Compliance of first LMS4.2 and failure Psirt/Eox Job policy
Our first LMS 4.2 compliance policy and Psirt/Eox job keeps failing for a day, no matter if I select to use Cisco.com or Local as an option. When you use Cisco.com as option, reported an error: Summary of the offer Description: System compliance poli
The traffic is not correctly distributed through each link of etherchannel.
Dear team, You can all have a clue on below. I have a cisco 3560 and created the port-channel switch and assign the port two to Po1 switch is connected to the HP VC. The question is highly uses a single port and on the other port no traffic is there.
Port of limitation of the rate on Catalyst 3550
I'm having the same problem, as shown in the following cases: https://supportforums.Cisco.com/thread/161768 However - even when this is defined as an access port - it does not rate limit - should be limited to 2 MB by rate (a port traffic going in on
EtherChannel problem for 6500 VSS
Hello team, Could someone suggest if I use a lot of running etherchannel configuration between my access (4500) and DS (6500) can create any problem to etherchannnel. In my environment, I am experiecing my interfaces of contactors provided access dow
IPSec and used keys
Hello world. When you use ipsec (AH / ESP), authentication and encryption requires a secret key as dicussed in the following snippet: Authentication allows you to calculate a value (ICV) integrity checking on the contents of the package, and it is us
3750 X problem battery
More scholars. I'm kinda stuck with it, and I would be grateful for the help of those who have brains more than me. Situation is this - I have a couple of 3750 X batteries - two switches in each - that are configured to provide redundancy for attache
Port-channel problem: SP-5-CANNOT_BUNDLE_LACP
I'm having a problem with the upcoming port-channel. Right now it is "down down". I don't really know why. All channels on the 6500's in VSS port works fine. This one seems to be giving me one question though. -The two interfaces that use this port c
3750 x stacking
Hello I have a stack of 5 3750 x switches installed and I have another place with 1 switch, I took one of the 5 switches (last switch # 5) and he stacked to the stand-alone switch. everything works fine, except for the interfcaces, he continues to co
Configuration of multiple VLANs on the Campus network up to 800 users
Hi all I design a network for our client who has a campus network to: currently: 250 users, near future Expansion (3Months): up to 650 users; Future users of 1000 Expansion(6_Months):upto There are various services such as students, teachers, Admin,
A matter of design of LAN switch
Let's say in a configuration there are two standalone Cisco 6509 switch core (core 1 and core 2), connected each other with between etherchannel link. Interface VLAN (vlan 10,20,30,40) was created in the two switches to base with the HSRP configured
3750 stand-alone switch battery change error message displays
We have some 3750 autonomous through our network. IT restarts automatically. through the history of logging, it shows Stack_Link_Change message but this switch is autonomous. ---------------------------------------------------------------------------
Cisco 6500 Series install w / sup
Hello I am new to this forum and have been assigned to a project to make a "provisional" for a few Cisco management frameworks installation 6509, 6504, 6513 and 6500 all with SUP32. I've only used before independent Cisco Catalyst switches so this is
SH cdp neighbors port-channel command
Hello I have a strange problem with the command sh cdp neighbors port-channel on my 3750 and 4500switches. When I execute the command ' sh cdp neighbors port-channel. I don't see my say on this interface. The command 'sh cdp nei' with the port-channe
High utilization of the processor in Mode VSS when traffic through the internet.
Hi all I have a problem with the installation of VSS. The VSS service install act as a central office switch of transit for internet traffic and the problem arises when there are about 600 Mbps of traffic through the switch. We notice that there are
Impossible to get my 3560G switch talk to ESX 3.5 and the EMC NAS servers.
I tried for the past two weeks to get my 3560G switch to talk to a couple of ESX 3.5 servers, but VC and the EMC NAS. The goal is to implement 2 Etherchannels on the physical switch and aggregation of NETWORK cards on the vSwitch. A port-channel will
LMS unit 3.2 received 3750
Hey everybody. I noticed that all my 3750 s, even if some are autonomous, are recognized as 3750 battery by LMS 3.2 (and incidentally 2.6). This isn't really a problem for most things, but I do turn int a problem when it comes to the basic model conf
Upgrading switch issues
I currently have 5 switches catalyst as the backbone of my data center 3548XL. I want to my network of the segment that is planning to do so using a combination of VLANS, VTP on the switches and using my router gateway as a router-on-a-stick with vir
Migration of a single LMS deployment to a MultiServer deployment server
We have independent LMS 3.0.1 Server (server a) in production right now with a few broad DFM notifications by e-mail. We intend to move DFM on its own server (Server b) and integrate its Netcool traps and then have netcool do the generation email and
Giga piling on 3550 switches
We have two WS-C3550-24-PWR connected with Cisco systems GigaStack® Gigabit Interface Converter (GBIC), two, one on each switch connected to a Cisco Gigastack cable supplied. The problem is that many noticed collisions collision approximately 1 megab
Question DRAM 2651XM
Hello I have a 2651XM router that has been shipped with a 128 MB RAM. I want to upgrade this to 256 MB. I have a 15 - 8693-01 memory card already present on the router. I inserted the DRAM 128 card obtained from cisco, but have some problems here...