Anyone have any suggestions about a good capacity planning tool?  Aware and some exposed to the CapacityIQ and vKernel and reflected on the operations of vCenter.  Someone at - it experience with VMTurbo or SolarWinds?  Thank you

I would also like some the best analytics that I saw in the treatment of pre-virtualization capacity planning through immune in the mix - as long as the ongoing capacity management.

Tags: VMware

Similar Questions

  • Strength of re - download all the data the Capacity Planner tool

    Hello

    I have a situation where a colleague installed Capacity Planner on a site and left on for more than a month before having a capacity planner account in the warehouse of VMWare (optimize.vmware.com).

    This means that the tool has been happily collecting data locally but he not sent to the Web site.

    He obtained his full story last week and made the link to the online store by registering its local database with the site ID. However, it seems that the capacity planner tool has not downloaded all the data it has collected - he made only in the last two weeks, and it doesn't seem it's going to 'catch up' and recover old data.

    I looked in the local Access database and you can see all the old data in there. Question - is it possible to force a re-synchronization of all data in the local database, while the old data are sent to the server? I tried Admin/Options/Modules, enter the work of data synchronization and uncheck everything except export data collection and send data, then manually run this task of data synchronization, but he only made a partial dump of the data.

    If the data have never been sent to VMware.  The data must be in the folder "c:\program files\vmwaer\vmware capacity planner\outbox.

    If the data have been sent, and archive check box has been selected, the data must be in the folder "c:\program files\vmwaer\vmware capacity planner\archive.

    If the data has been sent and the box archive was not checked, then the data will be only at VMware.  You will need to contact vmware to reprocess data.

  • character set and the capacity planning

    Hello and happy new year everyone!

    A question again:

    How the impact encoding charset (e.g. UTF8, WE8MSWIN1252. etc.) on the storage space uses?

    I would like to a planning capability for a large DWH with 10 TB of data that grows to about 1 teaspoon per year.

    Thanks in advance,

    Concerning

    Please visit http://docs.oracle.com/cd/E11882_01/server.112/e10729/ch2charset.htm#i1007681

    All your questions will be answered.

    Happy new year.
    ------------
    Sybrand Bakker
    Senior Oracle DBA

  • My file has plenty of empty space 'outside' of the work plan that I can't get rid of? How to crop the file to the artboard size real?

    Screen Shot 2016-02-12 at 1.05.55 PM.png

    Above is my plan of work and space to work, but when I try to resize the image (or save it in jpeg format to show the problem I have) there is a ton of white space outside the artboard and the crop tool and two work plan tool say that my file is not as large as the size above , but its been as big as the screenshot below.

    Screen Shot 2016-02-12 at 1.05.57 PM.png

    I can't find anyone else having this problem. Am I the only one? How can I solve this problem? It is to be a huge problem for web design. And he did it for all of my projects as web design he updated to have work plans.

    Hi Nicole,.

    I'm sure that it is a problem that we followed. We have not addressed it yet, but it's on our list of things to fix.

    Plan of work documents have a canvas in auto-expand; This is part of the user experience, which gives a feeling of infinite to the document; You can place things anywhere in the view, and they should remain visible no matter where you drag. In order to maintain this illusion, paint us the entire surface to mate with the same color outside work plans.

    Hide us this canvas from you, even if it's still there. You can see how big it is at any time by choosing "Image > canvas... size. ». That size will change as things move around, getting bigger and smaller than necessary. The hidden canvas size will break to the next more or less 'limit of diamonds", which is nominally in increments of 1024 pixels. This is done for performance.

    The problem is that the export code is really not updated as the work plans can develop and reduce the canvas. When you export a document of work plan, it looks at the current size of the Web and uses only. That's why you get that extra white space. This extra space problem happens also for other things, like thumbnails of document. We agree it's pretty boring, and as I said, it's on our list to fix.

    Try this workaround:

    1. download your ready to export document.

    2. in the work plan tool, select the gear icon (top tool bar, far right) and uncheck auto-size canvas

    3. Select the Rectangle tool and cover the artboard from edge to edge. (Snap allows here)

    4. Select the crop option. This can reduce the canvas to just the boundaries of the artboard.

    5 export under..., choose your format, for example PNG. and export.

    6. don't check any extra white space.

    Note that "Web auto-size" is a property of document-sticky and is saved with the document.

  • Capacity Planner tool query

    I have following queries about this tool:

    1 can I use several model material for one scenario for example if I need to develop two types of material saying low and high-end and would like to place the result of the VM, is there an available way to achieve this?

    2. If the server under evaluation receive their IP address of the DHCP server and evaluating servers go down during the assessment and it comes back later with diffferent IP how corelate the previous data?

    3. as a follow-up to Question #2, what happens if the IP remains same. It will be able to collect data from the systems being evaluated?

    4. I need to understand the "Averge industry" in detail. What is the basis of filling it and how he is referred to as "Standardized", without providing details.

    First of all. My experience of the Capacity Planner tool is old, then you want to dubble some offsets verify what I say.

    1. you must decide what systems are low-end and high-end. Then, you make a scenario using the 'high end' group modeled on high-end hardware. Then, obviosly, the Group of low range on a low-end hardware. To my knowledge there is no way for the Capacity Planner automatically determine what are the high or low end systems and plce on different hardware models.

    2 capacity planner will then see that as two different systems, BUT, even if you have a DHCP server based Park (which is not so common actually) server and the server has been down longer the term of the lease to configure the DHCP scope the first thing that the server will ask you when it comes is back the permission to use the last him, called IP address. So if that is not granted to a plaintiff again the server will come with its old IP address in most cases.

    3. Yes

    4. the 'average/standard industrial' is simply statistical. For example if the average of 1000 SQL servers out there shows a specific behavior and your SQL Server performed way differently (uses a lot more resources), then you might want to consider why your implementation is so different. To avoid purchase Super material just to accommodate a messed-up SQL Server when you might be happier with a slower material, or less, if you just set your SQL implementation. That's all.

    / R

  • capacity plan

    What is the capacity plan when creating the database...

    Generally, it is the projection that make you about how much space or other equipment, you'll need over time because the database grows. If you build a data warehouse, for example, you can expect he will move from an initial size of 500 GB to 2 TB, say, the initial period of 2 years. Which may require the purchase of hardware over time or buying a bigger server initially. Of course, there may be a lot of variation how accurately the capacity plan is, how far it goes and how sophisticated it must be. For example, if there are a lot of unknowns, you may need to several capacity plans for environments 'weakness of growth' and 'strong growth' or from other kinds of contingencies.

    Justin

  • message comes up saying storage is full. The capacity is 13.5 GB. I bought storage monthly plan 50GB (icloud) message still says ipad is full. Why?  UD) I bought the storage

    I have a version 7.1.2 IPAD2.  The capacity is 13.5 GB. Message comes up saying storage is almost full. I bought the extra 50 GB storage for this (icloud) plan monthly - in settings according to usage.  45 GB is always available. Why message rises who always says "complete storage '.

    You have purchased storage iCloud.  This is used to store things like backups and if necessary documents and data to share with other Apple devices.

    Your iPad storage is full.  This has absolutely nothing to do with your iCloud-storage space.  You can not buy additional storage for your iPad.  When you run low on storage of the iPad, you have two options:

    • Managing the storage of iPad with settings > General > storage & use iCloud > manage storage.  Remove items from your iPad you need is no longer.
    • Sell your iPad and buy a replacement with more storage.
  • Everything on the evaluation tool of the premises before the draft plan VDI?

    Hi Xperts

    Got a requirement to search for Virtual Desktop Infrastructure [VDI] project in our Organization.

    Found systrack assessment tool to help for my assessment of VDI project. However, it is not on the local tool and they mentioned that all data collected will be recorded on their cloud.

    Is it safe to use? Also, can we get any on the free local VDI assessment tool? Help, please

    The VMware at the edge of the Lake Systrack tool has the ability to be deployed on the premise, I suggest to contact your VMware representative and discuss this option.

    Reference: https://assessment.vmware.com/SDA/Docs/SDA_FAQ.pdf

    Q. what happens if my organization prefers to use a local tool for evaluation and analysis?

    A. the software Lake provides a solution on site that provides virtually the same functionality and is recommended for environments with sensitivity for the security and confidentiality of data.

  • Is there a tool or function (in Illustrator or InDesign) that selects any form and 'punches' a 'hole' of this form down through several objects for the paper or the work plan?

    Is there a tool or function (in Illustrator or InDesign) that selects any form and 'punches' a 'hole' of this form down through several objects for the paper or the work plan?

    Your objects punch must be in a large group; It will cut through all that is below.

    Create the shape you want to cut and set it to black Uni. Select your group and your form and (in the transparency palette), click make mask.

    Uncheck the Clip, and then return to the palette.

  • The P6 capacity planning

    all. Thank you.

    Notice of capacity planning draws a number of recordsets (projects in a portfolio, project types, roles in a portfolio, the role data spread and role schedules) that are used to display the planning grid capacity, but according to the user's selection, that it applies to a logic of treatment (i.e. adding by chronology) before the user discover interface is rendered.

    I played around with this a bit and here are a couple of SQL which may help you point a response (just a guess on my part, I hope it will tell you in the right direction).
    On a side note, I think that using the web services of P6 SpreadService.ReadProjectRoleSpread would be easier and less messy!

    I think you need some SQL queries to get recordsets which are necessary for the capacity view planning information use.

    1. the projects of a given portfolio
    2. the roles on projects within a given portfolio
    3. divide the data for each project by role
    4 data on the calendar for each role (play time more so I don't look in this dimension)

    Projects within a given portfolio:

    DECLARE @PortfolioName varchar (255)
    SET @PortfolioName = ' key projects plus $500 K.

    SELECT pw. WBS_ID, pc. PROJ_ID, pw. WBS_NAME, pc. PROJ_CATG_ID, pv. PROJ_CATG_NAME
    PCATVAL PV
    INNER JOIN PROJPCAT ON a pc. PROJ_CATG_ID = pv. PROJ_CATG_ID
    INNER JOIN PCATTYPE pt ON pt. PROJ_CATG_TYPE_ID = pc. PROJ_CATG_TYPE_ID
    INNER JOIN PROJWBS pw pw of ONE. PROJ_ID = pc. PROJ_ID
    INNER JOIN PRPFOLIO pr WE PR. WBS_ID = pw. WBS_ID
    INNER JOIN PFOLIO ON PF pf. PFOLIO_ID is pr. PFOLIO_ID
    WHERE pt. PROJ_CATG_TYPE = 'Type of project.
    AND PF. PFOLIO_NAME = @PortfolioName
    ORDER BY pv. PROJ_CATG_NAME, pw. WBS_NAME

    Roles of the projects within a given portfolio

    DECLARE @PortfolioName varchar (255)
    SET @PortfolioName = ' key projects plus $500 K.

    SELECT sr. SUMTRSRC_ID, sr. PROJ_ID, sr. WBS_ID, sr. ROLE_ID, pw. WBS_NAME, rs. ROLE NAME
    OF SUMTRSRC sr
    INNER JOIN projwbs pw WE sr. PROJ_ID = pw. PROJ_ID AND pw. PROJ_NODE_FLAG = 'Y '.
    INNER JOIN PRPFOLIO pr WE PR. WBS_ID = pw. WBS_ID
    INNER JOIN PFOLIO ON PF pf. PFOLIO_ID is pr. PFOLIO_ID
    LEFT OUTER JOIN PROJECT pj IT sr. PROJ_ID = pj. PROJ_ID
    Pw1 LEFT OUTER JOIN PROJWBS ON sr.wbs_id = pw1. WBS_ID
    JOIN EXTERNAL LEFT rs ROLES WE sr. ROLE_ID = rs. ROLE_ID
    WHERE sr. SPREAD_TYPE IS NULL
    AND PF. PFOLIO_NAME = @PortfolioName
    AND sr. RSRC_ID IS NULL
    AND pw1. PROJ_NODE_FLAG = 'Y '.
    ORDER BY pw. WBS_NAME

    Data propagation for each project by role

    DECLARE @PortfolioName varchar (255)
    SET @PortfolioName = ' key projects plus $500 K.

    SELECT sr. SUMTRSRC_ID, sr. PROJ_ID, sr. WBS_ID, sr. ROLE_ID, sr. Start_date, sr. END_DATE,
    SR. SPREAD_TYPE, sr. STAFFED_TOTAL_QTY, sr. UNSTAFFED_TOTAL_QTY, sr. STAFFED_REMAIN_QTY, sr. UNSTAFFED_REMAIN_QTY
    OF SUMTRSRC sr
    INNER JOIN PRPFOLIO pr WE PR. WBS_ID = sr. WBS_ID
    INNER JOIN PFOLIO ON PF pf. PFOLIO_ID is pr. PFOLIO_ID
    WHERE sr. SPREAD_TYPE <> 'FinancialPeriod '.
    AND PF. PFOLIO_NAME = @PortfolioName
    AND sr. SPREAD_TYPE IS NOT NULL
    AND sr. RSRC_ID IS NULL
    AND sr. PROJ_ID IS NOT NULL

    Still, I didn't spend at any time to check to see if I had all the records of right and I really think that the using the SpreadService.ReadProjectRoleSpread would be more approach better to get the information you want but it was fun looking for a solution.

    Gene

  • Restart a session of planning tool instead of the operator

    Hi all
    We can restart a session failed in opertaor to restart from the component where it failed. Is it possible that we can restart a session in any Scheduler tool? If we restart a script from a planning tool of course it will run in a new session and not to restart the session failed. Any who have implemented this?

    Thank you
    Leeloo

    It is possible to restart a session, the current session that failed if you wish. This can be done from the restartsession.bat/sh from the operating system command, or you can use the Web service, or by using the api call.

  • SOA - EAM capacity planning

    I was handed a subpoena to prepare the "documentation of capacity planning" for what we call «Enterprise Application Messaging "(EAM).» I'm looking at the Oracle Fusion Middleware documentation and in particular Oracle® Fusion Middleware Guide of Installation of Oracle WebLogic Server Release 1 (12.1.1) 12 c that has certain essential prerequisites for mounting. This is a good start, but I know that there more planning capacity in the context of this notion EAM, as for example a database to persist messages etc and then, there are the "speeds and feeds" to consider.

    My question is: are there white, recommended books or presentations of open world that are more recent than the 10g documentation and presentations that I found on the research that would throw the Oracle Fusion middleware more in a 'generic EAM context' this installation of 12 c documentation produced, I am to research to?

    878073 wrote:
    There are some large diagrams you gave me and I sincerely thank you for your quick response... 1 million thanks!

    No worries mate, but don't forget to mark the reply as useful/correct... Thank you!

  • Satellite L650 - recommendation of the OS and can not install drivers

    HY,

    a deploy a satellite L650 - 18 X and I tried to install windows 7 seveeral times... (x 64 editions) without success, I managed to install an edition clean windows 64, works fine but I have a problem, cannot install the drivers for the keys fn; coomon installation module tracks ask for a reboot but after reboot when I want to install other drivers for the "common module not found" displayed error fn keys...

    I want to know what operating sistem u would recomand me and so is windows 7 How do I find sata driver, o I already serch the forum how to do this on the l series, but could find nothing

    Hello

    > I tried to install windows 7 seveeral times... (x 64 editions) without success, I managed to install an edition clean windows 64
    Where is the difference between Windows 7 64-bit and Windows 64 edition? In my opinion it of the same

    In any case, best recommendation of OS is version preinstalled Windows in my opinion, because he configured Toshiba s with all the drivers and tools you need. No additional installation is necessary and your laptop is ready for use.

    Generally for the FN keys you need Toshiba value added from Toshiba Web site package.

  • Separate 0v track of the ground plane

    Hello

    Is there a way to have a plan of mass (net 0) and a separate record, which is also on the net 0, the idea being that the separate track is carrying a high current and I'm not being developed on the ground plane. When I draw the trace and then add a ground plan, brings all of this together, ideally I want only 2 to respond to the level of the input connector. I have worked around this in the past by placing a dummy ferrite to the Board of Directors and by assigning the other side of it to DGND but hoped a built-in way to handle this.

    Thanks for any advice.

    RGS,

    Lucither.

    RGS,

    You have a few methods to do...

    Separate reasons of a. threaded and net bridge.

    You can implement the design as you have already done - create ground ' net 0' and create a separate ground net "cgnd" or "dgnd", etc... ".  For these nets, rather than create a powerplane (Place-> Powerplane...) create a separate copper (site-> box of copper) for each individual network area.   Rather than tie them with a component 'false', you can tie them with a net bridge (Place-> Net bridge) to create a star of the Earth at a single point.   The only drawback to a net bridge is that it is run only in Ultiboard - there is no reference to him in Multisim.   You can create an element of resistance only simulation (black color) in Multisim with a very low value and label this R_netbridge to take this into account and tie between '0 'net and your soil replacement.   I also already posted on other patterns and symbols that you can use.   I also asked this for a future version of Multisim.

    http://forums.NI.com/T5/circuit-design-suite-Multisim/isolated-ground-and-analog-ground-in-Multisim/...

    B. only reason net split with polygon separator.

    You can create a single ground plane (Place-> Powerplane...) and then use the polygon separator to divide the plan as the strong current flows only back to the point of mass star.   The tool is located in the menu (Design-> Spllitter polygon) - Note - I think that its only available on UB PowerPro so.   At this point, the user must define how the plane is trimmed.  Don't forget that you're not carve out islands that do not connect back to a common point.    One tip is to start from the edge of the Board or of the polygon and work toward the point of the star on the ground.   Also note that some of the polygon / aircraft parameters can reverse the polygon splitter settings, you may need to adjust the settings if you don't get good results.   If you enable the plane and go to properties - tab "Copper Zone" has the vacuum/Island settings I give caution all.

    C. create unique net, copper area allows to separate

    You can create a single net, but then use the place-> copper area to separate the plane manually as needed.   The polygon tool lets you create individual islands - and you have to manually link them to a single point.

    Kind regards

    Pat

  • HP ENVY 4522: Recommendations of the thickness of card

    Hi all

    Can anyone recommend what the limit is on the map of paper/thickness? I tried 300 g/m², but is not pulling the card to start and accordingly the print appears longer bottom on the map. I plan on trying 275gsm then and slowly moving down until I know, but I was wondering if someone could recommend thickness in gsm?

    @Goardo

    Specifications > handling paper lists the supported paper:

    Location

Maybe you are looking for

  • New folder and bookmark all tabs no longer work. How to fix it please?

    A recent problem. All is well until I click on the button 'Add '. Nothing happens.I tried to disable all extensions without effect on the problem.Appreciate any help. Thank you.

  • How to set the function key that you want to run at startup?

    HelloI have a problem until I realized that the special function working keys such as high brightness downbut now, you must open the application feature keys to make it work. I tried the bios settings, but it wasn't the problem. I think the question

  • microSD, microSDHC, adapters in the Lynx (K3011)

    Anyone know for sure if this tablets works with the 3 typse os microSD cards on the market today?

  • IPhone 6s battery

    I just bought an iPhone 6s more brand new at & t running iOS 9.1, 64 GB to 50% screen brightness and I have disabled about all things about it that would drain the battery. It really did nothing. I get only 7.5 hours of battery life with background r

  • Show: not allowed to manage data

    Well, I had the upgrade work and everything seems good, except when I go to edit the configuration files and manage data, I get: show: not allowed to manage data I checked that the edition code is in: datamanagecode editcode enadiscode and I don't se