11.1.2 batch Scheduler suck 99% CPU

Someone of another meeting in 11.1.2 Batch Scheduler suck 99% of the web server CPU? It isn't when Batch Scheduler works it's when you try to access it from the workspace. We are on Windows 2008 SP2 on three servers (Web, DB and reports)

JTS

Problem solved discovered that Java heap for the service FRReporting sizes is bad at 128 M to 512M it obviously had to be increased to make it work.

JTS

Tags: Business Intelligence

Similar Questions

  • Multi Slide Slider control is sucking cycles cpu

    This is a control (see attachment) it is simply in the presence on a façade sucks 25% cpu on my machine.  She seems to be the 3 slider slide that is causing the problem.  I find that I can replace the control (it starts as a Horizontal Point silver slide) and he moved up to the next time that the vi is still loaded into memory.  Anyone seen this before? FYI - I created this control so that it appears as a data type of cluster with 3 digits, the first being the visible cursor, which is the present value, the second digital being the lower limit and the third being digital upper limit.

    Found a solution!  The problem was caused by coloring the first two transparent cursors.  If I customize the cursor and move the first two sliders upward and out of Visual range it seems to calm down the cpu issue completely.

  • Cannot open the batch Scheduler in the workspace

    Hello

    I am currently having a problem in my test environment (11.1.2.1), where at the beginning of the batch Scheduler page in the workspace. I have the following error:

    ; nested exception is:

    com.hyperion.reporting.util.HyperionReportException:; nested exception is:

    java.lang.NullPointerException

    and the historical list of batches are not displayed.

    Check logs in FRLogging.log

    find the following lines:

    [2013 08-19 T 12: 13:42.615 - 04:00] [FinancialReporting0] [ERROR] [00300] [oracle. EPMFR.core] [tid: [ASSETS].] [ExecuteThread: '3' for the queue: "(self-adjusting) weblogic.kernel.Default"] [username: < anonymous >] [ecid: 0000K2NMavfD0j05JzO5yf1I4 ^ Aq00000B, 0] [SRC_CLASS: com.hyperion.reporting.config.FRConfig] [APP: LOAN #11.1.2.0] [SRC_METHOD: getProperty] are trying to get a property from undefined configuration (com.hyperion.reporting.HRPrefs.timezone)

    Tried the solution provided by Oracle

    1462084.1

    That did not work.

    Help, please

    Fixed the problem by copying all the files within the fr_scheduler_data of the FR scheme to another table. Remove them from fr_scheduler_data, then insert the same records to the table.

    Batch Scheduler started working as if by magic. I don't know what the problem was, probably has something to do with reviews.

  • Can I customize the body of the e-mail using batch Scheduler?

    Hi you all.

    I have an updated report to the point of financial reports and I send you by using batch Scheduler workspace (pdf attachment). What is happening is that this work generates a technical text with the steps made in the body of the email, which is not necessary.

    e.g.: "batch" BRASIL/Geral/Acomp. " "Showing (printing) / CV/rafa" was launched on Tuesday, December 13, 2011 16:46:39 am BRST Executed "BRASIL/Geral/Acomp. "Results (Email) / Informativo de Faturamento DIPRO_DEPIN ' State successfully for various saving options for 'BRASIL/Geral/Acomp. "Results (Email) / Faturamento DIPRO_DEPIN Informativo".
    The generated PDF file

    Batch ' BRASIL/Geral/Acomp. "" Resultados (printing) / CV/rafa "finished on Tuesday, December 13, 2011 16:46:45 BRST.


    I need just to attachment, not the body of the email. I'll send this email to read BlackBerry cell phone. Am I able to remove the body of the email before you send this e-mail?

    Kind regards
    Rafael Melo - BR

    Your problem is related to

    bug 9153034 - ALLOW EXCLUSION OF BATCH EXECUTION DETAILS FOR THE NOTIFICATION e-mail MESSAGE

    that will be fixed in version 11.1.3 in the current version is not possible.

  • Financial Reporting Batch Scheduler cannot send emails to users. Version 11.1.2.1

    Created a batch and on-demand workspace to run report. Regular batch ran successfully, but the Email is not generated for the user, even if we have provided a valid email address.

    Is this problem is known?

    Hello. Check the configuration of your software to ensure the integration of messaging is implemented.

    Eric

  • Print in batch Scheduler Word documents

    Hello

    I'm running 11.1.2.1 and want to plan a book that contains a Word (.docx) document and a text (.txt) file insert a financial relationship between them. I have the Print Service configured on a 32-bit server and R components & has on another server 64-bit. When a batch with just financial reports is annexed, it works fine, but when it calls other documents, it does seem that the financial reports of output.

    When I ran 11.1.1.2 it needed to install Microsoft office on the server of financial reports, but I don't know how it works in the new environment. In any case, I installed Microsoft Office 2010 32 flavor on these two servers, but I can't get the regular batch to exit all three. Only the financial report was released.

    Pointers or assistance would be greatly appreciated.

    Thank you
    Dan

    Try this:

    1. from Windows run dcomcnfg command-line
    2. Select the Application Microsoft Excel-> right click Properties-> Security tab open
    3. under Security-> permissions Select-> customize-> change-> add the user who is running the print server service and select access authorization.
    4. under Security-> "Launch and Activation permissions Select"-> personalize-> change-> add the user who is running the print server service and select access authorization.
    6. make sure that the user account of the network received the same access permissions.
    7. Select Identity tab-> select Interactive user.
    8. repeat the above steps for Microsoft PowerPoint Application & Microsoft Word 97-2003 Document
    9. under Windows 2008 64-bit, open Windows Explorer and create a folder called Desktop at this location
    C:\Windows\SysWOW64\config\systemprofile\

  • Load batch Scheduler (A, R) methods

    We currently charge 3 files of FDM of HFM. The first is loaded as a replacement of type 0. The second is loaded as merger of type 1. The third is loaded as type 2 accumulate. Which methods would I use with the batch charger to achieve? RR, RA, AA, etc. Thank you!

    Hello

    The first element of the load tag specifies the method to use when integrating data FDM to the importing stage 'R' will be a replacement, 'A' will be an addition. You can also have "RZ" and "AZ" who do but remove the values null at the import stage. It is the 2nd element that indicates the method of load HFM and can be either 'R' to replace, ' to merge and 'A' to accumulate. So, I suggest assuming that you always import ito using FDM that replace your batch file loading tag would be

    (1) RR
    (2) RM
    (3) RA

    All labels and options are detailed in the FDM Administrator's guide. I hope this helps.

  • Batch Scheduler

    IM already create batch to generete a PDF report on workspace, but when I realize the selection on the PDF export options I select export to an external directory... the directory I set up or is a default directory?

    In case I need to set it up, where I could do?

    =)

    You can configure which directories to export to updating fr_scheduler.properties
    Read more information on:-http://download.oracle.com/docs/cd/E12825_01/epm.111/bpmui_user/frameset.htm?BatchOutput.html

    See you soon

    John
    http://John-Goodwin.blogspot.com/

  • Cannot remove Task Scheduler batch with the status of 'market '.

    Hello

    I have a set of jobs during a given period (from Dec. 27 to Jan. 2) that appear in the 11.1.2.1 Scheduler batch of workspace as "Running".

    If I right click and choose 'Remove' it removes it from the list of Batch Scheduler, but if you click Refresh the work.

    I tried both the administrator and the owner of the lot without result. I stopped and restarted the entire system without result

    I think it's something on the SQL table to be blown out, I looked at our database of REPORTS and specifically the FR_SCHEDULER_DATA table but there just the JOB_ID and XML argument and nothing that I can clearly define

    Thank you

    JTS

    Celvin,

    I got this and I was on the right track, the STATUS field was 4 and had to switch to 3 (error), then remove

    Check and update the records with STATE = 4 FR_SCHEDULER_DATA

    Connect to the database BIPlus using a database client (SQL-Plus, developer, SQL, SQL Server Enterprise Manager, etc.)
    Run the following query to determine if there are records with a STATUS value of "4".

    SELECT * from FR_SCHEDULER_DATA where STATE = 4;

    If this query returns all rows, run the following UPDATE statement to set the value '3' (Note: '3' state corresponds to 'Error'.)

    UPDATE FR_SCHEDULER_DATA set STATE = 3 where STATE = 4;

    Retest opening Batch Scheduler interface.

  • Batch locks Scheduler workspace after put 11.1.2.1 at level

    The distributed env Win 2008 SP2 (not R2) with SQL 2005 DBs. All work great after migration 11.1.2 to 11.1.2.1 except Batch Scheduler.

    Go sail/calendar/batch Scheduler and batch Scheduler window hangs and does not show the lots.

    Anyone else get this?

    JTS

    Just give it to others if they have had the problem.

    We have solved this problem by a redeployment of the web server and ra framework and then batch Scheduler worked. Something in the config must have not set correctly.

    JTS

  • CPU latency

    I'm trying to find a definition of the time of latency (measured in percent) found in the CPU graph options in ESXi 5.0.

    The "description of counter" suggests "the percent of the time, the virtual machine cannot run because it is suitor for access to the physical CPU", which sounds very similar to the CPU Ready description that suggests the "percentage of time that the virtual machine was ready, but could not get scheduled to run on the physical processor.

    However, in my remarks, the latency of the CPU and CPU Ready move together.

    Any help much appreciated.

    Thanks, Liam.

    There are 4 States of CPU. At least according to the white paper of vSphere CPU scheduler 5.1 :-)

    Here is my understanding. Correct me if I'm wrong.

    4 States above gives 100%.
    100% = RUN + READY + % % WAIT CSTP

    When adding first, a virtual machine is RUN or in a READY State according to the availability of a physical CPU at the level of the ESX layer.

    A virtual machine in the READY State is distributed by the vmkernel CPU scheduler and goes into State of EXECUTION. In the executing State, the virtual machine is served by the hypervisor and can do what it is supposed to do. Latency of loan & CPU CPU are similar
    Latency: % of the time the VM cannot run because it's supported for access to the physical processor.
    Loan: % of the time that the virtual machine was ready, but could not get scheduled to run on the physical processor. [e1: this is the total of all virtual machines in the ESX]
    So it seems that the loan is after the latency time. Latency will go up first, as the favorite NUMA kernel might not be available, ready will follow when it has no basis available to all.

    It can be later off planned by vmkernel and enters a State LOAN or COSTOP. Co Stop happening if the virtual machine has > 1 vCPU and one of them is waiting for the other. Waiting happens because ESXi has insufficient physical CPU to serve. That's why you should right the size of the virtual machine. RDY % include % MLMTD, which is VM was ready to run, but has not been scheduled for time CPU due to the limit. You should not use Limit.

    The VM has stopped is launched jointly by the suite and enters the READY State, which is ready for use. So ready time does not include the time to stop Co. You need to measure them both.

    A virtual machine in the executing State may enter a WAIT state. Normally, it is because he is waiting for a resource and woke up later once the resource is available. It is normally the work of IO, such as waiting for a disc to return control of the table.

    When a virtual machine is idle, not to intervene, between WAIT_IDLE, a particular type of the WAIT state. So it's not actually not waiting for what it is. A world of slow motion is awoken whenever it is interrupted.

    WAITING also includes % SWPWT, which is CPU waits VMKernel swap memory

  • 11.1.1.3 planning batch report planning via the command prompt

    Hi guys. We are under planning 11.1.x, and have a bunch of statements of lots that are implemented using batch Scheduler. I want to be able to run reports of individual lot of a command batch on the server prompt. How can I do this? I see that there is a way to export to command line or something like that batch Scheduler but do not know how to proceed.


    Thank you.

    Reading of:-http://download.oracle.com/docs/cd/E12825_01/epm.111/fr_user/ch15s05s02.html

    See you soon

    John
    http://John-Goodwin.blogspot.com/

  • FRS - establishment of the schedule of work

    Hello

    In FRS, we can plan work? If so, then how do schedule us a task?

    According to the help file... He said: go to the Explorer mode > > Navigate > > Schedule Job

    But I am not getting any scheduling option in Solution Explorer.

    T & R
    Abhishek

    Financial reports, you need create lots (report groups) and then schedule those.

    In the Workspace menu: Navigate > Appendix > Batch Scheduler

    It isn't as much flexibility with planning as with a "job" (jobs don't apply only to the IR).

    In 931 version there is a great feature called cutting, allowing you to push reports (batch) burst on members in a dimension for example region.

  • HP Envy 17 t - 3200 CTO: malfunction of the system equipment preventing startup. What material is dead?

    Got a HP Envy 17 3200 CTO LOADED at the time. Quad core, Radeon HD 7850M, etc.

    Well the other day something blue screened but froze during this process and seeds of graphs in this screen. Corruption and blocks appeared and disappeared. I was forced to close during the blue screen as something bigger was not working for the crash dump process, it stood at 0%.

    To restart the device display lights, and no noises are made beeps indicating a problem. The Bluray makes his usual preparation sounds it does every time you start upward. He's sitting with a white screen which seems not even to be turned on. The only other indicator is the key caps lock flashes several times and turns off, then blinks several times and turns off, repeating this sitting here...

    What part is probably dead on this sucker? CPU? DRAM? Motherboard? Graphics card? How badly can I turn if he doesn't...

    While he sits there, various lights keyboard are on as said... Caps lock flashing.
    Power LIGHT on. In my view, that the wireless light too... The light HP envy on the hood is also on...

    Come here to get advice because I do auto repair. No guarantee. I'll buy the requested Party and auto install like I always do for my laptop.

    Hi @woggles,

    Thanks for posting HP forums!

    I read your post and wanted to help.

    I understand that your laptop has crashed with blue screen, and after the forced shutdown, it starts with the white screen and some LEDs + flashing.

    You can check the link for the LED codes: HP - computer laptops does not start and Emits a LED or beep Code

    It is best to follow the steps on this link: HP Notebook PC - computer won't start (Windows 10)

    Let me know how it goes.

    If this helps you to find a solution, please click on the button "Accept as Solution" down below in this message. If you want to say 'Thank you' to my effort to help, click on the "thumbs up" to give me congratulations.

    Kind regards

  • HP Envy dv6z-7200 windows 7 drivers

    I bought this laptop about a month ago and it came with windows 8. I had many problems of lag with windows 8 specifically the broker store sucking my CPU usage, I also had problems with the mouse causing windows pop up with the operating system. I threw the windows 7, a single usb port worked thereafter, but it was enough to download some drivers networks so I can get on the internet, well then I downloaded drivermax and went to the city. Unfortunately now none of my usb ports work, I have also some bass with my beats speakers and usb drivers and its narration are up-to-date, in my device manager I have pci device, sm and 2 controllers under other devices usb bus controllers, saying they need drivers, windows does not find and pilot says my usb key max are up-to-date the other two drivermax says need to update but I have no more download for awhile, please help?

    Hello:

    Here are the links to the drivers, I think that you need.

    First, install the AMD chipset drivers and restart.  You want the first file listed in the page.

    This should install it the smbus and usb3 controllers.

    http://support.AMD.com/en-us/download/chipset?OS=Windows%207%20-%2064

    Audio: See if it works.

    http://h10025.www1.HP.com/ewfrf/wc/softwareDownloadIndex?softwareitem=ob-107964-1&cc=us&DLC=en&LC=en&OS=4063&product=5292556&sw_lang=

    PCI device:

    http://h10025.www1.HP.com/ewfrf/wc/softwareDownloadIndex?softwareitem=ob-103897-1&cc=us&DLC=en&LC=en&OS=4063&product=5292556&sw_lang=

Maybe you are looking for

  • 5901tw flow 8: [Please help] unable to connect to 4G network card, driver missing HUAWEI Mobile Broadband Module

    Hi all I just bought 8 streams HP 5901tw 4 days ago, yesterday, after internet connection using my card of 4G (WWAN driver) in my Tablet 8 Stream, suddenly the internet connection dropped and I lost my 4 G network card. I don't know why it happens by

  • Problem mit Starten iMac Serial - Nr.: YM * ZE 3

    iMac Serial - Nr.: YM * ZE 3 Version: The Version OS X Yosemite: 10.10.5 Problem: Mein iMac shows eine Startbildschirm mit Fragezeichen (?) versehene Aktenmappe? See Foto:

  • Specifications

    Hello sir.i wanted to know on my laptop, I bought in June this year... its hp pavilion 2312tu... g6 I heard his hdd & motherboard is replaceable, if there is no problem... I also use addiotational 4 GB of ram if I want... wanted to know more about it

  • My product key has been blocked... why?

    Yesterday, I installed Windows 7 (32 bit) in a Machine virtual VirtualBox; but the machine has got corrupted. so I reinstall Windows 7 again, today. I couldn't enter my product key, so I did the "slmgr.vbs-ipk PRODUCT KEY' then"slmgr /ato"(without th

  • Impossible to reinstall Win 7 partition recovery on Inspiron N5110

    I've read a lot of posts on this topic, but have had no success. I did this sort of thing for many years... very frustrated right now. This machine is a desktop of my church. Someone slammed the touchpad left click key and he stuck a couple of weeks,