks in advance.

    lukx

    Hello

    Looks like your date range is incorrect.

    Please try the below.

    SQL >-front right

    SQL > select D2 - D1 "days."

    2 round ((D2-D1)/7.0) "weeks."

    3 round (Months_between (d1, d2), 0) 'months '.

    (select 4

    5 TO_DATE ('20121201', 'YYYYMMDD') D1, D2 TO_DATE ('20130116', 'YYYYMMDD')

    6 from two

    (7) date_range;

    Elapsed days weeks months

    ------------ --------- ---------

    46         7         1

  • Get records between two Dates

    Hello

    I have my structure of the table and records build here
    http://sqlfiddle.com/#! d099ef/4/7

    I would like to get the records between two dates.
    For example, I would get the records between October 1, 2001 and October 31, 2001.

    How can I get the records. Any help is much appreciated.

    Concerning

    Published by: ponic on 29 August 2012 09:42

    ponic says:

    Start       End
    4th Jul    12th Dec
    4th Jul    10th Oct
    3rd Oct   19th Nov
    3rd Oct   4th Oct
    

    I would like to have all the lines between October 1, 2001 and October 31, 2001
    If the above lines because every OCTOBER under the foregoing.

    Thank you

    Try

    select *
    from products_range
    where product_start_date <= to_date('31-oct-2001', 'dd-mon-yyyy')
    and product_end_date >= to_date('1-oct-2001', 'dd-mon-yyyy')
    

    Published by: Paul Horth on August 29, 2012 00:46

  • Dynamically calculate the number of days between two dates and amounts of split

    Hello

    I have searched for a solution for this, but had no success.
    I need to show the amounts broken down by days.

    I have a table that has an amount column and start and end dates.

    I need to write a query so that the amounts will be broken evenly based on the number of days between the start date and end date.

    For example, for this line.
    insert into my_test values (' 1, '' 3-mar-2010, ' 7 - mar - 2010 ", 1000);

    the query returns this (split $1,000 over 5 days)


    ID Date amount
    1 ' 3-mar-2010' 200,00
    1 ' 4-mar-2010' 200,00
    1 ' 5-mar-2010' 200,00
    1 ' 6-mar-2010' 200,00
    1 ' 7-mar-2010' 200,00



    create table my_test)
    ID number (10),
    start_date date,
    End_date date,
    amount number (10.2)
    );


    Select * from my_test

    insert into my_test values (' 1, '' 3-mar-2010, ' 7 - mar - 2010 ", 1000);
    insert into my_test values (2, 10-mar-2010 ", 19-mar-2010", 2000);
    insert into my_test values (3, 20-mar-2010 ',' 21-mar-2010, 5000);



    Thanks in advance.

    Hello

    One way is to join a Meter of Table , a table, or (more often) a set of results includes a line for eery number 1, 2, 3,... until the maximum number of times you need to divide a line.
    For example:

    WITH     cntr     AS
    (
         SELECT     LEVEL - 1     AS n
         FROM     (  SELECT  MAX (end_date - start_date)     AS max_day_cnt
                 FROM        my_test
              )
         CONNECT BY     LEVEL <= 1 + max_day_cnt
    )
    SELECT       t.id
    ,       t.start_date + c.n                    AS dt
    ,       t.amount / (t.end_date + 1 - t.start_date)     AS amt
    FROM       my_test      t
    JOIN       cntr            c     ON     c.n <= t.end_date - t.start_date
    ORDER BY  id
    ,            dt
    ;
    

    This assumes that all dates have the same number of hours, minutes, and seconds, as is the case in your sample data.
    If this isn't the case, then use TRUNC (start_date) and TRUNC (end_date) instead of start_date and end_date or post some sample data and results if some lines do not represent a whole number of days.

  • Why my "Downloads" folder lasts more than five minutes to load? (Probably due by MSE)

    I have a very big downloads folder:
    5 419 files
    759 files
    30.0 GB

    I prefer to keep both as - is; However, recently it has started to take several minutes to load in Windows Explorer. Basically whenever I select the folder (either directly under my account user, either by a "Favorites" link), this green progress bar appears in the path box at the top... He continued slowly for a few minutes until what he finished. The real problem that is boring is that, while it is loading, I can't find (indexed), sort, or do anything. (The cursor shows that it is 'work'). In addition, it happens everytime I go in this directory!

    I'm pretty sure that the problem is with Microsoft Security Essentials. Under the resource monitor, subheading 'disc', dozens, or even hundreds of lines appear with the image of MsMpEng.exe (engine of Microsoft Security Essentials), probably one for each file in my downloads folder. In addition, I have confirmed that the problem disappears if I exclude this directory in MSE. However, I of course want to keep the downloads folder (which is probably the most important record to analyze new elements that I upload them!)

    Finally, I must point out that the column 'Date of access' is updated to the current date/time for about 1/3 of the files and all subfolders. I can't find a pattern for which files have their set "consulted" to date; However, none of these values are more than a month (although I certainly do not have access to many of these files for years.) (I.e. all my files are 'accessible' either immediately or in the past month.)

    Most likely, something to mark these files as 'dirty' every time - I access this folder, so pull up the re antivirus engine - check everything. Anyone know what could be the cause? Is that what I can do besides excluding this MSE folder?

    Thank you very much in advance for your help!
    MikeY

    So, how does it work if you uninstall MSE?

    You can allways then reinstall it

    UPDATE (29/07/2012) (SEE BELOW, NOT QUITE RESOLVED.  :()
    As expected, since excluding the 'downloads' folder of the MSE has worked, uninstall MSE also worked. However, I like MSE and want to analyze my downloads folder ;)
    UPDATE: I think I thought of her! In this case, I was running "Process Explorer" (Sysinternals) on Windows startup and pretty much all the time. Thinking that MSE could be analysis all programs that are running, I moved procexp.exe to another folder and set it at the start of this version.
    Once I did, MSE now allows me to open the file downloads without re - check everything.
    My life-lesson from this: If you run an executable file, make sure it is in a different directory other random files, otherwise MSE will constantly check their.
    Thanks for all your help!
    I will update this as "resolved" in a few days when I am sure that it really worked and it is not a chance.
    MikeY
    UPDATE (29/07/2012) :(
    Unfortunately, I see a few problems. First off, while moving ProcessExplorer for this directory he stopped the analysis of each file, each time, I opened the file, it always scans the first time I open the directory each tile. Only after waiting five minutes the first time I can then move freely in this directory. Of course, this is not ideal.

    I did some follow-up work on this:

    • I completely uninstalled MSE. Obviously, it worked. However, I then installed the antivirus NOD32. Guess what? It still freezes when opening the downloads folder! This time, instead of the hundreds of lines of "MsMpEng.exe" - billing in the resource monitor, I see hundreds of lines "ekrn.exe! (I.e., it does the same thing!)
    • I actually just moved into a new downloads folder. I found that can be summed up these kinds of folder names. (I.e., I was able to have a new folder that is displayed when I select "[UserName] / downloads.") In other words, when you download things, it appears exactly the same thing, I'm just getting started with a new directory. However, even if the library and the user subpath now point to the new folder, I change not the absolute path to my old files directory. This way I can keep the countless maps/executable shortcuts, etc. in this mega-file.

    I still think I've hit on something fundamental here. I hope I've learned why I'm causing AV systems across this large number of files, hay son as he shouldn't be testing of thousands of files that haven't changed.

    Thanks again!
    MikeY
  • Number of days between two Dates in the Correct month

    I am trying to write a SELECT statement that returns the number of days spent on a project.

    Here's my problem. I have a table with several columns of date (start_date, end_date, etc.) as well as several other columns. Here is an example of the table.

    PROJECT... START_DATE... END_DATE
    123 ................. 1ST JANUARY 13... 15 JANUARY 13
    456 ................. 25 JANUARY 13... FEBRUARY 5, 13
    789 ................. 30 JANUARY 13... FEBRUARY 5, 13
    999 ................. 1ST FEBRUARY 13... FEBRUARY 8, 13

    I'm counting the number of days spent on projects in each month. For example, with the above data, I would come back...

    MONTHS... PROJECT_DAYS
    Jan ............. 24
    Feb ............. 18

    I tried to use a CASE statement, but I'm having a hard time to understand. Any help would be greatly appreciated!

    Published by: 987079 on February 8, 2013 13:12

    An option would be something like

      1  with project as (
      2    select 123 project_id, date '2013-01-01' start_date, date '2013-01-15' end_date from dual union all
      3    select 456, date '2013-01-25', date '2013-02-05' from dual union all
      4    select 789, date '2013-01-30', date '2013-02-05' from dual union all
      5    select 999, date '2013-02-01', date '2013-02-08' from dual
      6  ),
      7  all_days as (
      8    select start_date + level - 1 dt
      9      from (select min(start_date) start_date,
     10                   max(end_date) end_date
     11              from project)
     12   connect by level <= end_date - start_date + 1
     13  )
     14  select trunc(dt,'MM'),
     15         count(*)
     16    from all_days ad
     17         join project p on (ad.dt between p.start_date and p.end_date)
     18   group by trunc(dt,'MM')
     19*  order by trunc(dt,'MM')
    SQL> /
    
    TRUNC(DT,'MM')        COUNT(*)
    ------------------- ----------
    2013-01-01 00:00:00         24
    2013-02-01 00:00:00         18
    

    Justin

  • Behavior of days between two dates

    Hello!
    If anyone can help? ... with differences in Date? :

    All I want is to calculate the number of days between two dates:

    InitDate has been entered as 01/10/2010 planning, to recover is 20101001
    HireDate was entered into the 1980-10-01 planning, to recover is 19801001

    I tried

    NumDays = @DATEDIFF (InitDate, HireDate, DP_DAY);

    but give me only 0 and -1.



    When I try the regular difference:

    NumDays = InitDate - HireDate;

    He returned to 30,000 (which in the example is 20101001-19801001) - which should not.


    I use Essbase/Planning 11.1.1.2, I tried also to break dates in years and months using INT and operations, but when I want to get the calendar days he is ugly. The two dates live in the same block.

    Someone at - it an idea?

    Thank you very much!

    Hello
    Here's a piece of code in my trunk of code which may help you. This assumes you have string CDF pack (https://www.samplecode.oracle.com/tracker/tracking/linkid/prpl1004/remcurreport/true/template/ViewIssue.vm/id/S441/nbrresults/9)

    var y1, y2, m1, m2, d1, d2, difx1, difx2;

    FIX (SOLUTION YOUR MEMBERS HERE)
    "BLOCK MEMBER")

    Y1=@round ("Date of 1" / 10000,0);
    Y2=@round ("Date 2" / 10000,0);
    M1=@round (("Date 1"-y1*10000)/100, 0);
    M2=@round (("Date 2"-y2*10000)/100, 0);
    D1 = ' Date of 1 "-(y1*10000+m1*100);"»
    D2 = "Date 2"-(y2*10000+m2*100); "»

    difx1=@TODATEEX ("mm/dd/yyyy",
    @JconcatStrings (@LIST (@JgetStringFromDouble (m2,@_false,@_false), ' / ', @JgetStringFromDouble (d2,@_false,@_false), ' / ', @JgetStringFromDouble (y2,@_false,@_false)))
    )
    ) ;
    difx2 = @TODATEEX ("mm/dd/yyyy", @JconcatStrings (@LIST)
    @JgetStringFromDouble (m1,@_false,@_false), ' / '.
    @JgetStringFromDouble (d1,@_false,@_false), ' / '.
    @JgetStringFromDouble (y1,@_false,@_false))
    )
    );

    diff=@DateDiff (difx2, difx1, DP_DAY);
    )
    ENDFIX

    See you soon,.
    Alp

  • County of days between two dates without weekend

    Hello
    I need a solution in the query or another thread, which returns the number of days between two dates without considering the weekend (Saturday and Sunday), I have a column of type Date, and return need in the form of a column HH hours and days in another column.

    Concerning
    Jonas

    Hi and welcome to the forum.

    Don't forget you can do a search on this forum.
    Your question has been asked before.

    Some other tips:

    http://asktom.Oracle.com/pls/asktom/asktom.download_file?p_file=6551242712657900129
    http://asktom.Oracle.com/pls/asktom/f?p=100:11:0:P11_QUESTION_ID:185012348071

  • Calculate the (age) years between two dates

    Nice day!

    I have not been able to find an answer, that I was able to use in the archives or online and would be very grateful for the help.  I'm working with Adobe Acrobat Pro XI (not LiveCycle) and I have very little experience with programming (for the most part, copy / paste).

    I need to create a text box that calculates the number of years between two dates entered, i.e. the age when the date of birth and death are given.  Also, would be nice if she was a Virgin until the two were provided.  Anyone would be able to give me the code I need to put in the custom calculation script?

    Once again, any help would be much appreciated!  Thank you and have a wonderful day!

    For the fields for Date of birth DOB and DOD for the Date of death and age in complete years both by using a'd-mmm-yyyy' date format you can use a custom calculation to the JavaScript for the field of age as:

    function GetField (cName) {}
    get the field with error trapping object;
    oField var = this.getField (cName);
    test error;
    if(oField == null) app.alert ("error during the" + cName, 1, 0);
    Returns the field object;
    return oField;
    } / / end GetField function;

    function {Scand (cFormat, cString)
    using date string format convert object date;
    convert string to date using format;
    Kai var = util.scand (cFormat, cString);
    the value null is an error of conversion;
    if(oDate == null) app.alert ("Conversion error" cString "by using the format" + cFormat, 1, 0);
    date of return;
    Return to oDate;
    } / / end Scand function;

    clear the value of the field;

    Event.Value ="";
    get data dob and dod;
    var oDOB = GetField ("DOB");
    Var o = GetField ("DOD");

    treat only if DOB and DOD have value and are not null;
    If (oDOB! = null & o! = null & oDOB.value! = "" & oDOD.value!) = "") {}

    convert the DOB and DOD to date objects.
    oDOB var = util.scand ("d-mmm-yyyy", oDOB.value);
    O var = util.scand ("d-mmm-yyyy", oDOD.value);

    get the difference over the years;
    var Age = oDOD.getFullYear () - oDOB.getFullYear ();

    adjust for month of previous DOD DOB;
    If (oDOD.GetMonth)< odob.getmonth())="">

    adjust the DOD before DOB date in the month of birth;

    If (oDOD.GetMonth () == oDOB.getMonth () & oDOD.getDate ())< odob.getdate())="">
    Set the value of the field;

    Event.Value = Age;
    }

  • Request for between two dates.

    Hello

    I have a date column and I want to choose the records between two dates, the output of this column is: 19/08/2003-02:11

    My query is:

    SELECT THE POINT DTM
    WHERE DTM BETWEEN JULY 1, 2012 "-JULY 15, 2012"

    Help, please.

    Thank you

    >
    I have a date column and I want to choose the records between two dates, the output of this column is: 19/08/2003-02:11

    My query is:

    SELECT THE POINT DTM
    WHERE DTM BETWEEN JULY 1, 2012 "-JULY 15, 2012"

    Help, please.
    >
    Help with what? You do not have a question or indicate if you have a problem any.

    Do you need to know how to use TO_DATE instead of literals in the WHERE clause?

    SELECT DTM FROM ITEM
    WHERE DTM BETWEEN TO_DATE('07/01/2012', 'MM/DD/YYYY') AND TO_DATE('07/15/2012', 'MM/DD/YYYY');
    

Maybe you are looking for