What is the value of the start date, date in the end QueryAvailablePerfMetric method?

The method QueryAvailablePerfMetric in the Performance Manager management entity has optional intervalId beginTime, endTime parameters.

What is the difference in values returned by this method when the start and end dates are excluded?

In my case, I see the same data.

Because I do not think that same intervalId can we have different PerfMetricIds in a VMWare host, or is it not true?

In the case of unmanaged ESX systems are provided only on statistics in real time for the current day.

Statistics of sending hosts the vCenter Server system managing managed. The vCenter Server gathers statistics

data performance of all systems ESX/ESXi that it manages and stores the information in its database, which constitute historical data.

On the specification of begineTime and end in the spec would ensure only the metrics available in the specified period are gathered, if it makes a request for historical measures. These parameters will be not applicable for statistics in real time.

Tags: VMware

Similar Questions

  • What is the end of support date Windows XP SP3

    What is the end of support date Windows XP SP3

    End of extended support:

    April 8, 2014

  • What is the alternative download method

    You need to reinstall because of hardware failure. Which method is best, download manager or the alternative download method? How are they different?

    Hi Bonemanpete,

    The installation file is the same regardless of the mode of download.

    What Adobe software are you looking for and what version?

    Thank you

  • What is the most modular method to create a 'plan' generated automatically?

    I have a 'plan' that I am currently building a test at the beginning. My "plan" consists of 3 levels of the Organization; the unit, the Group and the arrangement.

    There are a few types of units that I intend to create, but I'm looking for only a few basic methods; I can shake the details in regards to specific controls, resizing, positioning, etc.

    There may be<= 4="" units="" per="">

    There are 4 positions in each arrangement; one for each possible unit.

    There may be<=20 groups="" in="" the="">

    There is only a single arrangement; the arrangement is the entire floor plan.

    Each unit is composed of some Boolean LEDs, progress bars, graphs of waveform and digital indicators.

    Each group is simply an arrangement of units; with an indicator of string as a label.

    The arrangement (floorplan itself) is just an arrangement of groups.

    I considered simply create typedefs for each control so that I can change or resize each if necessary control and have the changes automatically cascading, but is there a way for me to create a typedef for each unit, although it contains several controls? Within the unit, all controls will have a size and position, so it would be nice to be able to resize and rearrange the controls in the unit and have all these changes cascade to all units. It would also avoid having to define the positions of each control for each unit (I could just define the position of each unit).

    I've attached a screenshot of the arrangement (floorplan) .jpg because it currently displays. You can see that inside, there are 8 groups (labeled SX #) and 4 groups of different type (labelled RC #). Within each group, SX, there are 3 units (with a color box gray placeholder where a 4th unit could display).

    I know my questions can be very basic and obvious to experts on this forum, but I have very little training LV, so I am left to my own here.

    Thank you for taking the time to read my message; I hope it is at least as clear as mud.

    You can create a definition of a cluster type and a cluster can contain several data types.  That answer your question?

  • What is the end of FireFox to life support policy

    For example, how long can I get support for FireFox 39? I'd like to see if possible for all versions.

    It is the only ESR and will be replaced by Firefox 45 next year

  • End date must CLEARLY not less than the start date, else it

    Hello

    I put DATE of BEGINNING of THE CONTRACT and END of CONTRACT fields on the form. These 2 objects (DateTime objjects), I pulled game tab of the palette and fell on my layout, fine design.

    Now, I try to put a validation than the end dat eshould not lower than the beginning, so I had a thread as below from Niall.

    http://forums.Adobe.com/message/1909551

    and I've done my coding FormCalc to the OUTPUT of the END DATE field as event title below,

    Please note that FormCalc
    End date must not less than the start date, else CLEAR-Begin

    var ACE
    var endDate

    As = xfa.resolveNode ("CUSTOMER..") RawValue Page31_Contracts.Con_Whole_Page.CON_Basic_Info.CON_START_DATE")
    endDate = xfa.resolveNode ("CUSTOMER. Page31_Contracts.Con_Whole_Page.CON_Basic_Info.CON_END_DATE") GLR awValue

    If (ACE > endDate) then
    xfa.host.messageBox ("end date is less than the departure date! End date is allowed")
    xfa.resolveNode (the "CUSTOMER". Page31_Contracts.Con_Whole_Page.CON_Basic_Info.CON_END_DATE") GLR awValue = null
    endif

    End date must not less than the start date, else CLEAR-end

    I tried to VALIDATE, calculate, change events of END DATE, but nothing works!

    Can pls. Let me Kow how I optimize my requirement? I'm anewbie,

    Thank you

    If you use the exit event, you will likely have the same code on the date fields beginning and end, because they have an addiction to each other. Maybe better try the validate end date event, so that if a field is changed the event is fired. You can try the following to validate the event

    // Pls. note this FormCalc
    // End date should not less than Start date, else CLEAR it - Begin
    
    var stDate
    var endDate
    
    stDate = CON_START_DATE.rawValue
    endDate = $.rawValue
    
    if ( HasValue(endDate) ) then
        if (stDate > endDate) then
            xfa.host.messageBox("End date is lower than Start date! End date is cleared")
            $.rawValue = null
        endif
    endif
    1
    // End date should not less than Start date, else CLEAR it - End
    
  • Increment Dt start with day greater than the Dt at the end of the year Prev in Pro * C

    Morning people and greetings from Toronto.

    I'm trying to change a Pro * C program. Since ages I touched a Pro * C program but I have made an attempt for her. I would probably need some help andhopefully is the right forum I could nto seem to find any section decicated Pro * C programs.

    Here's what its supposed to do. I'm supposed to check if a Start Date of overlap between the start dates and dates from the end of the previous year, and if so, I'm supposed to assign one day Start Date greater than the Date of the end of the previous year.

    I have a control panel that stores records for start date and end Date for each year. Here's what I have for 2010.

    Start date = 8 May 2010 '; End date = may 12, 2011 'year =' 2010 From now the previous record in the table 1 (where the new record is supposed to be inserted) has a record that looks like this:
    DOC_ID     NAME               YEAR         START_DATE     END_DATE
    ------------------------------------------------------------------------------------------------
    999999     Mary Poppins      2009         03-May-2009      08-May-2010
    Now, based on the control table, the Start Date for 2010 coincides with the Date of the end of 2009. In this case, I would need to move the start date = may 9, 2010 "(Date of end + 1)

    Here is my ProC program in hand
    /* Include Headers */
    #include <stdio.h>
    #include <stdlib.h>
    #include <string.h>
    #include <ctype.h>
    #include <math.h>
    ---------------------------
    /* Define constants */
    ---------------------------
    #define  nullterm(string) string.arr[string.len] = '\0';
    /* SQL Host Variables */
    exec sql begin declare section;
    exec sql include sqlca;
    
     varchar   ctrl_start_date[11];
     short     ctrl_start_date_ind;
     varchar   ctrl_end_date[11];
     short     ctrl_end_date_ind;
    
     varchar   end_date[11];
     short     end_date_ind;
    
     int       exist_end_date_flag;
     short     exist_end_date_flag_ind;
    
    exec sql end declare section;
    
    
    /* Function Prototypes */
    
    void check_date_overlap();
    
    
    void main(int argc, char *argv[])
    {
    /* Coding starts here */
    
    void get_ctrl_dates()
    {
     exec sql
      select  to_char(trunc(ctrl_start_date),'YYYY/MM/DD'),
              to_char(trunc(ctrl_end_date),'YYYY/MM/DD')
      into    :ctrl_start_date :ctrl_start_date_ind,
              :ctrl_end_date  :ctrl_end_date_ind
      from    control_tb
      where   current_yyyy = :year_number;
    }
    
       check_date_overlap();
    
       if (strcmp( (char *)run_mode.arr,"N")==0)
       {
        check_date_overlap();
        create_person_rec(); /* This will insert record into person_tb table */
       }
    }
    
    /***********************/
    /* CHECK_DATE_OVERLAP  */ 
    /***********************/
    void check_date_overlap()
    {
    
     exist_end_date_flag = 0; /* assume he does not have a record */
    
     exec sql
      select count(*), end_date + 1
      into   :exist_end_date_flag exist_end_date_flag_ind,
             :end_date :end_date_ind
      from   person_tb
      where  doc_id = :doc_id
      and (( :ctrl_start_date between start_date  and end_date ) or
           ( :ctrl_end_date   between start_date  and end_date ) or
           ( start_date between :ctrl_start_date  and :ctrl_end_date ) or
           ( end_date   between :ctrl_start_date  and :ctrl_end_date ))
      and    year_number = (:year_number - 1)
      group by end_date
      having count(*) = 1;
    
      /*** Error Check Routine goes in here ***/
    
      /* Overlapping of dates; Set the Start Date equal End Date + 1 to avoid overlap */
      if (exist_end_date_flag == 1)
      {
       print_to_err_file("The Start Date is overlapping with a previous period.",0);
      }
    
       nullterm(end_date);
    
    } /* check_date_overlap */
    Here would be my question:

    My question is, should the SQL above be written like this instead?
    /***********************/
    /* CHECK_DATE_OVERLAP  */ 
    /***********************/
    void check_date_overlap()
    {
    
     exist_end_date_flag = 0; /* assume he does not have a record */
    
     exec sql
      select count(*), end_date
      into   :exist_end_date_flag exist_end_date_flag_ind,
             :end_date :end_date_ind
      from   person_tb
      where  doc_id = :doc_id
      and (( :ctrl_start_date between start_date  and end_date ) or
           ( :ctrl_end_date   between start_date  and end_date ) or
           ( start_date between :ctrl_start_date  and :ctrl_end_date ) or
           ( end_date   between :ctrl_start_date  and :ctrl_end_date ))
      and    year_number = (:year_number - 1)
      group by end_date;
    
      /*** Error Check Routine goes in here ***/
    
      /* Overlapping of dates; Set the Start Date equal End Date + 1 to avoid overlap */
      if (exist_end_date_flag == 1)
      {
        /* Is this even correct or would I have to do a strcpy?.
            Also note that I am overwriting ctrl_start_date which
            was fetched earlier in get_ctrl_dates() */
       ctrl_start_date = end_date + 1;
       print_to_err_file("The Start Date is overlapping with a previous period.",0);
      }
    
       nullterm(end_date);
    
    } /* check_date_overlap */
    Published by: Raj404261 on June 10, 2009 11:21

    You can put your code between the {code}

    As
    {code}
    your code...
    ...
    {code}

    SS

  • What is the best method to move from an iPhoto from one Mac to another library?

    What is the I best method for export/transfer my iPhoto on MBP to the iPhoto library library on my iMac? I prefer to keep my metadata intact; I guess that to do a package contents 'show' of my iPhoto and AirDropping the 'masters' library, I won't lose it? I'm under El Capitan 10.11.4 on Mac.

    I just want to explain my situation because maybe I'm missing something. I have SUMMER will use the photo library iCloud for synchronization on all my Apple devices and as a backup off-site. Fortunately, I realized soon as enough it would become a management NIGHTMARE. I downloaded everything from iCloud to my MBP and want to get it all on my iMac, so I can clean up the mess of duplicates and others.

    I couldn't synchronize with realism of the iCloud photo library to my iMac because I would have had to download about 150 + GB of data, so that I can download the 30 or GBs who were on my families iOS devices iCloud and the MBP. ICloud photo library interface is NOT well designed or easy to use - download directly from the cloud is heavy at best.

    All tips are appreciated, thanks.

    Simply connect the two Macs together and drag the library in the pictures of the new mac folder - or use an external hard drive to the Mac OS extended (journaled) format and drag through - then launch iPhoto on the new system

    Move the masters moves original photos and metadata exactly as they were imported without organization

    And iCloud library isn't an option for iPhoto - it requires OS X 10.10.1 and photos 1 or later version

    LN

  • What is the best method to find the length of a series in xml format.

    What is the preferred/better method to get the 'length' of a set of xml nodes? Currently I use a "for in" loop and using the value of variable end. This works very well, but seems inelegant, inefficient. Any opinions? suggestions?

    Thank you

    M.

    Something like this:

    public void xmlParser(myData:XML)
    {

    var listItems:XMLList = myData.listItem;

    var len:int = listItems.length ();

    creates two tables
    for (var j: uint = 0; j <=> len; j ++) {}
    masterArray [j] = listItems [j]
    flexArray [j] = listItems [j]
    }

    addListeners();
    listLoader (flexArray);
    }

  • What is the best "web form" spam blocker?

    I am designing a website with a "contact us" page and want to make sure that I don't get a lot of mail to spam it.

    What is the best software/method to use with Mac 10.5 and Dreamweaver CS4?

    In addition to good advice of the bemdesigns, you could also do a search on google for the method of 'honey pot '.  Use an invisible form field to trap spam...

    I had a link, but I've lost now, but I'm sure you'll find some info on by Googling.

    Also check out some of the conversations on the method here:

    http://groups.Google.com/group/Macromedia.Dreamweaver/search?group=Macromedia.Dreamweaver& q = honeypot & qt_g = search + this + group

    --

    Nadia

    Adobe® Expert community: Dreamweaver

    Unique templates CSS | Tutorials | SEO articles

    http://www.DreamweaverResources.com

    http://csstemplates.com.au/

    --------------------------------------------------

    http://Twitter.com/nadiap

  • Continuous start date and end date

    Hello

    I'm currently building a SQL query to get the min (start date) and max (end date) of the below dataset. The trick here is to consider the date min and max, if it is continuous otherwise are indicated separately. 1 January 01 is also the date of default null value in the system which is equivalent to 31-dec-2999.

    Set of input data

    MPRid METid START_DATE end_date
    ---------------------- ---------------------- ------------------------- -------------------------
    13940003 128127878 18 March 2008 March 19, 2008
    13940003 128127878 19 March 2008 March 27, 2008
    13940003 128127878 27 March 2008 1 January 01
    13940003 50368431 October 1, 1995 December 29, 1995
    13940003 50368431 29 December 1995 March 21, 1996
    13940003 50368431 March 21, 1996 February 22, 1997
    13940003 50368431 22 February 1997 December 18, 2001
    13940003 50368431 18 December 2001 March 11, 2008
    13940003 50368431 14 March 2008 March 15, 2008


    Expected results

    MPRid METid START_DATE end_date
    ---------------------- ---------------------- ------------------------- -------------------------
    13940003 128127878 18 March 2008 1 January 01
    13940003 50368431 1 October 1995 March 11, 2008
    13940003 50368431 14 March 2008 March 15, 2008

    I tried with partition but not getting is not the expected results. Looks like something wrong in the query. All suggestions will be of great help to me.

    Select mprid, metid
    min (start_date) start_date
    max (end_date) end_date
    from (select mprid, metid
    start_date
    decode(end_date,'01-Jan-0001','31-Dec-2999',end_date) end_date
    max (grp) on maxgrp (partition mprid, metid start_date order)
    from (select mprid, metid
    start_date
    End_date
    case lag (end_date) over (partition mprid, metid start_date order)
    When start_date then null
    rownum else
    end grp
    of table_mpc
    where mprid in (13940003) and metid is not null
    )
    )
    Mprid group, metid
    maxgrp
    order of mprid, start_date

    Thanks for looking in this query.

    Concerning
    Deborah

    Here's one way:

    with my_tab as (select 13940003 mprid, 128127878 metid, to_date('18-Mar-2008', 'dd-Mon-yyyy') start_date, to_date('19-Mar-2008', 'dd-Mon-yyyy') end_date from dual union all
                    select 13940003 mprid, 128127878 metid, to_date('19-Mar-2008', 'dd-Mon-yyyy') start_date, to_date('27-Mar-2008 ', 'dd-Mon-yyyy') end_date from dual union all
                    select 13940003 mprid, 128127878 metid, to_date('27-Mar-2008', 'dd-Mon-yyyy') start_date, to_date('01-Jan-0001 ', 'dd-Mon-yyyy') end_date from dual union all
                    select 13940003 mprid, 50368431 metid, to_date('01-Oct-1995', 'dd-Mon-yyyy') start_date, to_date('29-Dec-1995 ', 'dd-Mon-yyyy') end_date from dual union all
                    select 13940003 mprid, 50368431 metid, to_date('29-Dec-1995', 'dd-Mon-yyyy') start_date, to_date('21-Mar-1996 ', 'dd-Mon-yyyy') end_date from dual union all
                    select 13940003 mprid, 50368431 metid, to_date('21-Mar-1996', 'dd-Mon-yyyy') start_date, to_date('22-Feb-1997 ', 'dd-Mon-yyyy') end_date from dual union all
                    select 13940003 mprid, 50368431 metid, to_date('22-Feb-1997', 'dd-Mon-yyyy') start_date, to_date('18-Dec-2001 ', 'dd-Mon-yyyy') end_date from dual union all
                    select 13940003 mprid, 50368431 metid, to_date('18-Dec-2001', 'dd-Mon-yyyy') start_date, to_date('11-Mar-2008 ', 'dd-Mon-yyyy') end_date from dual union all
                    select 13940003 mprid, 50368431 metid, to_date('14-Mar-2008', 'dd-Mon-yyyy') start_date, to_date('15-Mar-2008 ', 'dd-Mon-yyyy') end_date from dual),
        -- end of mimicking your data into a table called "my_tab"
        results as (select mprid,
                           metid,
                           start_date,
                           decode(end_date, to_date('01/01/0001', 'dd/mm/yyyy'), to_date('31/12/2999', 'dd/mm/yyyy'), end_date) end_date,
                           case when start_date != lag(end_date) over (partition by mprid, metid order by start_date, end_date)
                                     or row_number() over (partition by mprid, metid order by start_date, end_date) = 1
                                     then row_number() over (partition by mprid, metid order by start_date, end_date)
                           end grp
                    from   my_tab),
      final_res as (select mprid,
                           metid,
                           start_date,
                           end_date,
                           last_value(grp ignore nulls) over (partition by mprid, metid order by start_date, end_date) grp
                    from   results)
    select mprid,
           metid,
           min(start_date) start_date,
           decode(max(end_date), to_date('31/12/2999', 'dd/mm/yyyy'), to_date('01/01/0001', 'dd/mm/yyyy'), max(end_date)) end_date
    from   final_res
    group by mprid, metid, grp
    order by mprid, metid, start_date;
    
         MPRID      METID START_DATE END_DATE
    ---------- ---------- ---------- ----------
      13940003   50368431 01/10/1995 11/03/2008
      13940003   50368431 14/03/2008 15/03/2008
      13940003  128127878 18/03/2008 01/01/0001
    

    Published by: Boneist on December 11, 2009 11:44
    (corrected for 1 St-Jan-0001 I missed!)

  • Decision-making support and at the end of the Summit of life

    Hello

    I'm looking for information on the Oracle website, I don't think "easily"...

    What are the end support and life for 3.2.1 and 4.2.6 APEX?

    Thanks in advance for those who have the answer...

    Concerning

    rlebret wrote:

    I'm looking for information on the Oracle website, I don't think "easily"...

    Seems easy enough to find: Google 'oracle support lifecycle apex' and it is contained in the top hit...

    What are the end support and life for 3.2.1 and 4.2.6 APEX?

    .. which shows that the first 3.2 support ended in February 2012 and support to 4.2 ends in October 2017.

  • Changing the content ID method

    Hi all

    What about the content ID of the content whether active documents/web or etc.

    During export/import content, is there a way to change the content ID to something else batch and no severance of the relationship with the Site that use web/content or other assets?
    for example. Initial content for content ID is ABC_XXXX01 XYZ_XXXX01where ABC and XYZ view the prefix and the XXXX01 is to refer to the sequence number

    Or what is the common/practice method to change the content for an entire site id?

    Thank you

    Or what is the common/practice method to change the content for an entire site id?

    In general, archive them is option one here - you should be able to define export/import content items and to define the logic of transformation as part of it.

    I don't know everything, if it maintains the link also to WCM objects. For example,.
    -you have a static list, referring to a piece of content, which now has a new ID, or
    -you have a region assigned to a content element, now with a new code.

    It should be relatively easy to identify.

    UCM 11 g since, I think, PS3, also contains an export/import feature a Web site. So, you could also try this one.

  • What is the minimum value for the data type double?

    ... a more academic question: what is the minimum value of the data type double? I thought 'double', it is the 8-byte IEEE standard and what I remember, it's + - 1.7E + - 308.  The more different number of 0 should be 1.797E - 308.

    This is why I was a little surprised when I looked at the data output of my calculation of CVI, where I found the numbers with exponents of E-319 or E-324 as the smallest value...

    But I'm sure there's an explanation :-)

    Thank you for sharing with me,

    Wolfgang

    The largest number is indeed the order of + 1.7E + 308; There are a smaller number of - 1.7E + 308. Note that this is in fact the most negative number, which is the smallest by some reckoning. For the small beach of the Exhibitor, things get a little more complicated. 1E-308 can be represented with complete accuracy and resolution, but if you're willing to lose a few bits of precision, you can go down even further. For example:

    Double x, y, z:

    x = 1E-300;

    y = 1E7;

    z = x / y;               Give 1.000000000000000E - 307

    y = 1E8;

    z = x / y;               Give 9.999999999999999E - 309

    y = 1E18;

    z = x / y;               Give 9.999987484955998E - 319

    y = 1E23;

    z = x / y;               Give 9.881312916824931E - 324

    So, as you can see, values less than 1E-308 are possible, but they become increasingly more inaccurate and should not be relied upon.

    JR

  • What is the range of values of type of data accepted by prepareBulk file?

    In the Oracle documentation under "bulk 7.12 load graphics Using RDF Semantic support for Apache Jena", I see the code example for perpareBulk. The third parameter is documented as "type of data file: can be RDF/XML, N-TRIPLE, etc.". I found a thread code example that uses "TTL." as a value as well. It seems that "TTL" is accepted but not documented. What is the range of accepted values for the type parameter of data to prepareBulk file?

    Hello

    You can use the triple data serialization format following as string values:

    "RDF/XML", "N-TRIPLE", "TURTLE" (or "TTL") and "N3".  "RDF/XML-ABBREV" is a synonym for "RDF/XML".

    For the quads, you can use either "N-QUADS" or "TRIG".

    Thank you

    Zhe Wu

Maybe you are looking for

  • Tornado diagram

    Dear members, I want to create a Tornado diagram with Apple numbers. I did some research on google, but practically everything I got is linked to Excel. Any info or links in this regard would be helpful as to how I create a diagram of tornado with ap

  • Satellite P770-109 not always start

    I got a P770-109 for a few months and it's a great laptop, but in recent weeks, there seems to be an intermittent problem with it starts not, almost as if the switch does not record the pressure of my finger. Has anyone encountered this?Is this a kno

  • 17600 Runtime error code

    Hello I get an annoying runtime error when you try to run my sequence file. the error is: Unable to load the 'T:\ATE\TS-e-Detect\e-Detect CAT2 Status.vi' VI in the version of "13.0.1f5" LabVIEW runtime engine (I've also attached a picture of the full

  • How locate you a document 'lost' in works that is clearly visible in the history of the Microsoft Word processor?

    I have a document which is "read-only" in the history of my processor I want to remove or at least 'clear' manually. "When I "Browse" to the document so I can change read-only, I am unable to locate him, even though he is clearly visiblein my story. 

  • WRT120N does not accept my ID / password when you are using a linux (mint box)

    I have a LAN House running boxes with different OS. "I can connect to my router, a WRT120N with no problems to http://192.168.1.1 from runing android Tablet and an old box of Windows XP, but when I try my main desktop, Linux Mint, (browser Firefox. 1